Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | TRIPLE L REALTY NYC DOB building permits | 9 | General Construction · Minor partition work to upgrade existing partitions to comply building code fire rating requirements as per plans to revert use of the building to match previous C of O under application# 401034894. Upgrade extg bathroom to ADA compliance. Layout Remains No product keyword matched | 0 | Jun 23, 2026 |
| B |
| GREENHILL MGMT., LLC NYC DOB building permits |
| 9 |
Mechanical Systems · INSTALL CHIMNEY LINER AND CONDENSATE TANK AS PER PLANS.NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched |
| 0 |
| Jun 23, 2026 |
| B | COBURN CONSTRUCTION MANAGEMENT CORP NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | Kolel Beth Yechel of Tartikov NYC DOB building permits | 9 | Full Demolition · FULL DEMOLITION OF METAL TANK, USING HAND HELD AND MECHANICAL MEANS TO DEMOLISH STRUCTURE No product keyword matched | 0 | Jun 23, 2026 |
| B | NASS PROPERTIES INC. NYC DOB building permits | 9 | General Construction · REPAIR DAMAGED ROOF AND REPLACED DAMAGED HVAC UNITS WITH A ELECTRICAL SPLIT SYSTEM No product keyword matched | 0 | Jun 23, 2026 |
| B | PARK GREEN CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · APPLICATION FILE TO EXTERIOR FACADE REPAIR AS VERTICAL & HORIZONTAL CRACK WITH LOOSE AND DETERIORATED STUCCO AS PER PLAN. REMOVE VIOLATION#39185940R. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | P&J Maintenance, LLC NYC DOB building permits | 9 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED AS PER HPD EMERGENCY DECLARATION. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | UP CONSTRUCTION AND RESTORATION,INC NYC DOB building permits | 9 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | DA MARTINO CORP NYC DOB building permits | 9 | General Construction · FILING TO SHOW INTERIOR RENOVATION AS PER PLANS No product keyword matched | 0 | Jun 23, 2026 |
| B | Island Organic Convenience Corp NYC DOB building permits | 9 | Mechanical Systems · FILING FOR INTERIOR RENOVATION OF THE EXISTING FOOD STORE USE GROUP 6, REPLACE COMMERCIAL HOOD FOR THE DELI, NON-BEARING PARTITIONS, CARPENTRY, MILL WORK AND FINISHES No product keyword matched | 0 | Jun 23, 2026 |
| B | 111-50 SPRINGFIELD BLVD LLC NYC DOB building permits | 9 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING 2ND STORY ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | ACE MANAGEMENT NY LLC NYC DOB building permits | 9 | Foundation · subsequent filing for foundation and earthwork in conjunction with Alteration (GC) application. No product keyword matched | 0 | Jun 23, 2026 |
| B | TJ EVERLASTING CONT CORP NYC DOB building permits | 9 | General Construction · Interior renovation to existing Duplex Apt. #11B. Work to include non-structural demolition, general construction, and finishes. No change in egress or occupancy. No product keyword matched | 0 | Jun 23, 2026 |
| B | JOSHUA CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · RENOVATION OF HOUSE TO OBTAIN TWO DWELLING UNIT HOUSE FROM ONE UNIT No product keyword matched | 0 | Jun 23, 2026 |
| B | NEW HAVEN MINISTRIES NYC DOB building permits | 9 | Plumbing · herewith filed for plumbing work. installation of bathroom 1- lav, 1 toilet,-1-shower at second floor No product keyword matched | 0 | Jun 23, 2026 |
| B | LSL SERVICES INC NYC DOB building permits | 9 | Plumbing · RELOCATE GAS METER AND TEST/EXTEND EXISTING GAS RISER FOR COMMERICAL SPACE ON 1ST FLOOR. No product keyword matched | 0 | Jun 23, 2026 |
| B | WEST VILLAGE MINETTA PARTNERS LLC NYC DOB building permits | 9 | General Construction · Combination of apartments 2FW & 2RW. Removal and replacement of interior partitions and finish work. No change of use, egress, or occupancy under this application. No product keyword matched | 0 | Jun 23, 2026 |
| B | DIVYA CONSTRUCTION OF NY NYC DOB building permits | 9 | General Construction · Re-pointing as per plan No product keyword matched | 0 | Jun 23, 2026 |
