Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | BARBERRY ROSE MANAGEMENT CO. INC. NYC DOB building permits | 9 | Foundation · Removal of existing ground floor slab on grade; design of new concrete slab supported on new piles at existing ground floor No product keyword matched | 0 | Jul 27, 2026 |
| B | UNITED PRO CONSTRUCTION C |
| 9 |
Construction Fence · Construction 8 foot high plywood along the property line during the proposed construction job # B01278137-1 No product keyword matched |
| 0 |
| Jul 27, 2026 |
| B | AXEA CONSTR GROUP LLC NYC DOB building permits | 9 | General Construction · Interior and exterior architectural work to renovate and enlarge the existing two-and-a-half-story detached house and convert it into a two-family home. Obtain a new certificate of occupancy. No product keyword matched | 0 | Jul 27, 2026 |
| B | 25 BROAD L/CAL LLC NYC DOB building permits | 9 | General Construction · HEREWITH FILING For the repair and replacement of floors as needed, replacement of counter tops, cabinets and appliances. repair replace tile and painting as per plans filed herewith. No product keyword matched | 0 | Jul 27, 2026 |
| B | CERTIFIED CONTRACTING INC NYC DOB building permits | 9 | Suspended Scaffold · Suspended scaffold installation for facade repointing No product keyword matched | 0 | Jul 27, 2026 |
| B | DBC INTERIOR INC NYC DOB building permits | 9 | General Construction · Interior renovation of APT 319. Upgrade bathroom, remove kitchen and combine APT 301. No change in use, egress and occupancy No product keyword matched | 0 | Jul 27, 2026 |
| B | TORRES APTS HDFC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF KITCHEN/BATHR FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR MASONRY & FACADE WORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP. No product keyword matched | 0 | Jul 27, 2026 |
| B | 5 POINTS REHAB LLC NYC DOB building permits | 9 | General Construction · BSC--INTERIOR DEMOLITION FOR RETAIL SPACE PRE-TENANT WHITE BOX AS PER PLANS. No product keyword matched | 0 | Jul 27, 2026 |
| B | CORLATON REALTY INC. NYC DOB building permits | 9 | Mechanical Systems · Remove 1 existing HVAC and associated ductwork. Install 3 split heat pump units as per plans. No change in egress, occupancy or use is involved under this application. No product keyword matched | 0 | Jul 27, 2026 |
| B | AMERICAN PAINTING GROUP NYC DOB building permits | 9 | Structural · FILING TO OBTAIN APPROVAL FOR A PROPOSED RETAINING WALL REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. ADDRESSING VIOLATION #39108480X No product keyword matched | 0 | Jul 27, 2026 |
| B | E8 NYC HOLDINGS LLC NYC DOB building permits | 9 | Structural · Structural scope of work for new proposed 5 story mix-used building with basement & cellar filed in conjunction with job# 121205739. No product keyword matched | 0 | Jul 27, 2026 |
| B | VERDOSO INC. NYC DOB building permits | 9 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 0 | Jul 27, 2026 |
| B | IDEAL ROOFING & SHEET NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work and/or inspection. Amend #1, change tieback to wrap around and removed anchor plate details. No anchors to be use or pull test to be performed No product keyword matched | 0 | Jul 27, 2026 |
| B | DR 18 CAPITAL LLC NYC DOB building permits | 9 | General Construction · Change of use from A 6 to A 2 family. No product keyword matched | 0 | Jul 27, 2026 |
| B | 7611 5TH AVENUE, LLC NYC DOB building permits | 9 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 27, 2026 |
| B | ARCO CONSTRUCTION COMPANY INC NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 37-30 74TH STREET, QUEENS, FOR FACADE RESTORATION WORK. No product keyword matched | 0 | Jul 27, 2026 |
