Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CONGREGATION BETH TORAH NYC DOB building permits | 9 | Construction Fence · INSTALL CONSTRUCTION FENCE AS PER PLANS No product keyword matched | 0 | Jul 20, 2026 |
| B | GDC CONTRACTING LLC NYC DOB building permits | 9 |
| 0 |
| Jul 20, 2026 |
| B | 3 BROS WOOD WORKS CORP NYC DOB building permits | 9 | Mechanical Systems · MINOR INTERIOR RENOVATION TO THE EXISTING FIRST FLOOR COMMERCIAL SPACE AS PER PLAN INCLUDING NEW COMMERCIAL EXHAUST HOOD AND VENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | JLJ, LLC NYC DOB building permits | 9 | General Construction · ALT CO FILED FOR CHANGE OF USE ON ROOF TO A RECREATION SPACE AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jul 20, 2026 |
| B | ALGOL GROUP INC NYC DOB building permits | 9 | General Construction · removal of non-bearing part, add new non bearing partitions in the living rm, kit & master bedroom. also, mod. to ceiling, wall & flooring. minor duct work and to add humidifier. pl to be filed under separ. app. - apt. 88. no change in use, egress or occ. No product keyword matched | 0 | Jul 20, 2026 |
| B | DYKER ONE LLC NYC DOB building permits | 9 | Earth Work · Construction of new 6-story building, including concrete columns, beams, and foundations. No product keyword matched | 0 | Jul 20, 2026 |
| B | CAPITOL DESIGN & MAINT IN NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY HANGING SIGN - IN PROPERTY LINES - ZARA. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | THE SCI CONSTRUCTION NYC DOB building permits | 9 | General Construction · Installation of Temporary Stage for TPA event. Project to be closed out upon removal No product keyword matched | 0 | Jul 20, 2026 |
| B | MARPAT CONSTRUCTION CORP NYC DOB building permits | 9 | Structural · STRUCTURAL FILING IN CONJUNCTTION WITH ALT-1 321775888. No product keyword matched | 0 | Jul 20, 2026 |
| B | 9E9 LLC NYC DOB building permits | 9 | Construction Fence · INSTALLATION AND USE OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | JABER REALTY CORP. NYC DOB building permits | 9 | Support of Excavation · Support of excavation drawings for the installation of the new foundation system for the rear extension No product keyword matched | 0 | Jul 20, 2026 |
| B | MD CONSTRUCTION NY INC NYC DOB building permits | 9 | General Construction · HEREWITH FILE TO CONVERT 3-FAMILY HOUSE TO 2-FAMILY HOUSE. WORK INCLUDES NEW NON-LOAD BEARING WALL, MODIFY PLUMBING FIXTURES, NEW PAINT, REFINISH FLOORING, AND GENERAL CONSTRUCTION. No product keyword matched | 0 | Jul 20, 2026 |
| B | QUEST HOME IMPROVEMENT IN NYC DOB building permits | 9 | Solar · Installation of 17.60 kW rooftop mounted solar system and inverter No product keyword matched | 0 | Jul 20, 2026 |
| B | AL DIBIASI BUILDERS LLC NYC DOB building permits | 9 | Structural · NEW STAIR AND CONVERSION OF EXISTING ATTIC INTO 3RD FLOOR; No product keyword matched | 0 | Jul 20, 2026 |
| B | The 50 West 66th Street Condominium NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION WORK TO RENOVATE APARTMENT 7CD ON THE 6TH FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | 6 E 32 FEE OWNERS LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. No product keyword matched | 0 | Jul 20, 2026 |
| B | 1651 SUMMERFIELD INC. NYC DOB building permits | 9 | Plumbing · CAP AND REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS. FILING IN CONJUNCTION WITH DOB NOW #Q01174770-I1. No product keyword matched | 0 | Jul 20, 2026 |
| B | SLA CONTRACTORS LLC NYC DOB building permits | 9 | Construction Fence · Filing for construction fence. No product keyword matched | 0 | Jul 20, 2026 |
