Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CBE NYC DOB building permits | 9 | Structural · Structural repairs for partial 6th floor framing (ceiling of 5th floor). (area of work is approximately 20% of total floor area 1445 sf) No product keyword matched | 0 | Jul 1, 2026 |
| B | ADVANCED PLBG LLC NYC DOB building permits |
| 9 |
Plumbing · HEREWITH FILING PLUMBING WORK AS PER PLANS, FILED TO SUPERSEDE M00363205-I1. No product keyword matched |
| 0 |
| Jul 1, 2026 |
| B | AMERSON PARTNERS LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING RESTAURANT ON PARTIAL CELLAR AND PARTIAL 1ST FLOOR. PROPOSED GENERAL CONSTRUCTION WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS No product keyword matched | 0 | Jul 1, 2026 |
| B | ICON PARKING HOLDINGS LLC NYC DOB building permits | 9 | General Construction · Install traffic waterproofing membrane, roofing membrane at bulkheads and minor facade repair at existing parking garage. No change to use, occupancy or egress. No product keyword matched | 0 | Jul 1, 2026 |
| B | FJN DEVELOPEMENT CORP NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING. No product keyword matched | 0 | Jul 1, 2026 |
| B | JBUILD LLC NYC DOB building permits | 9 | Mechanical Systems · Mechanical work associated with the renovation of an existing fifth floor apartment. No product keyword matched | 0 | Jul 1, 2026 |
| B | DDI GENERAL CONTRTING LLC NYC DOB building permits | 9 | Structural · STRUCTURAL WORK IN COJUCTION WITH ALT-1 APPLICATION AS INDICATED ON PLANS FILED HEREWITH No product keyword matched | 0 | Jul 1, 2026 |
| B | ALCA RENOVATIONS INC NYC DOB building permits | 9 | General Construction · Minor Interior renovation of existing of existing apartment 3bc on the 3rd Floor. No product keyword matched | 0 | Jul 1, 2026 |
| B | PSI CONSTRUCTION.LLC NYC DOB building permits | 9 | Mechanical Systems · Replacing AC units with related ductwork as per drawings no change in use egress or occupancy No product keyword matched | 0 | Jul 1, 2026 |
| B | HARVEST CHURCH OF NEW YORK NYC DOB building permits | 9 | Plumbing · INSTALL NEW PLUMBING SYSTEM FOR 2-STORY NEW ENLARGEMENT SUBSEQUENT WITH DOB NOW JOB#Q01192918. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 1, 2026 |
| B | O THIS WAY UP 3 INC NYC DOB building permits | 9 | General Construction · FILING APPLICATION FOR THE INTERIOR RENOVATION OF APARTMENT A64 ON THE 6TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |
| B | TRIPLE J & R INC NYC DOB building permits | 9 | General Construction · APPLICATION FILED TO PROPOSE INTERIOR RENOVATION OF EXISTING RESIDENTIAL BUILDING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. NO LOAD-BEARING WALLS SHALL BE REMOVED UNDER THIS TYPE OF WORK/APPLICATION No product keyword matched | 0 | Jul 1, 2026 |
| B | JM BEDNARZ INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATIONS, PARTITIONS, FINISHES TO APARTMENT 2D. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |
| B | BNOS ZION OF BOBOV INC NYC DOB building permits | 9 | Plumbing · Filing Plumbing fixtures for kitchen on 1st Floor in conjunction with DOB #B00763561-I1 No product keyword matched | 0 | Jul 1, 2026 |
| B | PULLMAN SST INC NYC DOB building permits | 9 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans No product keyword matched | 0 | Jul 1, 2026 |
| B | QUALIFIED CONSTRN INC NYC DOB building permits | 9 | General Construction · Renovation of the existing building (1st, 2nd, and 3rd floors) damaged by fire as per the plan. No change to use, egress, or occupancy under this application. No product keyword matched | 0 | Jul 1, 2026 |
