Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 1401 44TH STREET LLC NYC DOB building permits | 9 | Mechanical Systems · APPLICATION FILED TO OBTAIN CERTIFICATE OF COMPLIANCE FOR HVAC UNITS INSTALLED UNDER JOB #320391278 No product keyword matched | 0 | Jun 22, 2026 |
| B | 32-88 REALTY CORP NYC DOB building permits |
| 9 |
General Construction · Removal of existing to correct to cure a WWOP violation # 39060559Z. no change of use, egress or occupancy No product keyword matched |
| 0 |
| Jun 22, 2026 |
| B | G.M DIAMOND'S CONSTRUCTIN NYC DOB building permits | 9 | Mechanical Systems · LEGALIZE A.C. UNITS - WALL MOUNTED A.C. ND FLOOR MOUNTED LOCATED AT OUTDOOR AREA. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 22, 2026 |
| B | Holy Schnitzel Staten Island Corp NYC DOB building permits | 9 | Mechanical Systems · RESTAURANT WITH MECHANICAL WORK ON 1ST FLOOR AND ROOF.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 0 | Jun 22, 2026 |
| B | 109-17 46 AVE LLC NYC DOB building permits | 9 | Plumbing · APPLICATION HEREWITH FILED FOR PLUMBING WORK COVERED UNDER PREVIOUS APPLICATION 421388313, TO NOW BE COVERED UNDER THIS APPLICATION. NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Jun 22, 2026 |
| B | 43 EAST 10TH STREET CORP. NYC DOB building permits | 9 | Plumbing · Legalization of plumbing work filed under BIS# 102680074 that was approved but never permitted. All work shown on the plans was completed. NO CHANGE TO USE, EGRESS OR OCUPPANCY. No product keyword matched | 0 | Jun 22, 2026 |
| B | ES DECOR AND DESIGN LLC NYC DOB building permits | 9 | General Construction · INTERIOR ALTERATION OF EXISTING DWELLING UNIT 20M. NO CHANGE OF USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 22, 2026 |
| B | WILMAN CUSTOM DESIGN.LLC NYC DOB building permits | 9 | General Construction · PARTIAL RENOVATION OF EXISTING APT 4N ON THE 4TH FLOOR. RENOVATE KITCHEN AND BATHROOMS. DEMO & CONSTRUCTION OF INTERIOR NON-STRUCTURAL PARTITIONS, DOORS, FINISHES & CABINETS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 22, 2026 |
| B | HEALTHIER 729 REALTY LLC NYC DOB building permits | 9 | General Construction · CONVERT 1ST FLOOR OF EXISTING 1 STORY BUILDING TO HEALTH CARE FACILITIES WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY. NO CHANGE TO EXISTING BULK, FAR OR BUILDING ENVELOPE. No product keyword matched | 0 | Jun 22, 2026 |
| B | 535 WEST 163 STREET HDFC NYC DOB building permits | 9 | General Construction · INSTALL NEW CHIMNEY LINER No product keyword matched | 0 | Jun 22, 2026 |
| B | JVS IRON WORK INC NYC DOB building permits | 9 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS No product keyword matched | 0 | Jun 22, 2026 |
| B | ENCLAVE ON 241 STREET LLC NYC DOB building permits | 9 | Standpipe · Sprinkler/Standpipe work filed as shown on plans filed herewith. In conjunction with New Building application 210180294. No product keyword matched | 0 | Jun 22, 2026 |
| B | SUNNYSIDE/WOODSIDE JAME MASJID INC NYC DOB building permits | 9 | General Construction · APPLICATION FILING TO REPAIR/REBUILD REAR GARAGE WALL TO ADDRESS ECB VIOLATION#39160638P INCLUDING DOB VIOLATION #25-02146 AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 22, 2026 |
| B | 4200 AVE K EQUITIES LLC NYC DOB building permits | 9 | General Construction · Facade repair No product keyword matched | 0 | Jun 22, 2026 |
| B | VICKERS REALTY LTD NYC DOB building permits | 9 | Mechanical Systems · Replacement of existing rooftop hvac unit. No change to use, egress or occupancy. No product keyword matched | 0 | Jun 22, 2026 |
| B | JRM Construction Management NYC DOB building permits | 9 | General Construction · Propose to install awning. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 22, 2026 |
