Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,518
Tier S19
New this week155
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BBrooklyn Comprehensive Care Center
NYC DOB building permits
9
General Construction · TENANT FIT-OUT OF AN EXISTING COMMUNITY FACILITY SPACE (FIRST FLOOR AND CELLAR) IN EXISTING 6-STORY RESIDENTIAL BUILDING) FOR DIAGNOSTIC AND TREATMENT FACILITY AS PER PLANS
No product keyword matched
0Jun 22, 2026
BBUILD IT BROTHERS INC
Seer chat
NYC DOB building permits
9
General Construction · PROPOSED OF GARAGE DOOR TO BE INSTALLED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched
0
Jun 22, 2026
BMARIANNA DELFINO LLC
NYC DOB building permits
9
Plumbing · INSTALL NEW TANKLESS BOILER AND HWH STORAGE TANK AND FLOOR DRAIN ON THE 1ST FLOOR, INSTALL NEW GAS LINE IN THE CELLAR FROM THE EXISTING GAS METER TO NEW BOILER ROOM ON THE 1ST FLOOR
No product keyword matched
0Jun 22, 2026
BGECKO BUILDS LLC
NYC DOB building permits
9
General Construction · Gut Renovate Basement, First, Second and Third floor except the occupied tenant apartment. Restore stoop. Replace windows. Open up rear wall for new doors on the first floor.
No product keyword matched
0Jun 22, 2026
BPlaza off the Park, HDFC
NYC DOB building permits
9
Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST TO PERFORM FACADE INSPECTIONS/REPAIR.
No product keyword matched
0Jun 22, 2026
BJ'S CUSTOM CONTRACTING IN
NYC DOB building permits
9
General Construction · JOB FILED TO CAP AND REMOVE ILLEGAL PLUMBING FIXTURES IN CELLAR FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Jun 22, 2026
BXXII CAPITAL LLC
NYC DOB building permits
9
Construction Fence · INSTALLATION OF TEMPORARY 8'(H) PLYWOOD CONSTRUCTION FENCE. THE FENCE IS BEYOND THE PROPERTY LINE AND EXTENDS 5' OF THE PROPERTY LINE.
No product keyword matched
0Jun 22, 2026
BKIM PROPERTIES CORP
NYC DOB building permits
9
General Construction · A vertical extension to a 2 story commercial building from the existing 1 story commercial building. Work to include new buildout of the interior spaces. New work includes restrooms, kitchens, and bars.
No product keyword matched
0Jun 22, 2026
B1429 77th Street LLC
NYC DOB building permits
9
Structural · RENOVATION OF EXISTING 2-FAMILY RESIDENCE INCLUDING INTERIOR NON-BEARING PARTITION CHANGES, FENESTRATION CHANGES, NEW INTERIOR STAIRS IN MODIFIED STAIR OPENINGS AS PER PLANS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
No product keyword matched
0Jun 22, 2026
B834 FIFTH AVENUE CORP
NYC DOB building permits
9
Suspended Scaffold · INSTALLATION OF OUTRIGGER BEAM TO PERFORM FACADE REPAIRS AND FACADE INSPECTIONS
No product keyword matched
0Jun 22, 2026
BR & E RENOVATIONS CORP
NYC DOB building permits
9
General Construction · Interior renovation of 3rd floor and replace stair
No product keyword matched
0Jun 22, 2026
BSILVERCUP STUDIOS
NYC DOB building permits
9
General Construction · Temporarily attach set dressing to the roof and its structure for less than 30 days, ensuring compliance with the administrative code, building code, and NFPA 701.
No product keyword matched
0Jun 22, 2026
BBROWN HARRIS STEVENS RES. MGMT.
NYC DOB building permits
9
General Construction · Sidewalk vault repair project. No change in use, egress or occupancy.
No product keyword matched
0Jun 22, 2026
BConey Realty & Management
NYC DOB building permits
9
Boiler Equipment · REPLACE BOILER AND BURNER.
No product keyword matched
0Jun 22, 2026
BC.R.U. MECHAN & HEAT INC
NYC DOB building permits
9
Plumbing · PLUMBING WORK FOR GUT RENOVATION OF A 1 STORY SINGLE FAMILY HOUSE.NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION.