| B | ORTIZ NYC DOB building permits | 9 | Plumbing · HEREWITH TO PROPOSE PL SYSTEMS, INCONJUNCTION WITH DOB# Q00570444-I1 No product keyword matched | 0 | Jul 27, 2026 |
| B | RP 81 MERCER, LLC NYC DOB building permits | 9 | General Construction · APPLICATION HEREWITH FILED FOR INTERIOR TENANT BUILD OUT OF WHITE BOX SPACE RELATED TO X00924038-I1. NO CHANGE TO EXISTING LIGHTING PROPOSED. NO CHANGE IN OCCUPANCY, USE, EGREES OR BULK. No product keyword matched | 0 | Jul 27, 2026 |
| B | Beechwood Hutch 1620 LLC NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND CONSTRUCTION FENCE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 27, 2026 |
| B | SAS CONTRACTING CO, INC NYC DOB building permits | 9 | General Construction · FILING FOR RENOVATION AND REMOVE BATHROOM& KITCHEN FACILITY FROM CELLAR.BRING BACK AS ORIGINAL. RESOLVE VIOLATIONS 34900629M,34747192K. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jul 27, 2026 |
| B | 180-08 Hillside Realty Corp. NYC DOB building permits | 9 | Plumbing · PLUMBING WORK FOR NEW CAFETERIA. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 27, 2026 |
| B | JOHNSON NYC DOB building permits | 9 | Plumbing · Plumbing modifications for the proposed office renovation as per approved plans. Not change and egress occupancy No product keyword matched | 0 | Jul 27, 2026 |
| B | WORKFORCE CONTRACTING INC NYC DOB building permits | 9 | Plumbing · Replace existing gas and plumbing fixtures on cellar and first floor level & install new plumbing fixtures on cellar, first and second floor level as per drawings. No product keyword matched | 0 | Jul 27, 2026 |
| B | 97 Devoe LLC NYC DOB building permits | 9 | Full Demolition · Full hand demolition of a 2 story and cellar frame structure No product keyword matched | 0 | Jul 27, 2026 |
| B | MAGEN DAVID YESHIVAH NYC DOB building permits | 9 | Boiler Equipment · REPLACE (4) GAS FIRED BOILERS. No product keyword matched | 0 | Jul 27, 2026 |
| B | MAMA ROSA RESTAURANT NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MAMA ROSA. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 27, 2026 |
| B | BURKE APARTMENTS HDFC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EX. BUILDING, NEW FINISHES & REPLACEMENT OF WIND/DOORS. ROOF/BULKHEAD/PARAPET WORK. REPLACEMENT OF KITCHEN/BATHR FIXTURES. NEW LED INT/ EXT LIGHTING. MINOR MASONRY & FACADE WORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APP. No product keyword matched | 0 | Jul 27, 2026 |
| B | Christ Fellowship Baptist Church NYC DOB building permits | 9 | General Construction · Filing for interior renovation of existing 3rd floor, erection of non-load bearing walls. Registration of existing hvac unit, all as per previously approved DOB drawings #302041859. No change in use, egress or occupancy. All as per plans and applications. No product keyword matched | 0 | Jul 27, 2026 |
| B | SUMMIT HEALTH MANAGEMENT LLC NYC DOB building permits | 9 | Mechanical Systems · REQUEST FOR EMERGENCY WORK PERMIT FOR NEW VARIABLE REFRIGERANT FLOW HEAT RECOVERY SYSTEM. 20 TON TOTAL CAPACITY FOR EXISTING MEDICAL FACILITY. AS PER PLANS HEREWITH SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 27, 2026 |
| B | EB GOURMET & DELI NYC DOB building permits | 9 | Mechanical Systems · MINOR INTERIOR RENOVATION TO THE EXISTING FIRST FLOOR COMMERCIAL SPACE (DELI) AS PER PLAN, INCLUDING THE REPLACEMENT OF MECHANICAL HOOD AND DUCT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 27, 2026 |
| B | Locon Realty Corp NYC DOB building permits | 9 | Plumbing · INSTALLATION OF PLUMBING FIXTURES FOR EXISTING EATING AND DRINKING ESTABLISHMENT No product keyword matched | 0 | Jul 27, 2026 |