| B | quality metal inc NYC DOB building permits | 9 | General Construction · FILE CONSTRUCTION WORK AT EXISTING DELI STORE TO INSTALL NEW PARTITIONS, INTERIOR FINISHES AS PER PLAN. ALSO, MECHANICAL WORK AT COMMERCIAL KITCHEN TO INSTALL KITCHEN EXHAUST HOOD SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 22, 2026 |
| B | 284 PROSPECT PARK WEST LLC NYC DOB building permits | 9 | Construction Fence · Installation of 8 ft construction fence. No product keyword matched | 0 | Jun 22, 2026 |
| B | HL&S LLC NYC DOB building permits | 9 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 22, 2026 |
| B | CSI SEC & ELECTRIC INC NYC DOB electrical permits | 9 | Installation of Trash Auger- Power & lighting No product keyword matched | 0 | Jun 22, 2026 |
| B | TRITECH ELECTRICAL & DATA INC NYC DOB electrical permits | 9 | Service switch & metering equipment installed in bldg #10 by different contractor No product keyword matched | 0 | Jun 22, 2026 |
| B | PIONEER RSTORATION PAINT* NYC DOB building permits | 9 | General Construction · STUCCO REPAIR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING COD No product keyword matched | 0 | Jun 19, 2026 |
| B | INNER CITY ELEC'L CONTR'S NYC DOB electrical permits | 9 | General wiring and lighting for Silver Star Motors No product keyword matched | 0 | Jun 19, 2026 |
| B | EURO TECH P&H CONTRACTING NYC DOB building permits | 9 | General Construction · WE PROPOSED TO CONVERT AN EXISTING TWO STORY BUILDING WITH CELLAR AND ONE FAMILY INTO THREE FAMILY BUILDING WITHOUT ENLARGEMENT OF BUILDING No product keyword matched | 0 | Jun 18, 2026 |
| B | ERNEST MASSA FAMILY LLC NYC DOB building permits | 9 | General Construction · INSTALL NEW KITCHEN MAKE-UP AIR SYSTEM. REGISTER KITCHEN HOOD AND EXHAUST FAN AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | HSU FAMILY HOLDING GROUP LLC NYC DOB building permits | 9 | Curb Cut · CC WORK TYPE FILED IN CONJUNCTION WITH NB# Q00522619-I1 FOR AN ACCESSORY OPEN PARKING. No product keyword matched | 0 | Jun 18, 2026 |
| B | PROVIDENT MANAGEMENT CORP. NYC DOB building permits | 9 | Plumbing · PL WORK ON THE CEL LEVEL NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | IGLESIA DE DIOS DE LA PROFECIA NYC DOB building permits | 9 | General Construction · PROPOSED ENLARGEMENT AND CONVERSION OF A THREE STORY AND ATTIC TWO FAMILY BUILDING TO A ONE FAMILY AND HOUSE OF WORSHIP. No product keyword matched | 0 | Jun 18, 2026 |
| B | BNY CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · Install new pavers and railings on 4th floor roof at rear for new terrace. Repair of existing rear masonry wall. No change in use, egress or occupancy. No product keyword matched | 0 | Jun 18, 2026 |
| B | LIVONIA C3 HDFC NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | CGR SYSTEMS MANAGEMENT NYC DOB building permits | 9 | General Construction · APPLICATION FILE TO AMEND EXISTING CERTIFICATE OF OCCUPANCY #112741 FOR THE CELLAR & 1ST FLOOR INCLUDING A NEW MEZZANINE IN CONJUNCTION WITH THE 1ST FLOOR COMMERCIAL SPACE. No product keyword matched | 0 | Jun 18, 2026 |
| B | H & D MAINTENANCE CO INC NYC DOB building permits | 9 | Mechanical Systems · RENOVATION TO EXISTING DWELLIG UNIT. PARTITION, FINISH AND FIXTURE WORK ON THE 4TH FLOOR AT UNIT# 4C AS PER PLANS FILED HEREWITH. REPLACE/RELOCATE EXISTING PTAC AND ADD FOUR NEW THRU WALL AC UNITS . PLUMBING FILED SEPARATE. NO CHANGE TO USE EGRESS OR OCC. No product keyword matched | 0 | Jun 18, 2026 |
| B | 212 Pie LLC NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL WORK FOR EXISTING COMMERCIAL SPACE, RETAIL C . INSTALL NEW EXHAUST HOOD, FANS, MAKE UP AIR FANS AND HVACSYTEM WITH ASSOCIATED DUCT WORK. No product keyword matched | 0 | Jun 18, 2026 |
| B | 1760 EAST 12 LLC NYC DOB building permits | 9 | Full Demolition · Full demolition of existing building. No product keyword matched | 0 | Jun 18, 2026 |
| B | CARMORE RESTAURANT NYC DOB building permits | 9 | Sprinklers · INSTALLATION OF SPRINKLER HEADS AT THE CELLAR FILED IN CONJUNCTION WITH APPLICATION #101526680. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | TITANIUM CONSTRUCTION SERVICES NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014. CONSTRUCTION FENCE TO BE PARTIALLY INSTALLED ON STREET. No product keyword matched | 0 | Jun 18, 2026 |
| B | 1079-83 60TH STREET LLC NYC DOB building permits | 9 | Mechanical Systems · Mechanical work in conjunction with Alt-CO No product keyword matched | 0 | Jun 18, 2026 |
| B | INNOVATIVE MECHANICAL COR NYC DOB building permits | 9 | General Construction · MINOR GC WORK FILED IN CONJUNCTION WITH REPLACING HVAC IN APT 5A. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | ARCHETYPAL IMAGERY CORP NYC DOB building permits | 9 | General Construction · HEREBY FILING FOR THE RENOVATION OF UNIT 6D. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | 920 AVENUE J RESIDENCE LLC NYC DOB building permits | 9 | Structural · HEREWITH FILING FOR STRUCTURAL WORK IN CONJUNCTION WITH APPLICATION # B00946568 No product keyword matched | 0 | Jun 18, 2026 |
| B | LOWNEY CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · Interior Renovation of an Existing Residential Apartment. Work includes Architectural, Mechanical and Plumbing Scope includes installation of a new interconnecting stair between ground and first floors. No change to use, egress, or occupancy No product keyword matched | 0 | Jun 18, 2026 |
| B | SANTA I CONTRACTING CORP NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION IN 8F FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OOCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |
| B | BR CONSTRUCTION GROUP INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT. REPLACE / RELOCATE PARTITIONS, FIXTURES, FINISHES, AND LIGHTING; EXPAND EXISTING SPLIT-SYSTEM ACs TO COVER ENTIRE APT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 18, 2026 |
| B | STANISLAWA NATKANIEC TRUST NYC DOB building permits | 9 | General Construction · Work filed to show the interior renovation and change to layouts in apartment 1L and construction of new porch for 1L and 1R. No change in use, egress and occupancy. No product keyword matched | 0 | Jun 18, 2026 |
| B | FLO RESTORATION INC NYC DOB building permits | 9 | General Construction · Interior renovations to the existing Class A apartment 1109. Scope includes removal of bathroom, non-structural demolition of walls, patch and repair work in the area of work, and installation of a closet within the master bedroom. No product keyword matched | 0 | Jun 18, 2026 |
| B | RIGHT PRICE GENERAL CONSTRUCTION NYC DOB building permits | 9 | Mechanical Systems · PROPOSED ADDITION TO EXISTING 1 FAMILY DWELLING AT FIRST AND SECOND FLOOR. REFILING OF APPLICATION 421677778 No product keyword matched | 0 | Jun 18, 2026 |
| B | IBPS NYC DOB building permits | 9 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jun 18, 2026 |
| B | 128 E 64TH ST LLC NYC DOB building permits | 9 | General Construction · Interior renovation to an existing one family dwelling. As per plans filed herewith. No change to use occupancy or egress. No product keyword matched | 0 | Jun 18, 2026 |
| B | ASSET EQUITY SOLUTIONS NYC DOB building permits | 9 | Mechanical Systems · Addition & Alteration of existing one family house. Cellar/1st floor, 2nd floor addition as per drawing herewith filed. No change in egress, use or occupancy, No product keyword matched | 0 | Jun 18, 2026 |
| B | GOWANUS CUSTOM INS LLC NYC DOB building permits | 9 | General Construction · THIS APPLICATION IS FOR INTERIOR RENOVATION ON ALL FLOORS. THERE SHALL BE NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Jun 18, 2026 |