No product keyword matched
0Jun 22, 2026
BINAKA
NYC DOB building permits
9
Mechanical Systems · FILING TO OBTAIN CERTIFICATE OF COMPLIANCE FOR MECHANICAL WORK COMPLETED AND SIGNED OFF UNDER JOB NUMBER B00871131-I1. GROUND FLOOR EXISTING RESTAURANT WITH RELOCATED KITCHEN AND HVAC SYSTEM. NO WORK UNDER THIS JOB NUMBER. EQUIPMENT TO MATCH THE PW4
No product keyword matched
0Jun 22, 2026
BXXII HOLDINGS
NYC DOB building permits
9
General Construction · in conjunction with Renovations of existing structure including re framing work of all floors and roof. Work also included new foundation floor in the basement for the elevator.
No product keyword matched
0Jun 22, 2026
BChinatown Health Clinic Foundation
NYC DOB building permits
9
Sign · ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING CHARLES B. WANG COMMUNITY HEALTH CENTER WITH ASIAN CHARACTERS
No product keyword matched
0Jun 22, 2026
B2465 Broadway Associates, LLC
NYC DOB building permits
9
General Construction · FACADE REPAIR WORK AS SHOW ON PLANS SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Jun 22, 2026
BTrinity
NYC DOB building permits
9
General Construction · Filing herewith interior renovation of existing 15th floor space as per plans filed herewith. No change in use, egress, or occupancy.
No product keyword matched
0Jun 22, 2026
BKINGS COUNTY WATERPROOFIN
NYC DOB building permits
9
Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans
No product keyword matched
0Jun 22, 2026
BATLANTIS DECORATING INC
NYC DOB building permits
9
General Construction · FILE INTERIOR RENOVATION AT APT #19C ON 19TH FLOOR TO RENOVATE EXISTING BATHROOM/KITCHEN, INSTALL NEW FLOOR TILES, REPAIR AND PAINT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Jun 22, 2026
BLEFRAK PROPERTY MANAGEMENT
NYC DOB building permits
9
Sprinklers · Sprinkler modification of the existing system including sprinkler head and associated piping replacement. No change to occupancy, use or egress as per plans filed herewith.
No product keyword matched
0Jun 22, 2026
BBEACON CONSTRUCTION SERV
NYC DOB building permits
9
General Construction · CHANGE TENANT OCCUPANCY FROM EXISTING COMMERCIAL SPACE - PLACE OF ASSEMBLY FOR EATING AND DRINKING ESTABLISHMENT CO #500213057, DATED APR 08-1998 TO US VIIBUSINESS. WORK IS LIMITED TO INTERIORFIT OUT, INCLUDE GENERALCONSTRUCTION AND RELATED MECHANICAL.
No product keyword matched
0Jun 22, 2026
BCONSTRUCTOMICS, LLC
NYC DOB building permits
9
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched
0Jun 22, 2026
BMALBA CAPITAL INC
NYC DOB building permits
9
Curb Cut · INSTALL 18' SHARE DROP CURB WITH 1'-6 SPLAYS ON BOTH SIDE.
No product keyword matched
0Jun 22, 2026
BVERGARA HOMES LLC
NYC DOB building permits
9
Construction Fence · installation of temporary construction fence
No product keyword matched
0Jun 22, 2026
BEHH SERVICES INC
NYC DOB building permits
9
General Construction · This Application is filed for the window replacement of apartment 7C. No change in use, egress, or occupancy is proposed under this application.
No product keyword matched
0Jun 22, 2026
BCARNEGIE PARK CONDOMINIUM
NYC DOB building permits
9
General Construction · Minor facade repairs as per plans; no change to use, egress, or occupancy.
No product keyword matched
0Jun 22, 2026
BBOULEVARD PLANNING INC
NYC DOB building permits
9
Full Demolition · FILING TO LEGALIZE DEMOLITION OF GARAGE. NOTHING IS REMIAN OF THE GARAGE.