| B | The Wall Street Hotel NYC DOB building permits | 9 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 0 | Jul 27, 2026 |
| B | COASTAL WATERPROOFING LLC NYC DOB building permits | 9 | General Construction · Facade repairs as per plans filed herewith. No product keyword matched | 0 | Jul 27, 2026 |
| B | MORRIS PARK AVE LLC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - INVERSARX PHARMACY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 27, 2026 |
| B | I.B.C. CONTRACTING CORP NYC DOB building permits | 9 | General Construction · Interior renovation of Apt 4D on the 4th floor. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 27, 2026 |
| B | LOPRINZI GROUP LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALL NEW SPLIT HEAT PUMP SYSTEM. No product keyword matched | 0 | Jul 27, 2026 |
| B | COMMUNITY HEALTH ACTION OF STATE IS NYC DOB building permits | 9 | Mechanical Systems · Direct replacement of (2) 4-ton compressor condenser units on grade. No product keyword matched | 0 | Jul 27, 2026 |
| B | 8th Avenue Medical Office NYC DOB building permits | 9 | General Construction · PROPOSE ACCESSORY AWNING AS PER PLAN. FILED TO ADDRESS ECB VIOLATIONS 39188166K, NO CHANGE IN USE, EGRESS, AND OCCUPANCY No product keyword matched | 0 | Jul 27, 2026 |
| B | THE EXPANSION GROUP INC NYC DOB building permits | 9 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 0 | Jul 27, 2026 |
| B | SAIFUL ISLAM NYC DOB building permits | 9 | Construction Fence · INSTALL A TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILE TO ADDRESS ECB VIO#39175677J. No product keyword matched | 0 | Jul 27, 2026 |
| B | ANTISS CONSTRUCTION CORP NYC DOB building permits | 9 | Construction Fence · Install construction fence. No product keyword matched | 0 | Jul 27, 2026 |
| B | OCEANHILL III LLC NYC DOB building permits | 9 | General Construction · Cosmetic replacement of existing outdoor playground at rear yard with new permeable pavement in-kind per plan. No change in rear yard size, site drainage, use, occupancy, or egress No product keyword matched | 0 | Jul 27, 2026 |
| B | STRUCTURETECH NEW YORK IN NYC DOB building permits | 9 | Protection and Mechanical Methods · CONTAINMENT NETTING TO BE INSTALLED AS A MEANS OF PROTECTION TO THE PUBLIC IN ACCORDANCE WITHDOB 2013-006 BULLETIN SECTION I No product keyword matched | 0 | Jul 27, 2026 |
| B | Sun River Health NYC DOB building permits | 9 | General Construction · INSTALLATION OF AN AWNING OVER THE ENTRANCE. NO CHANGE IN USE OR OCCUPANCY No product keyword matched | 0 | Jul 27, 2026 |
| B | DOWIS LLC NYC DOB building permits | 9 | General Construction · HEREBY FILING VERTICAL ENLARGEMENT. No product keyword matched | 0 | Jul 27, 2026 |
| B | Eugene Properties LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION @ ADJACENT PROPERTY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. No product keyword matched | 0 | Jul 27, 2026 |
| B | DENTAL ARTS NYC DOB building permits | 9 | General Construction · CHANGE OF OCCUPANCY AT THE FIRST FLOOR, PARTITION WORK AS PER PLANS No product keyword matched | 0 | Jul 27, 2026 |
| B | Ootzil Deli Grocery NYC DOB building permits | 9 | Mechanical Systems · ALTERATION TYPE 2 APPLICATION FILED FOR INSTALLATION COMMERCIAL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 27, 2026 |
| B | J & T GENERAL CORP NYC DOB electrical permits | 9 | MINOR WORK No product keyword matched | 0 | Jul 27, 2026 |
| B | PACIFIC ELEC'L CONTR'G IN NYC DOB electrical permits | 9 | TEMPORARY PANEL No product keyword matched | 0 | Jul 27, 2026 |