| B | BENNY & SON CONST CORP NYC DOB building permits | 9 | Foundation · UNDERPINNING OF EXISTING RETAINING WALL AND CONSTRUCTION OF NEW CONCRETE RETAINING WALL IN FRONT OF EXISTING RETAINING WALL IN THE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | GSKP, LLC NYC DOB building permits | 9 | General Construction · POINTING, CRACK REPAIR AND WINDOW LINTEL RESTORATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | Lotte New York Palace Hotel NYC DOB building permits | 9 | General Construction · PROPOSED ROOF REPLACEMENT AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | PNE REALTY, LLC NYC DOB building permits | 9 | Plumbing · Minor Plumbing Work. No change to use, egress or occupancy No product keyword matched | 0 | Jun 23, 2026 |
| B | DECEMOONLY LLC NYC DOB building permits | 9 | General Construction · Filed address ECB violation#35410909L, 35410910Z, propose exterior work at rear yard of existing 2 family residential building as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 23, 2026 |
| B | UNIVERSAL SIGNS & SVC INC NYC DOB building permits | 9 | Sign · ERECT ACCESSORY BUSINESS WALL SIGN FOR HAAGEN-DAAZS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | Y&Y&SONS CO. INC. NYC DOB building permits | 9 | Mechanical Systems · This MS filing is to supersede the old BIS job# 402250407 and remove the abandoned HVAC rooftop unit including its ductwork and the related support. Remove ECB violation 34630799H. No change in use, egress or occupancy.. No product keyword matched | 0 | Jun 23, 2026 |
| B | VORTEX PLUMBING COMPANY NYC DOB building permits | 9 | Plumbing · RELOCATE: 1 DISHWASHER, 1 REFRIGERATOR, 1 SINK, AND 1 RANGER. MOVE: NONE. NO SPRINKLER WORK APPLICABLE TO THIS APPLICATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | PRECISE GENERAL CONSTRUCT NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION AT ONE APARTMENT IN AN EXISTING CONDOMINIUM- MIXED RESIDENTIAL & COMMERCIAL BUILDING No product keyword matched | 0 | Jun 23, 2026 |
| B | 31 CAPITAL LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION WITH PARTITION WORKS FOR CELLAR, MEZZANINE AND 1ST FLOOR, REMOVE PARTIAL EXISTING MEZZANINE. REPLACE EX. STOREFRONT FOR 1ST FLOOR, MEZZANINE AND 2ND FLOOR WITH NEW GLASS PANELS AND GLASS DOORS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | Jose A. Melo NYC DOB building permits | 9 | General Construction · Renovation of rear yard deck, installation of above grade swimming pool. No product keyword matched | 0 | Jun 23, 2026 |
| B | 51-15 SKILLMAN AVENUE REALTY CO INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION AT EXISTING UNITS 5, 6, AND 20 AS PER PLANS. WORK INCLUDES GENERAL ARCHITECTURAL RENOVATIONS AND FINISH UPGRADES. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BUILDING ENVELOPE UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 23, 2026 |
| B | KRISCORP ELETRICAL CONTRA NYC DOB building permits | 9 | Foundation · Horizontal enlargement to expand kitchen. Partition finish fixture work @ cell/1st flr.New concrete slab and insulation at cellar. Foundation/structural work to accommodate horizontal enlargement. New mechanical split system.No change to use egress or occ No product keyword matched | 0 | Jun 23, 2026 |
| B | HAMILTON WOODWORKS LLC NYC DOB building permits | 9 | General Construction · RENOVATION OF DUPLEX APARTMENT IN BASEMENT & 1ST FLOOR AS PER PLANS. REPLACEMENT OF KITCHEN CABINETS & APPLIANCES. NEW POCKET DOOR. REPLACEMENT KITCHEN WINDOW. NEW POWDER ROOM. MINOR WORK CELLAR LAUNDRY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | RYAN HEALTH NYC DOB building permits | 9 | General Construction · Remove and replace interior non-bearing partitions and finishes to the medical offices and pharmacy on partial 1st floor at the existing premises. No change to zoning, use, egress or occupancy No product keyword matched | 0 | Jun 23, 2026 |