| B | THOMAS M RANERI NYC DOB building permits | 9 | Structural · PROPOSED 2-STORY, 2 FAMILY DWELLING SEMI-DETACHED BUILDING No product keyword matched | 0 | Jul 20, 2026 |
| B | AQOZFI INWOOD LLC NYC DOB building permits | 9 | General Construction · Application filed to install decorative fins to exterior of building. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 20, 2026 |
| B | NORTHEAST PLBG & HTG CORP NYC DOB building permits | 9 | Plumbing · Herewith filing for the removal and installation of plumbing fixtures, and related piping. No product keyword matched | 0 | Jul 20, 2026 |
| B | 230 SARATOGA REALTY LLC NYC DOB building permits | 9 | Sprinklers · MODIFICATION OF AN EXISTING SPRINKLER SYSTEM ON THE FIRST FLOOR AT WELLS FARGO RETAIL BRANCH AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. No product keyword matched | 0 | Jul 20, 2026 |
| B | FORDHAM PREPARATORY SCHOOL NYC DOB building permits | 9 | Mechanical Systems · Interior renovation of the locker room is associated with the Mechanical work scope. The proposed work includes the removal and installation of the duct to the existing mechanical system. No change in use, egress, or occupancy. No product keyword matched | 0 | Jul 20, 2026 |
| B | AMERICAN RED CROSS NYC DOB building permits | 9 | Structural · Structural modifications as per plans filed herewith. NO change in use, egress or occupancy. No product keyword matched | 0 | Jul 20, 2026 |
| B | AVIEW EQUITIES NYC DOB building permits | 9 | Plumbing · PROPOSED TO CAP AND REMOVE SPRINKLER SYSTEM. NO CHANGE TO USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Jul 20, 2026 |
| B | 718-484-7861 NYC DOB building permits | 9 | Mechanical Systems · EXISTING TWO-FAMILY HOUSE WITH MECHANICAL WORK AT CELLAR, BASEMENT,1 ST AND 2ND FLOOR UNDER THIS APPLICATION. JOB FILED TORELATED TO ALT2 APPLICATION # B01401035-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THISAPPLICATION. No product keyword matched | 0 | Jul 20, 2026 |
| B | Verv Capital NYC DOB building permits | 9 | Plumbing · INSTALL NEW DISTRIBUTION OF DOMESTIC AND SANITARY PIPING THROUGHOUT THE SPACE TO TIE-INTO EXISTING PIPING WITH NEW PLUMBING FIXTURES. NO CHANGE TO OCCUPANY, USE, OR EGRESS UNDER THIS APPLICATION No product keyword matched | 0 | Jul 20, 2026 |
| B | Urban Foundation Engineering LLC NYC DOB building permits | 9 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 20, 2026 |
| B | CROPSEY PARTNERS LLC NYC DOB building permits | 9 | Sprinklers · MODIFICATION OF EXISTING SPRINKLER SYSTEM PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 20, 2026 |
| B | GREAT ARK CONSTRUCTION CO NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION TO APARTMENT 3F. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | DOUBLETREE BY HILTON HOTEL NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 0 | Jul 20, 2026 |
| B | BH BX YH LLC NYC DOB building permits | 9 | General Construction · Job filed remove safer and the counter partition wall, HVAC unit and ducts in the first floor; to resolve ECB violation# 35721602P. No product keyword matched | 0 | Jul 20, 2026 |
| B | 25 St Felix EAT LLC NYC DOB building permits | 9 | General Construction · Proposed renovation of the existing SRO building into a 2-Family Building as per the plan. Obtain new C of O. No product keyword matched | 0 | Jul 20, 2026 |
| B | BALATON CONSULTING LLC NYC DOB building permits | 9 | Suspended Scaffold · Suspended Scaffold installation for facade repairs and inspections as per plans filed herewith. No product keyword matched | 0 | Jul 20, 2026 |
