Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AVATAR CONSTRUCTION INC NYC DOB building permits | 9 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE,OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 26, 2026 |
| B | RPM NYC DOB building permits | 9 |
| 0 |
| Jun 26, 2026 |
| B | SSL CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · FILING FOR INTERIOR RENOVATION OF EXISTING APT 5A AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | CROSS FIVE CONSTRUCTION NYC DOB building permits | 9 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Jun 26, 2026 |
| B | E T MGMT NYC DOB building permits | 9 | Plumbing · Disconnect existing oil boiler, install (2) electrical water heaters. No product keyword matched | 0 | Jun 26, 2026 |
| B | G.BASSOLINO PLUMBING LTD NYC DOB building permits | 9 | Boiler Equipment · INSTALLATION OF (1) NEW HOT WATER BOILER FOR NATURAL GAS OPERATION. NO CHANGE IN EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | 41 MAJOR REALTY NYC DOB building permits | 9 | Mechanical Systems · PROVIDE NEW MECHANICAL SYSTEM FOR SECOND FLOOR OFFICE SPACE No product keyword matched | 0 | Jun 26, 2026 |
| B | 111 JAVA STREET LLC NYC DOB building permits | 9 | Earth Work · Creating access to the cellar level and preparing space for pouring new concrete. No product keyword matched | 0 | Jun 26, 2026 |
| B | ORAN DEVELOPMENT AND MANAGEMENT LLC NYC DOB building permits | 9 | Plumbing · REPLACEMENT OF EXISTING : (1) ONE - (3) THREE FIXTURE BATH, INSTALLATION OF ONE NEW LAV ; REPLACEMENT OF EXISITNG: (1) ONE KITCHEN SINK, (1) ONE GAS RANGE, AND (1) ONE DISH WASHER FILED IN CONJUNCTION WITH ALT-GC # M01332570-I1. No product keyword matched | 0 | Jun 26, 2026 |
| B | CARLTON REGENCY CORP (THE) NYC DOB building permits | 9 | General Construction · Interior renovations of existing residential unit, including gut renovation of kitchenette, main bathroom, and powder room. No product keyword matched | 0 | Jun 26, 2026 |
| B | 651 4TH AVENUE LLC NYC DOB building permits | 9 | Plumbing · Plumbing work per plans filed herewith. No product keyword matched | 0 | Jun 26, 2026 |
| B | FLIGHT LEVEL 970 NYC DOB building permits | 9 | Structural · FILING FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT FIRST FLOOR AND CELLAR , AS PER PLANS. NO CHANGE IN USE EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | DYKER SOLUTIONS INC NYC DOB building permits | 9 | Mechanical Systems · Job filed for installation of split AC unit. No change of use, egress, or occupancy under this application. No product keyword matched | 0 | Jun 26, 2026 |
| B | MISRA GROUP, LLC NYC DOB building permits | 9 | Structural · INSTALLATION FOR STRUCTURAL SUPPORT FOR HVAC SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 26, 2026 |
| B | Rego Park Gardens NYC DOB building permits | 9 | Solar · Installation of 82.84 kw solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 0 | Jun 26, 2026 |
| B | E.G. ENTERPRISES NY INC NYC DOB building permits | 9 | Construction Fence · Application is filed for 8.0' high temporary construction fence in conjunction with NB filings for 156 McKinley Ave. (lot 1) and 152 McKinley Ave. (lot 3). No product keyword matched | 0 | Jun 26, 2026 |
| B | Dynamic Construction Company NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF CHAINLINK CONSTRUCTION FENCE AT FRONT AND SIDE AS PER PLAN. No product keyword matched | 0 | Jun 26, 2026 |
| B | 1042 UTOPIA NYC DOB building permits | 9 | Plumbing · PROPOSED PLUMBING FOR 2 STORY; ONE-FAMILY NEW BUILDING FILED IN CONJUNCTION WITH GC# Q00722567 No product keyword matched | 0 | Jun 26, 2026 |
