Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | GET IT DONE NOW USA, LLC NYC DOB building permits | 9 | Structural · In conjunction with renovation of existing 2 family townhouse. interior and exterior Structural work only. No product keyword matched | 0 | Jul 7, 2026 |
| B | KSF SERVICES LLC NYC DOB building permits |
| 9 |
Protection and Mechanical Methods · INSTALLATION OF OUTRIGGER PLATFORM IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched |
| 0 |
| Jul 7, 2026 |
| B | VENTURE HOME IMPROVEMENT NYC DOB building permits | 9 | General Construction · THIS APPLICATION IS FILED TO REPAIR THE EX. 2 FAMILY RESIDENTIAL BUILDING DUE TO FIRE AND SMOKE DAMAGE, NEW FLOOR FINISH, & WALL FINISH IN SOME AREAS. NO CHANGE OF USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jul 7, 2026 |
| B | 125 OCEAN AVENUE OWNERS CORP. NYC DOB building permits | 9 | Structural · Facade repairs and parapet replacement as per plans; no change to use, egress, or occupancy. No product keyword matched | 0 | Jul 7, 2026 |
| B | P. GEORGOPOULOS ARCHITECT PC NYC DOB building permits | 9 | Suspended Scaffold · Application for the installation and use of suspended scaffold for painting as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 0 | Jul 7, 2026 |
| B | TURBO BUILD LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION ON 1ST FLOOR OF EXISTING 2-STORY BUILDING WITH CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | Le Petit Nissa NYC DOB building permits | 9 | Plumbing · PLUMBING WORK IN EXISTING EATING AND DRINKING ESTABLISHMENT, FILED IN CONJUNCTION WITH GC APPLICATION M01403577-I1 . NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 7, 2026 |
| B | BACHE 206 LLC NYC DOB building permits | 9 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#S01133068 No product keyword matched | 0 | Jul 7, 2026 |
| B | EIGHTY SEVEN DEVELPMT LLC NYC DOB building permits | 9 | Antenna · Installation of new VERIZON site on the roof. Install 5 sectors (11 antennas) with associated parts, 10 RRH units, 3 GPS antennas and 1 equipment platform with cabinets. Related conduits through 2nd-10th floor and service connection on the ground floor. No product keyword matched | 0 | Jul 7, 2026 |
| B | 18 Spring ST LLC NYC DOB building permits | 9 | General Construction · HEREWITH FILING FOR A RENOVATION OF THE FRONT FACADE WITH CEMENT AND BRICKS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 7, 2026 |
| B | HIS NY2 INC NYC DOB building permits | 9 | General Construction · HEREWITH FILE PLANS TO RENOVATED APARTMENT 1F, GENERAL CONSTRUCTION TO INCLUD ELIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT, REPLACEMENT OF APPLIANCES AND PLUMBING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | AKO BUILDERS AND HOME IMP NYC DOB building permits | 9 | General Construction · Construct new 5'x12' wood deck at rear of building No product keyword matched | 0 | Jul 7, 2026 |
| B | B & B GLOBAL DEVELOPMENT NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL FILING IN CONJUNCTION WITH ALT I APPLICATION B01166974 No product keyword matched | 0 | Jul 7, 2026 |
| B | Mosdos Chasidei Skver TYY of BP NYC DOB building permits | 9 | Construction Fence · Temporary Construction Fence No product keyword matched | 0 | Jul 7, 2026 |
| B | BH Tilden LLC NYC DOB building permits | 9 | General Construction · FACADE RESTORATION No product keyword matched | 0 | Jul 7, 2026 |
| B | MM105 LLC NYC DOB building permits | 9 | Construction Fence · Proposed Construction Fence No product keyword matched | 0 | Jul 7, 2026 |