| B | INTERIOR FINISHES INC NYC DOB building permits | 9 | General Construction · HEREWITH FILE PLANS TO RE NOVATE APARTMENT 317, GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT, REPLACEMENT OF APPLIANCES. PL TO BE FILED AS SUB DOC S1 No product keyword matched | 0 | Jul 20, 2026 |
| B | DUO PLBG. & HTG. CORP NYC DOB building permits | 9 | Sprinklers · INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM. No product keyword matched | 0 | Jul 20, 2026 |
| B | MCMANUS MECHANICAL MAINTA NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION ON EXISTING 17TH FLOOR SPACE. NO CHANGE TO USE,, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 20, 2026 |
| B | HOTEL PLAZA ATHENEE-NATIONAL NYC DOB building permits | 9 | Suspended Scaffold · IRA to assist with Condition Assessment . No product keyword matched | 0 | Jul 20, 2026 |
| B | U-Control Energy Solutions NYC DOB building permits | 9 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 0 | Jul 20, 2026 |
| B | Pendry Manhattan West Hotel NYC DOB building permits | 9 | Mechanical Systems · FILING HEREWITH FOR INSTALLATION OF NEW POLLUTION CONTROL UNIT AND FAN, NFPA-96 COMPLIANT UTILITY SET GREASE EXHAUST FAN AND SMOG HOG PRECIPITATOR UNIT ON 2ND FLOOR AND RELATED DUCTWORK ON 1ST FLOOR No product keyword matched | 0 | Jul 20, 2026 |
| B | ROYAL CP HOTEL HOLDINGS, L.P. NYC DOB building permits | 9 | Construction Fence · TO INSTALL FENCE IN CONJUNCTION WITH NB APPLICATION #Q00555969. No product keyword matched | 0 | Jul 20, 2026 |
| B | TX CONSTRUCTIONS INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION AND EXTEND THE LIVING AREA AT 2ND FLOOR WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HERE. TO TAKE OVER OLD JOB#421061362, AND REMOVE VIOLATION#35291991K,#37011636J. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 20, 2026 |
| B | SABOOR WAIZUN MANAGEMENT LLC NYC DOB building permits | 9 | Plumbing · APPLICATION FILED FOR PLUMBING WORK TYPE IN CONJUNCTION WITH BIS APPLICATION# 440651162 No product keyword matched | 0 | Jul 20, 2026 |
| B | DAVE RESTORATION INC NYC DOB building permits | 9 | Earth Work · NEW ONE-CAR GARAGE No product keyword matched | 0 | Jul 20, 2026 |
| B | RIFT CONSTRUCTION NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF AN EXISTING ONE BEDROOM ONE BATH UNIT. WORK TO INCLUDE INTERIOR DEMOLITION, INSTALLATION OF NEW INTERIOR PARTITIONS, NEW FLORING OVER EXISTING FLOORING, AND NEW FINISHES AND NEW LIGHTING FIXTURES. NO CHANGE TO EXISTING HVAC SYSTEM, No product keyword matched | 0 | Jul 20, 2026 |
| B | DELEX BUILDING LLC NYC DOB building permits | 9 | Full Demolition · PROPOSED FULL DEMOLITION OF A 2 1/2 STORY 1-FAMILY FRAME BUILDING WITH CELLAR. No product keyword matched | 0 | Jul 20, 2026 |
| B | NORTHSTAR CONTRACTING COR NYC DOB building permits | 9 | Structural · REMOVAL OF EXISTING INTERIOR PARTITION WALLS ON THE CELLAR AND 1ST FLOOR. No product keyword matched | 0 | Jul 20, 2026 |
| B | KELLETS ANHORED HOME IMPROVEMENT LL NYC DOB building permits | 9 | Solar · INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION No product keyword matched | 0 | Jul 20, 2026 |
| B | SOL DEVELOPMENT & CONSTURCTION CORP NYC DOB building permits | 9 | Mechanical Systems · FILING FOR INSTALLATION OF MECHANICAL HOOD FOR THE EXISTING FIRST FLOOR FLOOR CORNER STORE. IN CONJUNCTION WITH APPLICATION # 440658058. No product keyword matched | 0 | Jul 20, 2026 |
| B | BROOKLYN HOME ASSOCIATES LLC NYC DOB building permits | 9 | General Construction · Herewith File Alteration To Restore Legal Condition To An Existing Two Story One Family Dwelling. To Address Violation Numbers 34422885h; 34458247h; 34422885h; 34457332h; 34842939p ; 34841664k And 34457331x. To Remove Plumbing Fixtures And To Obtain LOC. No product keyword matched | 0 | Jul 20, 2026 |