Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | GRAND STAIRS CORP NYC DOB building permits | 9 | Plumbing · REMOVE EXISTING PLUMBING AND INSTALL NEW PLUMBING FIXTURES, NEW GAS APPLIANCES/EQUIPMENT AND RELATED PIPING. No product keyword matched | 0 | Jul 20, 2026 |
| B | House Number 96, LLC NYC DOB building permits |
| 9 |
Protection and Mechanical Methods · INSTALLATION OF SCAFFOLD AND NETTING AS ALTERNATIVE METHODS OF PROTECTION FOR THE REAR FACADE WORK No product keyword matched |
| 0 |
| Jul 20, 2026 |
| B | Lawrence H. Woodward Funeral Home NYC DOB building permits | 9 | Mechanical Systems · APPLICATION FILED TO REPLACE EXISTING 7 TON ROOFTOP HVAC UNIT, NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 20, 2026 |
| B | Lobue Housing Corporation NYC DOB building permits | 9 | General Construction · REPLACE EXISTING EXTERIOR FINISH AND WINDOWS AT EXP #1 & 2 TO RESOLVE ECB VIOLATION #39186161M. REPAIR EXIST. FRONT EXTERIOR TRAP DOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | J AND G CONSTRUCTION SERVICES INC NYC DOB building permits | 9 | General Construction · SPOT POINTING AND WINDOW LINTEL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 0 | Jul 20, 2026 |
| B | BRIGHT ELECTRIC CORP Austin issued construction permits, NYC DOB electrical permits | 9 | Electrical Permit · Provide electrical service for shell space 200amp 3 phase 120/208v service
Electrical service is for BLDG J Suite 150 No product keyword matched | 0 | Jul 20, 2026 |
| B | MENNELLA ELECTRIC, INC. NYC DOB electrical permits | 9 | NEW 200 AMP SERVICE No product keyword matched | 0 | Jul 20, 2026 |
| B | ROME ELECTRICAL CONTS INC NYC DOB electrical permits | 9 | Ugrade service meter and panel from 100 amp single phase to 200 amp service single phase. No product keyword matched | 0 | Jul 18, 2026 |
| B | A PLUS 1 MANAGEMENT INC NYC DOB building permits | 9 | Mechanical Systems · New Split system for heating cooling and ventilation system in conjunction with GC #B00980957-I1 No product keyword matched | 0 | Jul 17, 2026 |
| B | AYCEE CONSTRUCTION GROUP NYC DOB building permits | 9 | General Construction · APPLICATION FILE FOR INTERIOR RENOVATION WORK INSIDE THE APARTMENT 3FN ON 3RD FLOOR AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 17, 2026 |
| B | LIN SING ASSOCIATION NYC DOB building permits | 9 | Plumbing · File plumbing work type to obtain the correct plumbing signoff for Job #103525990 by adding the cap and removing kitchen fixtures from Schedule B, as per the Plumbing Chiefs comment, in order to obtain final signoff for the Final CO. No change in use, occ No product keyword matched | 0 | Jul 17, 2026 |
| B | Phoenix Realty Group, LLC NYC DOB building permits | 9 | Structural · INTERIOR RENOVATION FOR EXISTING RETAIL STORE UG. 6 INCLUDING REPAIR OF FLOOR, WALL, CEILING PAINTED, INSTALL COMMERCIAL KITCHEN, NEW S.S HOOD AND DUCT, PLUMBING WORK TO BE FILLING SEPARATED, AS PER PLANS. NO CHANGE USE AGREES OR OCCUPA No product keyword matched | 0 | Jul 17, 2026 |
| B | UNIQUE DEVELOPERS CORP NYC DOB building permits | 9 | Mechanical Systems · Mechanical work type hereby filed in conjunction with the NB application: 321925333 No product keyword matched | 0 | Jul 17, 2026 |
| B | SHAMCO MANAGEMENT NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 17, 2026 |
| B | BROWN HARVARD ESTATE LLC NYC DOB building permits | 9 | General Construction · HEREWITH FILE PLANS FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. WORK WILL INVOLVE GENERAL CONSTRUCTION FOR MINOR INTERIOR PARTITIONS, REPLACE CEILING AND FLOOR AND NEW FINISHES THROUGHOUT. NO CAHNGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 17, 2026 |
| B | OCS BUILDERS GROUP LLC NYC DOB building permits | 9 | General Construction · interior renovation to existing CVS Pharmacy to replace finishes (floor, wall, ceiling) Modify and relocate checkout and photo counters. Modify retail fixtures layout, replace and relocate lights, No change to egress, exits, occupancy or use. No product keyword matched | 0 | Jul 17, 2026 |
| B | BLUFIN MANAGEMENT NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT (MATERIAL HOIST - COUNTERWEIGHTED SYSTEM). NO CHANGES IN THE EGRESS. No product keyword matched | 0 | Jul 17, 2026 |
| B | CONSOLITADED EDISON CO OF NY NYC DOB building permits | 9 | Earth Work · Stabilization of demolished building pad. No product keyword matched | 0 | Jul 17, 2026 |
| B | TATRAS CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · COMBINE APTS. 4B/4C PER TPPN 3/97, DEMO OF NON-LOAD BEARING INTERIOR PARTITIONS, INTERIOR DOORS, JAMBS, & TRIM,CABINETRY & APPLIANCES; NEW INTERIOR PARTITIONS & FINISHES,WOOD & TILE FLOORING CEILINGS & SOFFITS INTERIOR DOORS, JAMBS, & TRIM. No product keyword matched | 0 | Jul 17, 2026 |
| B | D'ONOFRIO GENERAL CONTRAC NYC DOB building permits | 9 | General Construction · Con Edison's 59th Street Station - SWARMP (GC work type) Facade Repairs. ......PAA - The asbestos documentation originally required for this application (V5) has changed, (An ACP-5 will be generated instead) Reason will appear in comments section No product keyword matched | 0 | Jul 17, 2026 |
| B | GENESIS BUILDERS CONSORTIUM, INC. NYC DOB building permits | 9 | General Construction · CONVERT 1ST FLOOR TO COMMERCIAL-SALES-WAREHOUSE, CONVERT 2ND FLOOR TO ACCESSORY OFFICE AND RENOVATE CELLAR. PARTITON WORK AS PER PLAN. No product keyword matched | 0 | Jul 17, 2026 |
| B | WILLIAM G IAFE INC NYC DOB building permits | 9 | Plumbing · LEGALIZATION OF MINOR PLUMBING AND GAS RELOCATIONS No product keyword matched | 0 | Jul 17, 2026 |
| B | Blue Skies 242, LLC. NYC DOB building permits | 9 | Sprinklers · Sprinkler work in conjunction with interior GC DOB NOW application M01257038-I1 No product keyword matched | 0 | Jul 17, 2026 |
| B | BRITT REALTY LLC NYC DOB building permits | 9 | General Construction · FILING FOR 12 STORY MIXED USE NEW BUILDING. ZONING LOT CONSIST OF 2 TAX LOTS 32 AND 35. No product keyword matched | 0 | Jul 17, 2026 |
| B | PERRY MECHANICAL CONTRACT NYC DOB building permits | 9 | Mechanical Systems · Replacement of air conditioning unit. No change in use egress and occupancy. No product keyword matched | 0 | Jul 17, 2026 |
| B | C. JAMES PLBG & HTG INC NYC DOB building permits | 9 | Plumbing · FILING TO LEGALIZE EXIST. TOILET, LAV, AND UTILITY SINK AT BASEMENT. REMOVAL OF EXIST. SHOWER STALL. FILING IN CONJUNCTION WITH JOB #X01383017-I1 No product keyword matched | 0 | Jul 17, 2026 |
| B | ZICKLIN CONTRACTING CORP NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF APT 3A, NO CHANGE OF USE EGRESS OR OCCUPANCY No product keyword matched | 0 | Jul 17, 2026 |
| B | PLINIO DESIGN CORP NYC DOB building permits | 9 | General Construction · RENOVATION OF EXISTING 1-CAR GARAGE No product keyword matched | 0 | Jul 17, 2026 |
| B | KAMIN REALTY COMPANY NYC DOB building permits | 9 | Mechanical Systems · Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Jul 17, 2026 |
| B | FRESH MEADOW POWER-NE LLC NYC DOB building permits | 9 | Mechanical Systems · Uninsulated PVC pipe to be replace with new CPVC. No changes to the use, occupancy or egress of the building under this application. No product keyword matched | 0 | Jul 17, 2026 |
| B | WKS INC NYC DOB building permits | 9 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 17, 2026 |
| B | NYC REFRIGERATION MECHANI NYC DOB building permits | 9 | Mechanical Systems · REMOVAL AND INSTALLATION OF NEW VRF CONDENSING UNIT, AND INSTALLATION OF NEW REFRIGERATION SYSTEM. No product keyword matched | 0 | Jul 17, 2026 |
| B | DITMAS CENTER INC. NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUAPCNY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C No product keyword matched | 0 | Jul 17, 2026 |
| B | OSMANI NYC INC NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS No product keyword matched | 0 | Jul 17, 2026 |
| B | DP FLYNN PLBG & HTG INC NYC DOB building permits | 9 | Plumbing · interior renovation of residential unit on the 6th floor. no change to use, occupancy, or egress. No product keyword matched | 0 | Jul 17, 2026 |
| B | YORKE CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · INTERIOR AND EXTERIOR RENOVATIONS ON FLOORS 01-03, FAC & ROF FOR NEW THEATRICAL STUDIO & OFFICES. HORIZONTAL EXTENSION AT 1ST FLOOR. VERTICAL EXTENSION AT 3RD FLOOR. No product keyword matched | 0 | Jul 17, 2026 |
| B | EXPEDITE DEM INC NYC DOB building permits | 9 | Construction Fence · installation of construction fence to protect site. No product keyword matched | 0 | Jul 17, 2026 |
| B | ZR UNIVERSAL CONSTRUCTION NYC DOB building permits | 9 | General Construction · Propose front facade work (new stucco) in existing 2 family dwelling. No product keyword matched | 0 | Jul 17, 2026 |
| B | Bayrock Asset Managment LLC NYC DOB building permits | 9 | Plumbing · Installation of new plumbing fixtures on new and existing roughing. No change in use, occupancy or egress. No product keyword matched | 0 | Jul 17, 2026 |
| B | CASE PLUMBING LLC NYC DOB building permits | 9 | Sprinklers · Application filed for 5 relocated sprinkler heads to an existing sprinkler system. No change to use, egress or occupancy. No product keyword matched | 0 | Jul 17, 2026 |
| B | Xin Tai Delaware 888 LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION TO REMOVE MECHANICAL DUCT, DROP CEILING, AND INTERIOR NON-BEARING PARTITIONS IN ORDER TO CORRECT ECB VIOLATION #39185906N. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 17, 2026 |
| B | PISTILLI CONSTRUCTION & DEVELOPMENT NYC DOB building permits | 9 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jul 17, 2026 |
| B | 66-03 MYRTLE LLC NYC DOB building permits | 9 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01420744 No product keyword matched | 0 | Jul 17, 2026 |
| B | 19 W 44 Owner LLC NYC DOB building permits | 9 | General Construction · Non bearing partitions and finishes removal on 6th fl. No change in use, egress or occupancy No product keyword matched | 0 | Jul 17, 2026 |
| B | 55 WEST HOUSE LLC NYC DOB building permits | 9 | Plumbing · TO PROPOSE PLUMBING WORK OF EXISTING COMMERCIAL SPACE ON 002 FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 17, 2026 |
| B | DT REALTY EQUITIES LLC NYC DOB building permits | 9 | General Construction · Vertical extension extension (accessory use) for existing 1 story manufacturing facility. No change in occupancy or use. No product keyword matched | 0 | Jul 17, 2026 |
| B | HOTEL 99 NYC DOB building permits | 9 | Sprinklers · installation of plumbing fixtures and associated piping, installation of spk heads and branch lines No product keyword matched | 0 | Jul 17, 2026 |
| B | 336 E 86 LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jul 17, 2026 |
| B | QUEENS CROSSROADS LLC NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 17, 2026 |
| B | PATRICIA PETTWAY-BROWN NYC DOB building permits | 9 | Mechanical Systems · NSTALL NEW DRYER EXHAUST AS PER PLANS. No product keyword matched | 0 | Jul 17, 2026 |