| B | COMMUNITY CHURCH OF NEW YORK NYC DOB building permits | 9 | General Construction · INTERIOR DEMOLITION OF 1ST AND 2ND FLOORS AS PER PLANS, APPROX. 17,000 SQFT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | PARKVIEW P&H INC NYC DOB building permits | 9 | Plumbing · MODIFICATION TO PLUMBING FIXTURES AND ASSOCIATED PIPING RELATED TO ALTERATION. No product keyword matched | 0 | Jul 7, 2026 |
| B | ALLIANCE GENERAL CONST* NYC DOB building permits | 9 | General Construction · Renovation of existing apartment D on the 1st Floor. No change of use, egress or occupancy under this application. No product keyword matched | 0 | Jul 7, 2026 |
| B | Yeshiva Yagdil Torah NYC DOB building permits | 9 | Mechanical Systems · Mechanical work in conjunction with JOB # 320023363 No product keyword matched | 0 | Jul 7, 2026 |
| B | THE MARCAL GROUP NYC DOB building permits | 9 | Boiler Equipment · Install Fuel Oil storage tank in cellar and relocation of existing belly tank onto Roof along with all associated fuel oil piping, vents, fill, and pump set. Filing supersedes #X01117895-I1 and its scope. No product keyword matched | 0 | Jul 7, 2026 |
| B | INTERIORS BY AJ LTD NYC DOB building permits | 9 | General Construction · Proposed interior renovation of Apt #8901, includes the removal of ex. partition walls, removal of pocket doors in the Living room. Installation of new partition wall at the existing pocket door location. Install new ceiling with integrated lighting fixt No product keyword matched | 0 | Jul 7, 2026 |
| B | 521 MAD NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF TWO SPLIT SYSTEM CONDENSERS ON THE ROOF, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | Liberty Management NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF APARTMENT 3E ON THE 3RD FLOOR. No product keyword matched | 0 | Jul 7, 2026 |
| B | 196 GRAND LLC NYC DOB building permits | 9 | Plumbing · JOB FILED INSTALL HANDICAP BATHROOM IN CELLAR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 7, 2026 |
| B | MN COTTAGE BR INC NYC DOB building permits | 9 | General Construction · APPLICATION FILE FOR WINDOWS ENLARGED AND REDUCED, REMOVED IN VARIOUS LOCATIONS, REMOVE AT REAR OF PREMISE A METAL STAIRS TO THE ATTIC AS PER PLAN TO COMPLY ECB VIOLATION (39110545K) ALSO LIFTING STOP WORK ORDER NO CHANGE USE,EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | ELVIRA SEMINARA NYC DOB building permits | 9 | General Construction · DEMOLITION OF INTERIOR NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS ATTACHED AT 1ST FLOOR AND CELLAR IN PREPARATION FOR NEW TENANCY BUILD-OUT. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | CENTURY APARTMENTS NYC DOB building permits | 9 | Mechanical Systems · REPLACEMENT HVAC UNITS. No product keyword matched | 0 | Jul 7, 2026 |
| B | SKYLARK MANAGEMENT GROUP, INC. NYC DOB building permits | 9 | General Construction · Filing application to address open work without permit violations (39124955K and 39124956M) and reflect/legalize existing conditions at the site (only). No change to use, occupancy, or egress. No product keyword matched | 0 | Jul 7, 2026 |
| B | 1816 HONE AVE LLC NYC DOB building permits | 9 | Boiler Equipment · INSTALL REPLACEMENT 275-GALLON FUEL STORAGE TANK IN BASEMENT. ABANDON EXISTING BURIED 550-GALLON FUEL STORAGE TANK IN YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | 1601 BRONXDALE PROPERTY OWNER LLC NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION AND STRUCTURAL WORK CONSISTING OF INSTALLATION OF NEW WALKWAY AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | PALLADIUM WINDOW SOLUTION NYC DOB building permits | 9 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 0 | Jul 7, 2026 |
