Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SQUARE INDIGO INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING RESIDENTIAL APARTMENT, INCLUDING KITCHEN AND BATHROOM MODIFICATIONS, PLUMBING FIXTURE RELOCATION/INSTALLATION, RELATED NON-STRUCTURAL PARTITION WORK, AND FINISHES. MINOR STRUCTURAL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jul 9, 2026 |
| B |
| IDL CONTRACTING SVCS LLC NYC DOB building permits |
| 9 |
Structural · Repairment of damaged floor, replacement of existing bent floor joist and studs of wall. No product keyword matched |
| 0 |
| Jul 9, 2026 |
| B | MEADOW PARTNERS NYC DOB building permits | 9 | Plumbing · plumbing work as shown on cellar and 1st floor No product keyword matched | 0 | Jul 9, 2026 |
| B | ED.EN CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · Legalization of open rear yard wood deck. No change in use egress or occupancy under this application. No product keyword matched | 0 | Jul 9, 2026 |
| B | ROCKHILL MANAGEMENT LLC NYC DOB building permits | 9 | Structural · FILING STRUCTURAL WORK TO INSTALL NEW FRAMING AND SUPPORTS FOR THE NEW MARQUEE INSTALLATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | TRUSTED DESIGNS HOME IMPROVEMENT NYC DOB building permits | 9 | Plumbing · PROPOSED PLUMBING AT CELLAR, 1ST AND 2ND FLOOR. No product keyword matched | 0 | Jul 9, 2026 |
| B | VAI CONSTRUCTION INC NYC DOB building permits | 9 | Structural · STRUCTURAL REPAIR OF CELLAR CONCRETE COLUMN, AND PATCH HOLE ON GARAGE WALL. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | CHOIKANG INC NYC DOB building permits | 9 | General Construction · RENOVATION OF MARTIAL ART STUDIO, INCLUDING INSTALLATION OF PARTITION, PLUMBING FIXTURE AND FLOOR FINISH. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 9, 2026 |
| B | QUALIFIED CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · FILING FOR RECREATION ROOM AND STORAGE IN THE CELLAR WITH RESTRICTIVE DECLARATION FILED AT NY CITY REGISTER FOR THREE-PIECE BATHROOM FIXTURES NO CHANGE TO USE EGRESS OR OCCUPANCY No product keyword matched | 0 | Jul 9, 2026 |
| B | LEKAJ & JUBAJ INC NYC DOB building permits | 9 | General Construction · Interior renovation with vertical and horizontal enlargement to show additional occupied floors on CO associated with vertical enlargement as per plans filed herewith. No product keyword matched | 0 | Jul 9, 2026 |
| B | L & L SUAREZ CONSTRUCTION NYC DOB building permits | 9 | General Construction · DOB NOW APPLICATION FILED FOR REPAIR OF EXISTING HOLE IN ROOF CREATED BY FDNY TO ALLOW SMOKE VENTING AND ACCESS TO FIRE IN FIFTH FLOOR APARTMENT. WORK INCLUDES REMOVAL OF TEMPORARY PLYWOOD PATCH INSPECTION AND REPAIR COCKLOFT FRAMING PARTITIONS USED. No product keyword matched | 0 | Jul 9, 2026 |
| B | CATTRO CONSULTING GROUP NYC DOB building permits | 9 | General Construction · REPAIR EXISTING EAST MASONRY WALL. WORK TO INCLUDE STUCCO REMOVAL, PARTIAL DAMAGED BRICK REPLACEMENT, REPOINTING, & APPLICATION OF NEW BREATHABLE SILANE/SILOXANE WATERREPELLENT. FURNISH & INSTALL 1/2 CEMENT BOARD WITH KEMPER WATERPROOF MEMBRANE ON EAST B No product keyword matched | 0 | Jul 9, 2026 |
| B | 162ND STREET REALTY LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION ALL FLOORS No product keyword matched | 0 | Jul 9, 2026 |
| B | Vrahos LLC NYC DOB building permits | 9 | Suspended Scaffold · Suspended Scaffold Installation for Facade Restoration and Inspection No product keyword matched | 0 | Jul 9, 2026 |
| B | NAIM CONSTRUCTION LLC NYC DOB building permits | 9 | General Construction · Facade repair is proposed for the existing property from the ground floor to the Penthouse. All as per submitted plans. No changes to use, egress, or occupancy under this application. No product keyword matched | 0 | Jul 9, 2026 |
