Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | WEATHER OR NOT HEATING NYC DOB building permits | 9 | Structural · HEREBY FILING FOR THE VERTICAL ENALRGEMENT OR EXISTING ONE FAMILY DWELLING. INTERIOR RENOVATION OF ONE FAMILY DWELLING. No product keyword matched | 0 | Jun 30, 2026 |
| B | NEWKEY REALTY LLC NYC DOB building permits |
| 9 |
Suspended Scaffold · INSPECTION & FISP REPAIRS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. ADDING DROPS OPTIONS. No product keyword matched |
| 0 |
| Jun 30, 2026 |
| B | TERRACE GARDENS PLAZA, INC. NYC DOB building permits | 9 | Structural · Herewith filing for repairs to garage in existing building. No change to Use, Occupancy or Egress. No product keyword matched | 0 | Jun 30, 2026 |
| B | BEST WORK HOLDING NEW YORK LLC NYC DOB building permits | 9 | Standpipe · INSTALLATION OF A TEMPORARY STANDPIPE WITH AIR PRESSURIZED SYSTEM IN CONJUNCTION WITH ALT 1 APPLICATION# 122927351. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS BUILDING. No product keyword matched | 0 | Jun 30, 2026 |
| B | EVAN LONG ISLAND PAINT CO NYC DOB building permits | 9 | General Construction · Propose front facade brick work and awning. No product keyword matched | 0 | Jun 30, 2026 |
| B | 119 ST. MARKS LLC NYC DOB building permits | 9 | General Construction · UNIT 1 MINOR INTERIOR RENOVATION AND FACADE ALTERATION. REMOVE AND INSTALL FURRING WALLS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 30, 2026 |
| B | Courtyard by Marriott NY WTC Area NYC DOB building permits | 9 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Jun 30, 2026 |
| B | LUXURBAN HOTELS NYC DOB building permits | 9 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Jun 30, 2026 |
| B | DAL H CHUN ENGINEER, PC NYC DOB building permits | 9 | General Construction · PROPOSED TWO FAMILY DWELLING FLOOR JOIST GC WORK AND ST WORK AT FLOOR LEVEL 1 NEW REPLACING FOR DAMAGING BROKEN AND LOAD BEARING WALL REPLACING FOR DAMAGING BROKEN, REMOVED AND MINOR REPAIR FLOORING AS PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 30, 2026 |
| B | Cee & Cee Department Store NYC DOB building permits | 9 | General Construction · Replace existing metal roll-up gate and vertical support, partial section of aluminum store front frame and broken glass due to car accident. Comply with NYC DOB Violation VIO026-00869 as per plans. No change to existing occupancy use or egress. No product keyword matched | 0 | Jun 30, 2026 |
| B | 1000 Broadway llc NYC DOB building permits | 9 | General Construction · Replacement of the damaged bricks at the street facade No product keyword matched | 0 | Jun 30, 2026 |
| B | HELLER REALTY NYC DOB building permits | 9 | General Construction · Remove and Replace Defective Terra Cotta at 6 Lintels No product keyword matched | 0 | Jun 30, 2026 |
| B | ferdinana gomez house NYC DOB building permits | 9 | General Construction · REPLACEMENT EXTERIOR CONCRETE STAIR AN REPAIR LINTEL OVER GARAGE DOOR AS PER PLANS SUBMITTED NO CHANGE OF USE, OGESS OR OCCUPANCY UNDER THIIS APPLICATION No product keyword matched | 0 | Jun 30, 2026 |
| B | WESTERVELT II SI LLC NYC DOB building permits | 9 | Plumbing · SUBSEQUENT PLUMBING WORK TO REPLACE PLUMBING PIPING UNDERGROUND AT BASEMENT TO CORRECT ECB VIOLATION #39153427J. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 30, 2026 |
| B | GENCO LEE RENOVATION INC NYC DOB building permits | 9 | General Construction · HEREWITH FILING FOR GENERAL CONSTRUCTION WORK TO CLOSE THE OPENING BETWEEN APT #D803 AND #D804. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 30, 2026 |
| B | West Broadway Arhces Inc. NYC DOB building permits | 9 | Mechanical Systems · Respectfully request to file Post Approval Amendment to include details & additional notes as per building's final Inspection. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 30, 2026 |
| B | Spence School NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 30, 2026 |
| B | T & S CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 30, 2026 |
| B | Richmond Valley Rd LLC NYC DOB building permits | 9 | Construction Fence · HEREWITH TO PROPOSE TEMPORARY WOOD CONSTRUCTION FENCE - 8' H. x 640 LIN. FT. ONLY. No product keyword matched | 0 | Jun 30, 2026 |
| B | R & B CONTRACTING CO NYC DOB building permits | 9 | General Construction · APPLICATION FILE FOR PORCH AND STAIR REPAIR WORK AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 30, 2026 |
| B | ELYSEE INVESTMENTS NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF TEMPORARY SIDEWALK FENCE. No product keyword matched | 0 | Jun 30, 2026 |
| B | PALADIN CONST. SVCS CORP NYC DOB building permits | 9 | General Construction · Alteration herewith filed for renovation of at existing apartment 37A on the third floor of an existing 119 families, mixed use building. Work includes renovation of existing kitchen, existing bathrooms. No change in occupancy, use, egress, and bulk. No product keyword matched | 0 | Jun 30, 2026 |
| B | AJL BUILDERS, CORP NYC DOB building permits | 9 | General Construction · PROPOSED REPLACEMENT OF BRICKS EXTERIOR VESTIBULE ENTRANCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 30, 2026 |
| B | GWG NY LLC NYC DOB building permits | 9 | Mechanical Systems · Mechanical work for tenant space including commercial kitchen with Resfab ventless fryer units. No product keyword matched | 0 | Jun 30, 2026 |
| B | TONY'SCONTRACTINGALP LLC NYC DOB building permits | 9 | General Construction · NEW DOOR AT BASEMENT AND FIRST FLOOR (2), INCLUDING ENLARGEMENT OF REAR FACADE OPENING AT LEVEL 1. NEW REAR DECK AT LEVEL 1 AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. NO COMBUSTIBLE MATERIALS WITHIN 3' OF PROPERTY LINE. No product keyword matched | 0 | Jun 30, 2026 |
| B | DENAIR HVAC INC NYC DOB building permits | 9 | Mechanical Systems · Installation of (1) ceiling ducted packaged heat pump unit to serve building lobby. No product keyword matched | 0 | Jun 30, 2026 |
| B | GRAMERCY 29 APTS. INC. NYC DOB building permits | 9 | Sprinklers · PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION OF THE RENOVATION OF APARTMENT #12. MECHANICAL AND STRUCTURAL APPLICATIONS FILED UNDER SEPARATE DOB NOW APPLICATIONS AND ARCHITECTURAL WORK FILED UNDER BIS APPLICATION.NO CHANGE OF USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 30, 2026 |
| B | BRIDGEMONT ASSOCIATES, LLC NYC DOB building permits | 9 | Sign · Install illuminated wall sign on raceway. No change in use, occupancy, or egress No product keyword matched | 0 | Jun 30, 2026 |
| B | 135 West 50th Ground Owner LLC NYC DOB building permits | 9 | General Construction · MPP Project-000000631 - Please assign to MPP examiner. Filing for Article 1 Chapter conversion of the 12th floor from commercial to residential use as shown. No change to the rest of the building. No product keyword matched | 0 | Jun 30, 2026 |
| B | ATLAS PLBG AND METER WKS NYC DOB building permits | 9 | Plumbing · FILING FOR GAS REPIPE TO GAS-FIRED APPLIANCES AS PER PLANS. No product keyword matched | 0 | Jun 30, 2026 |
| B | Marron Capital LLC NYC DOB building permits | 9 | General Construction · Renovation of an existing apartment# 3W on the third floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change change to use, egress or occupancy. No product keyword matched | 0 | Jun 30, 2026 |
| B | HANDLER REAL ESTATE NYC DOB building permits | 9 | Suspended Scaffold · FACADE RESTORATION, INSPECTIONS No product keyword matched | 0 | Jun 29, 2026 |
| B | STM INTERIORS LLC NYC DOB building permits | 9 | Mechanical Systems · 10B: Installation of mechanical units as per plans filed herewith. No change to use, egress or occupancy No product keyword matched | 0 | Jun 29, 2026 |
| B | PEGASUS P&H CORP NYC DOB building permits | 9 | Plumbing · PLUMBING WORK AT NINTH FLOOR APARTMENT 9E AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OROCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | VENDOLA INC NYC DOB building permits | 9 | Plumbing · Subsequent filing for plumbing installation on the 1st floor. No change to the use, egress or occupancy. No product keyword matched | 0 | Jun 29, 2026 |
| B | VENDOME PROPERTY MANAGEMENT CO.,INC NYC DOB building permits | 9 | Plumbing · Interior Renovation of Unit 14 with new sink, lavatory, shower, and water closet. No change in use, occupancy, or egress. No product keyword matched | 0 | Jun 29, 2026 |
| B | L. GLASHOW, INC NYC DOB building permits | 9 | Plumbing · PLANS DEPICT EXISTING CONDITIONS RESULTING FROM ALL WORK PERFORMED UNDER ALT-1 #101616262. THIS APPLICATION FILED UNDER THE RULES OF TPPN 3/97. ALT #101616262 TO BE WITHDRAWN & PLUMBING SIGN-OFF TO BE OBTAINED BY THIS APPLICATION PL # M00885207-I1 No product keyword matched | 0 | Jun 29, 2026 |
| B | SQUARE BUILDERS INC NYC DOB building permits | 9 | Mechanical Systems · New split system for heating and cooling. New ventilation systems. No product keyword matched | 0 | Jun 29, 2026 |
| B | NBDG LLC NYC DOB building permits | 9 | General Construction · Interior renovation of existing 1-family dwelling. No change in use, occupancy, or egress. No product keyword matched | 0 | Jun 29, 2026 |
| B | ELEZI RENOVATIONS INC NYC DOB building permits | 9 | General Construction · Minor renovation of Kitchen, Bathroom, Powder Room and closets - 12th Floor Apartment E. No product keyword matched | 0 | Jun 29, 2026 |
| B | CUBE BUILDERS GROUP INC NYC DOB building permits | 9 | General Construction · JOB FILED HEREWITH TO REMOVE EXTERIOR WALL INFILL AND INSTALL NEW GARAGE DOOR AT EXISTING GARAGE DOOR OPENING TO REMEDY COMPLAINT #3A48208 AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 29, 2026 |
| B | St. Francis of Assisi Church NYC DOB building permits | 9 | General Construction · New storage shed accessory to existing church No product keyword matched | 0 | Jun 29, 2026 |
| B | ARVERNE COMMUNITY CENTER GROUP NYC DOB building permits | 9 | Standpipe · Filed in conjunction with NB # 421961513. Filing for Plumbing, Sprinkler and Standpipe for a New 3 Story Charter School. No product keyword matched | 0 | Jun 29, 2026 |
| B | 60 BOX STREET LLC NYC DOB building permits | 9 | Sprinklers · Propose sprinkler system for a new 6-story residential building, filed in conjunction with NB # B01155417-I1. No product keyword matched | 0 | Jun 29, 2026 |
| B | CREO PROJECTS LLC NYC DOB building permits | 9 | Mechanical Systems · Installation of HVAC system in Unit B on the 2nd and 3rd floor, as well as heat pump units on roof. No change to use, egress or occupancy. No product keyword matched | 0 | Jun 29, 2026 |
| B | 61-25 LLC NYC DOB building permits | 9 | Curb Cut · FILE NEW 10' DROP CURB WITH 1'-6 SPLAYS ON BOTHSIDE No product keyword matched | 0 | Jun 29, 2026 |
| B | FW FREEDOM CONSTRUCTION NYC DOB building permits | 9 | General Construction · Restoration application to repair the cracks and damages on the facade, parapets, replace windows. No change to any means of egress and occupancy. No product keyword matched | 0 | Jun 29, 2026 |
| B | THE FORTUNE SOCIETY INC NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 29, 2026 |
| B | THE PUBLIC THEATER NYC DOB building permits | 9 | Sprinklers · Sprinkler scope associated with the renovation of the existing Safe Area at Public Theater. No change of use, egress or occupancy. No product keyword matched | 0 | Jun 29, 2026 |
| B | GOLDEN AGE HOSPITALITY NYC DOB building permits | 9 | General Construction · Interior renovation of existing retail space as per plans. No change on use, occupancy or egress. No product keyword matched | 0 | Jun 29, 2026 |