| B | MJ REIMANS INC NYC DOB building permits | 9 | Mechanical Systems · DIRECT REPLACEMENT OF THREE (3) 5-TON AND ONE (1) 3.5-TON SPLIT HVAC SYSTEMS, INCLUDING NEW ROOFTOP CONDENSING UNITS ON STEEL ROOF RAILS AND INDOOR FURNACE/AIR HANDLER UNITS. RECONNECT TO EXISTING DUCT WORK, REFRIGERANT, GAS, CONDENSATE, AND FLUE PIPING. No product keyword matched | 0 | Jul 7, 2026 |
| B | EDEN GENERAL CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · REPAIR AND REBUILD THE FRONT PARAPET WALL, INCLUDING BRICKWORK, FLASHING, ROOFING TOUCH-UPS, AND NEW STUCCO FINISH IN KIND AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 7, 2026 |
| B | DYNAMIC ELEC. SYSTEM INC NYC DOB electrical permits | 9 | Building 3 No product keyword matched | 0 | Jul 7, 2026 |
| B | SOLO ENERGY & ELECTRICAL NYC DOB electrical permits | 9 | Installation of EV Chargers in parking garage No product keyword matched | 0 | Jul 7, 2026 |
| B | ABINGTON PROPERTIES NYC DOB building permits | 9 | Structural · FILING FOR STRUCTURAL WORK FOR THE REPAIR OF THE PARKING GARAGE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | CORNERSTONEBUILDERS NYC DOB building permits | 9 | General Construction · PROPOSED NEW SIX STORY AND CELLAR MIXED USE BUILDING. No product keyword matched | 0 | Jul 6, 2026 |
| B | MNC GENERAL CONTRACTORS NYC DOB building permits | 9 | General Construction · NEW SEVEN (7) STORY AND CELLAR COMMUNITY FACILITY & TEN (10) FAMILY RESIDENTIAL BUILDING. No product keyword matched | 0 | Jul 6, 2026 |
| B | YMY MANAGEMENT NYC DOB building permits | 9 | General Construction · EXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | DIG NYC CONSTRUCTION NYC DOB building permits | 9 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH GC APPLICATION. INSTALLATION OF WASTE AND WATER LINES FOR RESIDENTIAL PLUMBING FIXTURES. AND DRYWELL IN OSP. No product keyword matched | 0 | Jul 6, 2026 |
| B | BORAY ESTATES CO LLC NYC DOB building permits | 9 | General Construction · EXTERIOR RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | 20 Remsen, LLC NYC DOB building permits | 9 | Support of Excavation · SOE work proposed for a single-family home. No change to use, occupancy or egress under this application. No product keyword matched | 0 | Jul 6, 2026 |
| B | G.B. & SON, INC NYC DOB building permits | 9 | Plumbing · Installation of new plumbing fixtures on new roughing. No change in use, occupancy or egress. No product keyword matched | 0 | Jul 6, 2026 |
| B | LMF REALTY LLC NYC DOB building permits | 9 | General Construction · GUT RENOVATION OF EXISTING GARAGE AT THE REAR YARD. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | LAM GROUP NYC DOB building permits | 9 | General Construction · PROPOSED AMENDMENT OF CO FOR A SENIOR ADULT CENTER ON THE FOURTH FLOOR AS PER PLAN. CHANGE IN USE AND OCCUPANCY,OBTAIN A NEW CO. No product keyword matched | 0 | Jul 6, 2026 |
| B | TISHMAN CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 6, 2026 |
| B | L.J.S. PIPING AND HEATING NYC DOB building permits | 9 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH BUILDING RENOVATION.KITCHEN & BATHROOM RENOVATION. No product keyword matched | 0 | Jul 6, 2026 |
| B | ST. JOHN'S UNIVERSITY NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDIN, HEAVY DUTY SIDEWALK SHED, AND PLYWOOD FENCE AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 6, 2026 |
| B | Jing Cheng Realty Inc. NYC DOB building permits | 9 | General Construction · FILE CONSTRUCTION WORK WITH REMOVE PARTITION AND DOOR AT CELLAR WITH REPAIR WALL, CEILING, FLOORING AND PAINTING AS PER PLAN. TO ADDRESS ECB VIOLATION# 35473095J; 39160624Y. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |