Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ROCKAWAY BEACH BLVD. CONSTRUCTION NYC DOB building permits | 9 | Plumbing · Herewith filing for relocation and installation of plumbing. No product keyword matched | 0 | Jun 18, 2026 |
| B | YAASA CORP NYC DOB building permits | 9 |
Plumbing · Modification and proposed new plumbing fixtured in the existing retail space U.G.-VI No product keyword matched |
| 0 |
| Jun 18, 2026 |
| B | GOODMAN NYC DOB building permits | 9 | Full Demolition · FILING HEREWITH PARTIAL HAND AND PARTIAL MECHAINICAL DEMOLITON OF 1 STORY BULDING WITH CELLAR. No product keyword matched | 0 | Jun 18, 2026 |
| B | MOUNTAINSIDE MIDTOWN NYC DOB building permits | 9 | General Construction · INTERIOR DEMOLITION AND CONSTRUCTION AS SHOWN ON PLANS No product keyword matched | 0 | Jun 18, 2026 |
| B | GENGRIC DESIGN LLC NYC DOB building permits | 9 | Mechanical Systems · To install new HVAC system. No product keyword matched | 0 | Jun 18, 2026 |
| B | LAPIETRA CONTRACTING CORP NYC DOB building permits | 9 | Construction Fence · Temporary plywood construction fence No product keyword matched | 0 | Jun 18, 2026 |
| B | KAJA BUILT INC NYC DOB building permits | 9 | Mechanical Systems · mechanical work for existing apartment on 5th and 6th floor - unit placed on roof No product keyword matched | 0 | Jun 18, 2026 |
| B | SCHNELLBACHER-SENDON GRO* NYC DOB building permits | 9 | General Construction · FACADE RESTORATION AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 18, 2026 |
| B | IRONBO, INC NYC DOB building permits | 9 | General Construction · Installation of 1 access ladder to roof and new guardrail on roof. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 18, 2026 |
| B | YORK MECHANICAL CORP NYC DOB building permits | 9 | Structural · CONDENSER WATER PIPING REROUTE: REMOVE EXISTING LEAKING CONDENSER WATER EXPRESS RISERS AND PROVIDE NEW EXTERIOR SUPPLY AND RETURN RISERS ALONG THE SOUTH FACADE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | INSERRA SUPERMARKETS,INC. NYC DOB building permits | 9 | Structural · Structural work in conjunction with Architectural Application B01044719. No product keyword matched | 0 | Jun 18, 2026 |
| B | fila service inc NYC DOB building permits | 9 | Mechanical Systems · HORIZONTAL EXTENSION OF EXISTING 1 FAMILIY HOUSE, NO CHANGE IS USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | CURRENT FIRE PROTECTION I NYC DOB building permits | 9 | Sprinklers · Installation of temporary sprinkler loop in the cellar. No product keyword matched | 0 | Jun 18, 2026 |
| B | MATILDA AVE PROPERTY LLC NYC DOB building permits | 9 | Plumbing · Plumbing work being filed in conjunction with Alt CO. No change to use, egress or occupancy. No product keyword matched | 0 | Jun 18, 2026 |
| B | SAN JOSE BROOKLYN LLC NYC DOB building permits | 9 | General Construction · NEW ONE STORY WAREHOUSE BUILDING No product keyword matched | 0 | Jun 18, 2026 |
| B | BSJD PROPERTIES LLC NYC DOB building permits | 9 | General Construction · RENOVATION AT EXISTING 1ST FLOOR INVOLVED IN GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH TO CURE ECB VIOLATION#39146714R. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | BE@ WILLIAM CONDOMINIUM ASSOCIATION NYC DOB building permits | 9 | Mechanical Systems · INSTALL NEW COOLING TOWER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | MTS REALTY CORP NYC DOB building permits | 9 | Mechanical Systems · ROOF TOP SPLIT SYSTEM UNIT HVAC REPLACEMENT FOR EXISTING BUILDING AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | KINGSVILLE INVESTMENTS NYC DOB building permits | 9 | General Construction · Stone and brick repointing, replacement of cracked/spalled brick, stone and wood. scape, prime and paint rusted metal frame and lintel No product keyword matched | 0 | Jun 18, 2026 |
| B | DON MIGUEL RESTAURANT NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - DON MIGUEL. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | Metro Organics & more NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - METRO ORGANIC SNACKS & MORE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | ON TOP RENOVATION INC NYC DOB building permits | 9 | General Construction · ALTERATION TYPE I FOR THE CONVERSION OF AN EXISTING 2 STORY & BASEMENT (1) FAMILY INTO A 2 STORY & BASEMENT RESIDENTIAL BUILDING. No product keyword matched | 0 | Jun 18, 2026 |
| B | DEO GLOBAL CORPORATION NYC DOB building permits | 9 | General Construction · TO PROPOSE INTERIOR RENOVATION OF EXISTING APARTMENT #13-131 ON 13 FLOOR WITH GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | DIXON ADVISORY NYC DOB building permits | 9 | Structural · FACADE REPAIRS AS PER PLANS FILED HEREWITH FOR FRONT AND REAR FACADE. No product keyword matched | 0 | Jun 18, 2026 |
| B | 264 N9 Developments LLC NYC DOB building permits | 9 | Full Demolition · PROPOSE FULL DEMOLITION OF EXISTING 2 STORY RESIDENTIAL BUILDING WITH CELLAR. THE DEMOLITION WAS PREVIOUSLY APPROVED IN BIS- JOB #322103228 AND HAS EXPIRED. No product keyword matched | 0 | Jun 18, 2026 |
| B | EMPIRE EQUITIES NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - GOTHAM BURGER SOCIAL CLUB. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | S.M.C.B. ASSOCIATES NYC DOB building permits | 9 | Plumbing · New plumbing fixtures to be installed for floors Cellar, 002 through 004 and cap and removal of 15 gas fixtures No product keyword matched | 0 | Jun 18, 2026 |
| B | MACRO CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION TO EXISTING APT FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | CLEARCOM WIRELESS LLC NYC DOB building permits | 9 | Suspended Scaffold · IRA for the vertical conduit location inspection No product keyword matched | 0 | Jun 18, 2026 |
| B | CINQUEMANI NYC DOB building permits | 9 | Plumbing · REPLACE 3 EXISTING FIXTURES INKITCHEN AND BATH. RELOCATE STOVE AT APARTMENT 3L No product keyword matched | 0 | Jun 18, 2026 |
| B | PRAT ENTERPISE, CORP NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED No product keyword matched | 0 | Jun 18, 2026 |
| B | Velocity management NYC DOB building permits | 9 | Curb Cut · HEREWITH FILING AN APPLICATION FOR THE REMOVAL OF A CURB CUT. THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | RUIZ HOME REMODELING & DE NYC DOB building permits | 9 | General Construction · EXISTING CONDITIONS FILED TO BE CORRECTED AS PER OATH/ECB VIOLATION #39160041M); PROPOSED ALTERATION OF CofO TO SHOW EXISTING GARAGE REMOVED FROM BUILDING. No product keyword matched | 0 | Jun 18, 2026 |
| B | BORGETTO REALTY CORP NYC DOB building permits | 9 | Boiler Equipment · REPLACE BOILER AND OIL BURNER. No product keyword matched | 0 | Jun 18, 2026 |
| B | LIFETIME GENERAL CONTRACT NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION ON THE FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | VORDONIA CONTRACTING & SU NYC DOB building permits | 9 | General Construction · Renovation of existing 3 family house. new partition, new floors, insulate perimeter No product keyword matched | 0 | Jun 18, 2026 |
| B | RULERS ASSEMBLY MINISTRIES INC NYC DOB building permits | 9 | General Construction · PROPOSED INTERIOR RENOVATION AND CONVERSION OF A TWO-STORY AND ATTIC TWO-FAMILY BUILDING TO A ONE-FAMILY AND HOUSE OF WORSHIP. No product keyword matched | 0 | Jun 18, 2026 |
| B | Isen & Djevat Muratovic NYC DOB building permits | 9 | General Construction · PROPOSED SCOPE OF WORK IS TO REMOVE NON-LOAD BEARING PARTITION, INSTALL NEW FIRE RATED INTERIOR PARTITION, INSTALL NEW CLOSET, INTERIOR FINISHES & INSTALL NEW CERAMIC TILES. No product keyword matched | 0 | Jun 18, 2026 |
| B | ZV Drafting NYC DOB building permits | 9 | Construction Fence · PROPOSED 8' HIGH PLYWOOD CONSTRUCTION FENCE No product keyword matched | 0 | Jun 18, 2026 |
| B | KAM HING REALTY NYC,LLC NYC DOB building permits | 9 | General Construction · REMOVAL AND INSTALLATION OF PARTITION AND FIRE RATED GLASS PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 18, 2026 |
| B | MODERN DESIGN GEN CONTR NYC DOB building permits | 9 | General Construction · JOB FILED INTERIOR RENOVATION OF 1ST FLOOR COMMERCIAL STORE INCLUDING NEW CEILING,NEW HVAC,NEW PAINTING AND NEW FLOORING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THISAPPLICATION. No product keyword matched | 0 | Jun 18, 2026 |
| B | TYLER CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · INTERIOR ALTERATION OF EXISTING RADIOLOGY CLINIC. REMOVAL AND INSTALLATION OF PARTITIONS AT CELLAR AND 1ST FLOOR AS PER PLANS. DIRECT REPLACEMENT OF LIGHTING FIXTURES AND NEW FLOORING AS PER PLANS. NO CHANG EIN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | ALL CITY ELECTL CONTS INC NYC DOB electrical permits | 9 | Minor work to correct HPD violations # 18851552, 18505536 and 18505526 No product keyword matched | 0 | Jun 18, 2026 |
| B | VIVIANO ELECTRIC NYC DOB electrical permits | 9 | adding electric hot water heaters and ac condensers for each apartment (6) sub panel replacement in 2l,2r and 1 complete rewiring of 2l this permit is to supersede permit# B01185070-i1-el No product keyword matched | 0 | Jun 18, 2026 |
| B | SEAL TITE BUILDERS INC NYC DOB building permits | 9 | Mechanical Systems · APPLICATION FILED FOR MS WORK RELATED TO X01228581-I1 TO PROPOSE EXHAUST VENT AT RESTROOM AT BASEMENT ONLY. NO CHANGE IN EGRESS OR BULK. No product keyword matched | 0 | Jun 17, 2026 |
| B | MCB-OV C21 Property Owner LLC NYC DOB building permits | 9 | Structural · Prepare and file alteration drawings to consolidate 13 tax and zoning lots into one. Work includes reconstruction and structural integration for a single building, ensuring 2022 NYC BC compliance and supporting legal and physical unification. No product keyword matched | 0 | Jun 17, 2026 |
| B | STATE FIRE PREVENTION NYC DOB building permits | 9 | Mechanical Systems · NEW EXHAUST HOOD & DUCT FOR EXISTING RESTAURANT (#114 ONLY) AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY & EGRESS. No product keyword matched | 0 | Jun 17, 2026 |
| B | CORE D&B GROUP INC NYC DOB building permits | 9 | General Construction · Interior renovation of existing medical office as per plan. File to rectify ECB violation #35466572H, 35466573J & 35466574L: DOB violation #V 083022C22-03270: and SWO complain#2312346 & 2351698. No change in use, occupancy or egress. No product keyword matched | 0 | Jun 17, 2026 |
| B | RCM GROUP INC NYC DOB building permits | 9 | Full Demolition · Full demolition to a one story building No product keyword matched | 0 | Jun 17, 2026 |
| B | G-NET CONSTRUCTION CORP NYC DOB building permits | 9 | Structural · STRUCTURAL WORK FILED IN CONJUNCTION WITH GC WORK TYPE TO RESOLVE ECB VIOLATIONS ALL AS PER PLANS FILED HERE WITH. No product keyword matched | 0 | Jun 17, 2026 |