| B | Swobbee NYC DOB building permits | 9 | General Construction · Filing plans herewith for the installation of (6) six new Swobbee EV charging stations. All work to be completed in outside premises. No change to use, egress, or occupancy. No product keyword matched | 0 | Jun 23, 2026 |
| B | GALAXY OF NEW YORK, INC. NYC DOB building permits | 9 | Sign · NON ILLUMINATED, NON ADVERTISING ACCESSORY BUSINESS SIGN ON WALL. SIGN WORDING : Physical Medical & Rehabilitation of NY,PC,: No product keyword matched | 0 | Jun 23, 2026 |
| B | SUNNYSIDE COMMUNITY SERVICES NYC DOB building permits | 9 | General Construction · MINOR INTERIOR WORK TO RENOVATE EX TOILETS AND KITCHEN BY REPLACING PLUMBING FIXTURES AND INSTALLING NEW WALL, FLOOR AND CEILING FINISHES. WORK WILL INCLUDE INSTALLATION OF WALL MOUNTED EXHAUST FAN. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Jun 23, 2026 |
| B | TM BUILDS INC NYC DOB building permits | 9 | Construction Fence · Installation of 8' construction fence No product keyword matched | 0 | Jun 23, 2026 |
| B | ROCK BLVD LLC. NYC DOB building permits | 9 | Plumbing · HEREWITH FILE PLANS FOR INSTALLATION (1) NEW GAS METER AND PIPING FOR NEW BOILERS IN THE CELLAR OF EXISTING RESIDENTIAL BUILDING. NEW BOILER INSTALLATION FILED UNDER LAA B01360975-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | Z BUILDERS NYC DOB building permits | 9 | General Construction · Proposed interior renovation on existing Cellar, first, 2nd & 3rd floors as per plans. No change in use, Occupancy, Egres, or lot coverage. No product keyword matched | 0 | Jun 23, 2026 |
| B | NEW CLAY STUDIOS LLC NYC DOB building permits | 9 | General Construction · INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jun 23, 2026 |
| B | 210 WEST 19TH ST CONDO NYC DOB building permits | 9 | General Construction · FACADE AND ROOF REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 23, 2026 |
| B | ADRIA II LLC NYC DOB building permits | 9 | Boiler Equipment · INSTALL GAS FIRED BOILERS. No product keyword matched | 0 | Jun 23, 2026 |
| B | PATRICK O'ROURKE REALTY, INC NYC DOB building permits | 9 | Mechanical Systems · REMOVE EXISTING ROOF TOP UNIT & INSTALL NEW SPLIT SYSTEM. NO CHANGE IN MEANS OF EGRESS SUSE GROUP, OR OCCUPANCY. No product keyword matched | 0 | Jun 23, 2026 |
| B | WHITEPOST ASSOCIATES, LLC NYC DOB building permits | 9 | Sign · ERECT 1 ILLUMINATED WALL SIGNS AND 6 NON-ILLUMINATED WALL SIGNS ON BOSTON ROAD ELEVATION AND 1 ILLUMINATED WALL SIGN AND 1 NON-ILLUMINATED WALL SIGNS ON WHITE PLAINS ROAD. SIGNS ARE ACCESSORY TO HARBOR FREIGHT. No product keyword matched | 0 | Jun 23, 2026 |
| B | MUSSO PROPERTIES LLC NYC DOB building permits | 9 | Antenna · Carrier: VZW. New Install. Install (3) antenna sectors on the roof (15 antennas, 6 RRH, 3 OVP & 2 GPS). Install (3) cabinets on a new equipment platform with a guardrail on the roof. In conformance with TPPN #5/98. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 23, 2026 |
| B | D. TRAYNOR ELEC'L CORP NYC DOB electrical permits | 9 | INSTALL WIRING FOR POWER AND LIGHTING FOR A NEW BATHROOM. No product keyword matched | 0 | Jun 23, 2026 |
| B | LEVIS ELECTR'L CONTR. COR NYC DOB electrical permits | 9 | Re-wire with new branch circuits and new risers for the 3rd and 4th floor apartments. No product keyword matched | 0 | Jun 23, 2026 |
| B | NATES MANAGEMENT LLC NYC DOB building permits | 9 | Structural · Erect structure for new Illuminated sign on ground. Sign filed under S01393826 and base file under Bis # 500841798. No change of use egress or occupany No product keyword matched | 0 | Jun 22, 2026 |
| B | DESIGN TECH CONSTRUCT COR NYC DOB building permits | 9 | Structural · Structural ork filed in conjunction with the enlargement of one family residence No product keyword matched | 0 | Jun 22, 2026 |
| B | WINTER PROPERTIES NYC DOB building permits | 9 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jun 22, 2026 |