| B | SAP INVESTMENT GROUP, S.A. NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL WORK ON A SINGLE-FAMILY RESIDENCE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | 5421 ROOSEVELT LLC NYC DOB building permits | 9 | Structural · STRUCTURAL APPLICATION IN CONJUNCTION WITH APPROVED NB APPLICATION # Q00690456-I1 No product keyword matched | 0 | Jul 9, 2026 |
| B | NY B&B PROPERTY LLC. NYC DOB building permits | 9 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 0 | Jul 9, 2026 |
| B | J&S CONTRACTING GROUP INC NYC DOB building permits | 9 | Structural · PROPOSED NEW STEEL ROOF DUNNAGE REPLACEMENT AND PRIVACY SCREEN INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | IDS MANAGEMENT LLC NYC DOB building permits | 9 | Sprinklers · Fire Sprinkler Plans filed herewith. No product keyword matched | 0 | Jul 9, 2026 |
| B | YS NY CONSTRUCTION INC NYC DOB building permits | 9 | Mechanical Systems · ESTABLISHMENT OF A NEW RESTAURANT WITHIN AN EXISTING COMMERCIAL SPACE INCLUDING INSTALLATION OF A NEW COMMERCIAL KITCHEN WITH EXHAUST HOOD. THERE IS NO CHANGE TO THE EXISTING USE, OCCUPANCY CLASSIFICATION, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 9, 2026 |
| B | TONY MORALES CORP NYC DOB building permits | 9 | General Construction · Proposed four [4] story + cellar residential use building. No product keyword matched | 0 | Jul 9, 2026 |
| B | (718)541-0701 MANAGEMENT NYC DOB building permits | 9 | Construction Fence · filing to erect an 8foot high plywood construction fence on the property line. no change in use, egress or occupancy. No product keyword matched | 0 | Jul 9, 2026 |
| B | RPH HOTELS 48TH STREET OWNER, LLC NYC DOB building permits | 9 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 0 | Jul 9, 2026 |
| B | MERIDIAN PROPERTIES LLC NYC DOB building permits | 9 | Suspended Scaffold · OUTRIGGER FOR FACADE REPAIR. No product keyword matched | 0 | Jul 9, 2026 |
| B | AVENTADOR CONSTRUCTION IN NYC DOB building permits | 9 | General Construction · REMOVE DOB VIOLATION# 34494558N, 34494557L. OBTAIN WORK PERMIT. REMOVE PARTIAL PARTITION WALL, RESTORE TO PRIOR LEGAL CONDITION AND INTERIOR RENOVATION ON 1ST FLOOR. NO CHANGE IN USE GROUP, EGRESS AND OCCUPANCY. (TOTAL: EXISTING ONE FAMILY CO# 77842/1991) No product keyword matched | 0 | Jul 9, 2026 |
| B | 5239 LUCKY LLC NYC DOB building permits | 9 | Full Demolition · FULLY DEMOLISH EXISTING HOUSE AND GARAGE No product keyword matched | 0 | Jul 9, 2026 |
| B | 128 HVAC INC NYC DOB building permits | 9 | Mechanical Systems · Interior partial-renovation to 6th floor unit # 620 - In conjunction with the OT # M01380366-I1 removal of two existing HVAC units to be replaced with in-kind units. No product keyword matched | 0 | Jul 9, 2026 |
| B | ALL CITY IRON WORKS LLC NYC DOB building permits | 9 | Structural · MODIFICATION OF EXISTING REAR YARD DECK AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 0 | Jul 9, 2026 |
| B | Champ's Auto Tech, Inc. NYC DOB building permits | 9 | Structural · ROOFTOP PARAPER SELECTIVE DOMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | BLAKA COOL INC NYC DOB building permits | 9 | Mechanical Systems · REMOVE AND REPLACE (2) EXISTING HVAC UNIT ON EXISTING DUNNAGE AT ROOF TOPWITH EXISTING DUCT WORK TO REMAIN. No product keyword matched | 0 | Jul 9, 2026 |
| B | Colliers Internatonal NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 0 | Jul 9, 2026 |
| B | TADKAR CONSTRUCTION INC NYC DOB building permits | 9 | Plumbing · Plumbing work in conjunction with interior renovation on an existing (2) Story + Basement Two Family Residential Building, No product keyword matched | 0 | Jul 9, 2026 |
| B | DAVID'S CONSTR.& HOME IM* NYC DOB building permits | 9 | General Construction · Remove illegal full height partition walls, 3-piece bathroom, and relocate & legalize 2-piece powder room & slop sink in cellar. Restore cellar to prior legal use. Cap & remove illegal plumbing fixtures in attic. No change in occupancy use or egress No product keyword matched | 0 | Jul 9, 2026 |