| B | MUHAN SPACE CORP NYC DOB building permits | 9 | General Construction · INTERIOR FIT-OUT OF DELI (EATING AND DRINKING ESTABLISHMENT) ON THE FIRST FLOOR, CELLAR, & MEZZANINE AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, AND OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | A & C PLBG & HTG CO., INC NYC DOB building permits | 9 | Plumbing · HEREBY FILING FOR RENOVATION AND 3 PIECE BATHROOM IN CELLAR (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | HATCHET WORKS CORP NYC DOB building permits | 9 | Mechanical Systems · NTERIOR RENOVATION OF EXISTING UNIT 10B AT 10TH FLOOR. INSTALLING NEW AC UNIT AND ASSOCIATED DUCTWORK No product keyword matched | 0 | Jun 26, 2026 |
| B | CARNEGIE COUNCIL NYC DOB building permits | 9 | General Construction · Exterior repairs related work in association with Capital Improvement Program at 168-170 East 64th Street; work includes new planter and ADA ramp installation. No change to use, egress or occupancy proposed under this alteration No product keyword matched | 0 | Jun 26, 2026 |
| B | BUILDINGS 22 CORP NYC DOB building permits | 9 | Support of Excavation · EXCAVATE WITH SUPPORT-OF-EXCAVATION (SOE) FOR THE CONSTRUCTION OF THREE (3) NEW SPREAD FOOTINGS SOE TO CONSIST OF TIMBER SHORING TO ALLOW FOR CONSTRUCTION OF THE PROPOSED FOOTINGS No product keyword matched | 0 | Jun 26, 2026 |
| B | PFC INTERNATIONAL LLC NYC DOB building permits | 9 | Construction Fence · To Install temporary construction fence on property lines. No product keyword matched | 0 | Jun 26, 2026 |
| B | DROMOS CORPORATION NYC DOB building permits | 9 | General Construction · FILING FOR INTERIOR FIT OUT OF ACCESSORY LAUNDRY ROOM IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | R.C. Mesiti Enterprises, Inc. NYC DOB building permits | 9 | General Construction · 1 story horizontal extension to rear of the building with interior alterations. No product keyword matched | 0 | Jun 26, 2026 |
| B | OPTIMUM BUILDING RESTORATION CORP NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION AND USE OF TEMPORARY PIPE SCAFFOLDING EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 26, 2026 |
| B | RIVERWALK LANDING CONDOMINIUM NYC DOB building permits | 9 | General Construction · Miscellaneous replacement/repair of brick masonry, miscellaneous repair of concrete slab edges with repair mortar, and miscellaneous waterproofing. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 26, 2026 |
| B | ALB-BROS CONSTR CORP NYC DOB building permits | 9 | General Construction · Combination of Apt's 2M and 2N as per TPPN 3/97. Remove and install interior partitions, doors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | CAPITAL IMPROVEMENT SERVI NYC DOB building permits | 9 | Mechanical Systems · Installation of transfer fans, ducts and diffusers as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Jun 26, 2026 |
| B | SUBURBANA CORP NYC DOB building permits | 9 | General Construction · Interior renovation of Apt. 7-102. Remove and install interior partitions doors, floors and finishes. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | SRMC NYC DOB building permits | 9 | General Construction · PROPOSED EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. WORK TO ADDRESS ECB VIOLATION# 39173536R. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | 430 CLINTON AVENUE ASSOCIATES NYC DOB building permits | 9 | Structural · INTER. RENOV.: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXT. INSTALLAT'N OF NEW GWB, FLOOR, CLG & WALL FINISHES. INSTALLAT'N OF REPLACEMENT LIGHT FIXT. NO CHANGE TO USE,EGRESS OR OCCUPANCY. NO ENLARGEMENT, NOR EXTERIOR WORK. NEW DOOR OPENING No product keyword matched | 0 | Jun 26, 2026 |
| B | SUN DIRECT CONSTRUCTION NYC DOB building permits | 9 | Structural · PROPOSED STRUCTURAL WORK TYPE FOR NEW EXTENSION TO ESTABLISH A 2-STORY RESIDENTIAL BUILDING W/ CELLAR, IN CONJUNCTION W/ ALT-CO APPLICATION Q01227749-I1. No product keyword matched | 0 | Jun 26, 2026 |
| B | LVDZ, INC NYC DOB building permits | 9 | Construction Fence · Construction fence in conjunction with NB B08001895. No product keyword matched | 0 | Jun 26, 2026 |
| B | SEPHARDIC COMMUNITY YOUTH CENTER NYC DOB building permits | 9 | Plumbing · Reconnect gas piping to (4) gas fired chillers on the roof. The mechanical systems filing for chillers replacement filed and approved under job#B01403498-I1. No change in use egress and occupancy. No product keyword matched | 0 | Jun 26, 2026 |
| B | GLOBAL LLD REALTY LLC NYC DOB building permits | 9 | General Construction · REPAIR OF EXISTING CONCRETE PATIO AT REAR. No product keyword matched | 0 | Jun 26, 2026 |
| B | Transcend Forest LLC NYC DOB building permits | 9 | Mechanical Systems · FILING FOR GENERAL CONSTRUCTION/MECHANICAL WORK AS PER PLANS No product keyword matched | 0 | Jun 26, 2026 |
| B | AG CONTRACTORS INC NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL MODIFICATIONS TO INCLUDE HVAC REPLACEMENT ANDREPLACEMENT OF ASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCYOR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 26, 2026 |
| B | KWR ADVISORS, LLC NYC DOB building permits | 9 | Plumbing · Proposing work to tenant space. Installation -(1) RPZ, (1) grease interceptor, (1) Gas H.W. Heater, (3) Ice Bins, (7) non res. sinks,(6) drains. relocate - (1) Dishwasher, (2) non res sinks,,(1) ice bin, (1) Lav,,(1) ice machine.-all w/ associated piping No product keyword matched | 0 | Jun 26, 2026 |
| B | 255TH STREET PROPERTY LLC NYC DOB building permits | 9 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 0 | Jun 26, 2026 |
| B | NEW LEE CONSTRUCTION CORP NYC DOB building permits | 9 | Mechanical Systems · INTERIOR RENOVATION OF EXISTING J.L.W.Q.A. AT THE 4TH & 5TH FLOORS. DEMOLITION AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS, CONSTRUCTION OF INTERIOR STAIRCASE AND MH WORK. PL SP AND EL TO BE FILED UNDER SUBSEQUENT APPLICATION. No product keyword matched | 0 | Jun 26, 2026 |
| B | ALPINE ENTERPRISES NY LTD NYC DOB building permits | 9 | Mechanical Systems · Application filed for mechanical work in conjunction with NB Construction. No product keyword matched | 0 | Jun 26, 2026 |
| B | ROGERS BLDG LLC NYC DOB building permits | 9 | General Construction · RENOVATION OF EXISTING 001 FLOOR RETAIL LOCATION,INCLUDING FINISH UPDATES, FENESTRATION ADDITIONS AND RESTORATION OF THE FACADE, AND MINOR MILLWORK RELATED TO ADDITIONAL MERCHANDISE DISPLAY AND STORAGE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Jun 26, 2026 |
| B | NEW YORK GENERAL CONST* NYC DOB building permits | 9 | General Construction · PARTIAL RENOVATION OF 3RD FLOOR SPACE. CONSTRUCTION INCLUDES THE REMOVAL OF NON- LOAD BEARING INTERIOR PARTITIONS, NEW MILLWORK, HARDWOOD FLOORING AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INCLUDED IN THIS APPLICATION No product keyword matched | 0 | Jun 26, 2026 |
| B | BDMD Corp. NYC DOB building permits | 9 | General Construction · PROPOSED INSTALL 2-BUSINESS AWNING AS PER PLAN. NO CHANGE IN USE, OCCUPANCY AND EGRESS. No product keyword matched | 0 | Jun 26, 2026 |
| B | HARTFORD INTERNATIONAL UNIVERSITY NYC DOB building permits | 9 | Construction Fence · INSTALL NEW CONSTRUCTION FENCE AROUND EXISTING BUILDING No product keyword matched | 0 | Jun 26, 2026 |
| B | 3747 82nd Street LLC NYC DOB building permits | 9 | Mechanical Systems · REPLACEMENT OF 6 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | Flagstar Bank NYC DOB building permits | 9 | Mechanical Systems · DIRECT REPLACEMENT OF (1) 7.5-TON HVAC PACKAGE UNIT AND INSTALLATION OF (1) 18,000 BTU MINI-SPLIT ON GRADE No product keyword matched | 0 | Jun 26, 2026 |
| B | H B H CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · IN APT B1R, CONSTRUCT PRIMARY EN-SUITE BATHROOM INCLUDING WATER CLOSET,LAVATORY, AND CURBED STEP-IN SHOWER WITH ALL ASSOC. PLUMBING AND FINISHES. NO CHANGE IN OCCUPANCY USE OR EGRESS. No product keyword matched | 0 | Jun 26, 2026 |