No product keyword matched
0Jun 22, 2026
BBD HOLDINGS CO
NYC DOB building permits
9
General Construction · MODIFICATIONS TO EXISTING COMMERCIAL STOREFRONT. NO CHANGE TO USE, OCCUPANCY OR EGRESS
No product keyword matched
0Jun 22, 2026
BPIECE MANAGEMENT INC
NYC DOB building permits
9
Mechanical Systems · Proposing removal and new Air Cooled HVAC system with ductwork and and all associated apparatus at Starbucks Retail Space
No product keyword matched
0Jun 22, 2026
BA&M BUILDING REMODELING
NYC DOB building permits
9
General Construction · PROPOSED RENOVATION INTERIOR PARTITION CHANGES AND NEW FINISHISES OF AN EXISTING RESIDENTIAL UNIT 7P ON THE 7th FLOOR OF AN EXISTING RESIDENTIAL, 29-STORY BUILDING. NO CHANGE IN USE, EGRESS, BULK, USE, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Jun 22, 2026
BSTAR DIAMOND CONST. INC
NYC DOB building permits
9
Suspended Scaffold · Suspended scaffold out rigger system for facade repair works .
No product keyword matched
0Jun 22, 2026
BGenesis Group US Inc.
NYC DOB building permits
9
Plumbing · Remove, replace or install plumbing fixtures in conjunction with GC application #B01380914-I1.
No product keyword matched
0Jun 22, 2026
BACQUAVELLA GALLERIES, INC.
NYC DOB building permits
9
Mechanical Systems · MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
No product keyword matched
0Jun 22, 2026
BCLF2 LLC
NYC DOB building permits
9
Plumbing · Installation of new plumbing fixtures associated with the interior renovation under main application M01348154.
No product keyword matched
0Jun 22, 2026
BGALVIN BROTHERS INC
NYC DOB building permits
9
General Construction · INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Jun 22, 2026
BCONGREGATION ATERES TZVI
NYC DOB building permits
9
Foundation · Filing Underpinning Work type in conjunction with SOE application B01358352-S1 for NB #B01358352-I1
No product keyword matched
0Jun 22, 2026
BCL21 Jupiter LLC
NYC DOB building permits
9
Plumbing · Plumbing work filed in conjunction with the renovation of an existing dwelling unit. Architectural work filed separately. No change of use, occupancy or egress.
No product keyword matched
0Jun 22, 2026
BMorningside Heights CPW, LLC
NYC DOB building permits
9
Plumbing · Plumbing work filed in conjunction with the renovation of an existing dwelling unit. Architectural work filed separately. No change of use, occupancy or egress.
No product keyword matched
0Jun 22, 2026
BFREEFORM DEFORM LLC
NYC DOB building permits
9
Mechanical Systems · Installation of Paint Spray Booth & Mixing Room, Duct work from units up to roof for Exhaust, Installation of Dry Chemical Fire Suppression. No change to CO, Egress, or Occupancy.
No product keyword matched
0Jun 22, 2026
BFREDA ARCHITECTURAL DESING
NYC DOB building permits
9
General Construction · REPAIR MASONRY FACADE, INSTALL NEW STEEL LINTELS AND PRECAST STONES. ALL AS PER DRAWINGS FILE HEREWITH. NO CHANGE IN USE OR MEANS OF EGRESS. and resolve violations.
No product keyword matched
0Jun 22, 2026
BBP Livonia Limited Partnership
NYC DOB building permits
9
Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched
0Jun 22, 2026
BJG HOME IMPROV NYC CORP
NYC DOB building permits
9
General Construction · Modification of general construction work in apartment 9CD as shown on submitted pans. No change in occupancy, use or egress.
No product keyword matched
0Jun 22, 2026
BGolden corner restaurant
NYC DOB building permits
9
Plumbing · PLUMBING WORK FOR EXISTING EATING & DRINKING ESTABLISHMENT AT 1ST. FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
No product keyword matched
0Jun 22, 2026
BYAW LLC
NYC DOB building permits
9
General Construction · EXTERIOR FACADE RENOVATION FOR 2 STORY COMMERCIAL BUILDING, REPLACE WITH WPC FLUTED WALL. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
No product keyword matched
0Jun 22, 2026
BBADEM BUILDINGS LLC
NYC DOB building permits
9
Mechanical Systems · NEW MINI SPLIT A/C SYSTEM; CONDENSER UNIT AND EVAPORATORS
No product keyword matched
0Jun 22, 2026
BWestchester Metal Works Inc.
NYC DOB building permits
9
Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY
No product keyword matched
0Jun 22, 2026
BSERGIO ZAVALA
NYC DOB building permits
9
General Construction · Interior renovation of 2-bedroom apartment including minor non-structural partition demolition, new partitions, new flooring. No change to use, egress or occupancy.
No product keyword matched
0Jun 22, 2026
Showing 12,351–12,400 of 16,520
PreviousNext