| B | RAPTOR MECHANICAL, INC NYC DOB building permits | 9 | Plumbing · CAP/REMOVE PLUMBING EQUIPMENTS & INSTALL NEW PLUMBING FIXTURES, 2 LAVATORIES AND 2 TOILETS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jul 9, 2026 |
| B | OLD WORLD QUALITY CRAFTSM NYC DOB building permits | 9 | Structural · Change of occupancy from two family into one family. No product keyword matched | 0 | Jul 9, 2026 |
| B | ROSELAND CONSTRUCTION CORP. NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE RESTORATION WORK AND INSPECTION AT 1650 BROADWAY, MANHATTAN, NY 10019 No product keyword matched | 0 | Jul 9, 2026 |
| B | US LEVIN GROUP NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND NEEDLE BEAMS AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 9, 2026 |
| B | WEST LAWRENCE CARE CENTER NYC DOB building permits | 9 | Standpipe · REMOVE HOSES FROM ALL STANDPIPE HOSE VALVES AND INSTALL HOSE CABINETS AS PER 905.3.1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | 636 GRAND STREET LLC NYC DOB building permits | 9 | Mechanical Systems · COMMERCIAL COOKING VENTILATION SYSTEM TO BE UPGRADED. NEW MUA HOOD WITH EXHAUST/MUA DUCTS & EXHAUST/MUA FANS TO BE INSTALLED. FIRESTOPPING WILL NOT BE DISTURBED. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | STAR LIGHT CONSTRUCT LLC NYC DOB building permits | 9 | General Construction · FACADE RENOVATION AND REPAIR AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jul 9, 2026 |
| B | SARADA DONUT, LLC NYC DOB building permits | 9 | Construction Fence · SUBSEQUENT FILING FOR FENCE WORK. INSTALL TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH JOB# Q01255642. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 9, 2026 |
| B | METROPOLITAN PAINTING AND CONTRACTI NYC DOB building permits | 9 | General Construction · FILING HEREWITH PLANS AND APPLICATION FOR INTERIOR RENOVATION LIMITED TO APT#8A CONSISTING OF RENOVATING THE EX. 3 PC BATHROOM. DIRECT REPLACEMENT OF PL FIXTURES. NO STRUCTURAL WORK. ADDITION OF NEW WASHER AND ELECTRIC DRYER. No product keyword matched | 0 | Jul 9, 2026 |
| B | JOSEPH JACKSON NYC DOB building permits | 9 | Boiler Equipment · REMOVE FUEL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 9, 2026 |
| B | MATT WARNE, CHIEF QA NYC DOB building permits | 9 | Structural · SELECTIVE REMOVAL OF EXISTING ELEVATOR SHAFT WALL FOR ACCESS DOOR. INSTALLATION OF PASSENGER ELEVATOR GOBERNOR SWITCH ACCESS DOOR. MINOR STRUCTURAL FRAMING WORK AND INSTALLATION OF ELEVATED METAL GRATING PLATFORM WITH GUARDRAIL AND ACCESIBLE LADDER. No product keyword matched | 0 | Jul 9, 2026 |
| B | arthurkill association NYC DOB building permits | 9 | Mechanical Systems · Direct replacement of (1) 4-Ton HVAC package unit on existing roof curb No product keyword matched | 0 | Jul 9, 2026 |
| B | CREDO RENOVATION INC NYC DOB building permits | 9 | General Construction · Filing for minor interior renovation at apartment#16A. No change in use egress or occupancy. No product keyword matched | 0 | Jul 9, 2026 |
| B | ST LUKES LUTHERAN CHURCH NYC DOB building permits | 9 | Structural · Structural work for temporary installations in the St. Luke Church basement assembly space for Music City TPA. All work will be removed and the area restored after the show concludes. No change of use, egress or occupancy. No product keyword matched | 0 | Jul 9, 2026 |
| B | GIBSON MECH INC NYC DOB building permits | 9 | Mechanical Systems · Installation of two (2) New Split Air-Cooled DX Units (Roof Mounted Condenser units) for Elevator Machine Room (EMR) Cooling. Installation of one (1) Energy Recovery Unit (ERU), Roof Mounted for Base Building Ventilation System. No product keyword matched | 0 | Jul 9, 2026 |
| B | FIELDWAY GROUP INC NYC DOB building permits | 9 | Curb Cut · 18' CURB CUT 278' FROM ASCOT AVENUE No product keyword matched | 0 | Jul 9, 2026 |