| B | ELMHURST HOSPITAL CENTER NYC DOB building permits | 9 | General Construction · Renovation of an existing labor and delivery suite. New partitions and finishes per layout. No product keyword matched | 0 | Jul 1, 2026 |
| B | ATLAS CONSTR OF NY , INC NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 0 | Jul 1, 2026 |
| B | K LIBERTY FOOD NYC DOB building permits | 9 | Mechanical Systems · RENOVATION OF EXISTING COMMERCIAL SPACE (SUPERMARKET)-REPLACED (3)ROOF TOP UNITS ON ROOF. NO CHANGE IN USE, OCCUPANCY AND EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 1, 2026 |
| B | MEHRA PROPERTIES INC. NYC DOB building permits | 9 | General Construction · Renovation of an existing building at 1st floor. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Jul 1, 2026 |
| B | CITIZENS ICON HOLDINGS NYC DOB building permits | 9 | Structural · Filing for repairs to existing parking garage. No change to use, occupancy or egress. No product keyword matched | 0 | Jul 1, 2026 |
| B | CSR GARAGE LLC NYC DOB building permits | 9 | Structural · Filing for temporary shoring. No change to occupancy, egress, or use. No product keyword matched | 0 | Jul 1, 2026 |
| B | GREAT BAY CONTRACTING INC NYC DOB building permits | 9 | General Construction · DEMOLITION OF NON-STRUCTURAL PARTITIONS, INSTALLATION OF NEW NON-STRUCTURAL PARTITIONS, NEW PLUMBING WORK AND COSMETIC INTERIOR FINISH WORK. NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING. ALL WALLS TO BE REMOVED ARE NON-LOAD BEARING. No product keyword matched | 0 | Jul 1, 2026 |
| B | PARISH PROPERTY MANAGEMEN NYC DOB building permits | 9 | General Construction · Removal of non-load bearing partitions; repair of floor slab on grade as necessary. No product keyword matched | 0 | Jul 1, 2026 |
| B | APEC CORP NYC DOB building permits | 9 | Plumbing · HEREBY FILING FOR THE INSTALLATION, REPLACEMENT AND REMOVAL OF FIXTURES IN EXISTING APARTMENT 12K. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 1, 2026 |
| B | STANLEY HO FAMILY TRUST LLC NYC DOB building permits | 9 | Mechanical Systems · REPLACEMENT OF A/C BLOWER UNITS FOR EXISTING APRTMENT UNIT. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 1, 2026 |
| B | G.R.&J HUB HOME IMPROVE NYC DOB building permits | 9 | Structural · ENLARGEMENT OF OPEING AT THE 1ST FLOOR REAR ELEVATION AND FLOOR INFILL AT ONE REMOVED CHIMNEY AT EACH FLOOR LEVEL.. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Jul 1, 2026 |
| B | Prince International Corp NYC DOB building permits | 9 | Plumbing · filing for the gas piping to the heat/ air conditioning unit in the roof. no change of use. PAA BEING FILED TO AMEND PLANS AS PER PL DIVISION No product keyword matched | 0 | Jul 1, 2026 |
| B | EBL CONTRACTING CORP. NYC DOB building permits | 9 | General Construction · Interior Renovation as per plans, no change in uses, occupancy and bulk. No product keyword matched | 0 | Jul 1, 2026 |
| B | MID ISLAND CONTRACTING CO NYC DOB building permits | 9 | General Construction · REPLACE SEVENTEEN (17) WINDOWS AND FRAMING. REPLACE DECORATIVE WOOD TRIM AT FACADE WITH NEW 1x6 PVC TRIM AS PER PLANS. PATCH AND PAINT TO MATCH SAME. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |
| B | EPIC MECHANICAL CONTRACTO NYC DOB building permits | 9 | Mechanical Systems · Modification to mechanical equipment as per plans. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 1, 2026 |
| B | EL JEFE CANTINA NYC DOB building permits | 9 | Plumbing · INSTALL A NEW TOILET ROOM AT EXISTING EATING AND DRINKING ESTABLISHMENT No product keyword matched | 0 | Jul 1, 2026 |
| B | HEALY CONSTRUCT SERV, INC NYC DOB building permits | 9 | Structural · EXPANSION IN PLACE TO EXISTING FOOT LOCKER (COMBINING 2 SPACES), STRUCTURAL SCOPE INCLUDES NEW INTERIOR PARTITIONS, STOREFRONT, MARKETING FIXTURES, AND SUSPENDED MECHANICAL EQUIPMENT. No product keyword matched | 0 | Jul 1, 2026 |
| B | S & N BUILDERS INC NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AT 444 HUMBOLDT STREETBROOKLYN, NY 11211 No product keyword matched | 0 | Jul 1, 2026 |
| B | SWORL NYC DOB building permits | 9 | General Construction · interior renovation of existing 1st floor retail space. no change to use, egress or occupancy No product keyword matched | 0 | Jul 1, 2026 |
| B | 211 PLAZA REALTY LLC NYC DOB building permits | 9 | Plumbing · REMOVE TWO EXISTING PLUMBING FIXTURE ON THE 1ST FLOOR (1)TOILER (1)LAV. ADD: (1)KITCHEN SINK(1) SHOWER (1)LAV (1)TOILET(1) WASHER (1)SERVICE SINK AND (1)FLOOR DRAIN. No product keyword matched | 0 | Jul 1, 2026 |
| B | Seward Park Cooperative NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Jul 1, 2026 |
| B | 324 WEST 22ND ST REVOKABLE TRUST NYC DOB building permits | 9 | General Construction · RENOVATION OF EXISTING 4-STORY RESIDENTIAL BUILDING. CHANGE OCCUPANCY FROM TWO FAMILIES TO ONE FAMILY. No product keyword matched | 0 | Jul 1, 2026 |
| B | DMIA O' LARIEUX LLC NYC DOB building permits | 9 | Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jul 1, 2026 |
| B | VARICK 3 AND 4 LLC NYC DOB building permits | 9 | Mechanical Systems · Install new HVAC system in part of existing office space at 7th floor No product keyword matched | 0 | Jul 1, 2026 |
| B | ONE PARK ROW OWNER LLC NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 0 | Jul 1, 2026 |
| B | FANTIS TRANSFER INC NYC DOB building permits | 9 | Structural · INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |
| B | CONGAL REALTY CORP. NYC DOB building permits | 9 | Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening including new reinforced steel posts between cellar slab and first floor wood joists. Replacement of loose bricks on facade of building. No product keyword matched | 0 | Jul 1, 2026 |
| B | 21 BUILDING CORP. NYC DOB building permits | 9 | General Construction · renovate suite 301 on 3rd fl. Non bearing partitions and finishes removal. New partitions and finishes. no change in use, egress or occupancy No product keyword matched | 0 | Jul 1, 2026 |
| B | FAR ROCKAWAY CHURCH OF CHRIST NYC DOB building permits | 9 | Mechanical Systems · APPLICATION BEING FILED TO REPLACE EXISTING GAS PACKAGE UBNIT AT ROOF. No product keyword matched | 0 | Jul 1, 2026 |
| B | Dinner Party Restaurant LLC NYC DOB building permits | 9 | Mechanical Systems · Filing for mechanical work for the direct replacement and in-kind installation of (1) one Roof Top Unit with a similar unit. No change in use, egress, or occupancy. No product keyword matched | 0 | Jul 1, 2026 |
| B | HALAL CHICKS AND PLATTER NYC DOB building permits | 9 | Mechanical Systems · INSTALL KITCHEN HOOD AND DUCTWORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |
| B | AVALON DESIGN LLC NYC DOB building permits | 9 | Construction Fence · install a construction fence around the property No product keyword matched | 0 | Jul 1, 2026 |
| B | NEW VANDERBILT REHAB AND CARE CENTE NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Jul 1, 2026 |
| B | AVORIA PROPERTIES LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF NEW MECHANICAL SYSTEMS WITHIN EXISTING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 1, 2026 |