Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CIAMPA NYC DOB building permits | 9 | General Construction · First floor tenant application to amend existing FINAL CO # 400789269 from ground floor office to custodial care use with place of assembly filed separately. Minor removals of interior non load bearing partitions No product keyword matched | 0 | Jul 29, 2026 |
| B |
| 9 |
Plumbing · INSTALL ONE NEW GAS FIRED HOT WATER HEATER AND ONE GAS FIRED BOILER IN BOILER ROOM AT CELLAR No product keyword matched |
| 0 |
| Jul 29, 2026 |
| B | Empire Group I Inc. NYC DOB building permits | 9 | General Construction · Repair of exterior wall and create openings on exposure 2 and 3 to correct ECB violations #39182097Z & 39182098K. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 29, 2026 |
| B | 325 THIRD STREET, LLC NYC DOB building permits | 9 | Plumbing · PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION APPLICATION FOR REPAIRING EXISTING FIRE-DAMAGED AREAS IN EXISTING RESIDENTIAL BLDG. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | S & T CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · FILING APPLICATION FOR COMBINATION OF APARTMENT 4F/4G. WORK INCLUDES INTERIOR RENOVATIONS OF 4F KITCHEN AND BATHROOM ONLY, REPLACING PLUMBING FIXTURES, APPLIANCES, AND CABINETRY, AND FLOORING WORK THROUGHOUT UNIT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | H2 CONSULTING PE PC NYC DOB building permits | 9 | Solar · Installation of 8.8 kW solar energy system on roof. No change of occupancy, use or egress. No product keyword matched | 0 | Jul 29, 2026 |
| B | TOWERS ON THE PARK CONDOMINIUM NYC DOB building permits | 9 | General Construction · Limited Facade Repairs. No change in use, occupancy, or egress No product keyword matched | 0 | Jul 29, 2026 |
| B | APF properties LLC NYC DOB building permits | 9 | General Construction · PROPOSED INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | Woodside Concrete & General Constru NYC DOB building permits | 9 | General Construction · APPLICATION FILE TO INTERIOR RENOVATION AS MINOR SHEETROCK FOR REMODELING BATHROOM & OPEN PORCH AT 1ST FLOOR, INSTALL ONE (1) MASONRY STAIR & CELLAR EXIT DOOR AT REAR SIDE OF THE BUILDING AS PER PLAN. REMOVE VIOLATION#39169294L. PLUMBING WORK UNDER SE No product keyword matched | 0 | Jul 29, 2026 |
| B | 468 40th LLC NYC DOB building permits | 9 | General Construction · FILING HEREWITH ALT CO APPLICATION TO CREATE TW0 (2) DUPLEX APARTMENTS AND MOVE THE REAR ENTRANCES. No product keyword matched | 0 | Jul 29, 2026 |
| B | GMC PARKING NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Jul 29, 2026 |
| B | BHAGHIANA GENERAL CONSTRUCTION INC NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR ROOFING REPLACEMENT & INSPECTIONS. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 29, 2026 |
| B | DLM Partners LLC NYC DOB building permits | 9 | Foundation · Renovation of an existing townhouse to perform repairs, Installation of new rear deck. No product keyword matched | 0 | Jul 29, 2026 |
| B | MWD Partners LLC NYC DOB building permits | 9 | Structural · De Janeiro - APPLICATION IS FILED FOR INTERIOR RENOVATION IN EXISTING RETAIL SPACE- SLAB INFILL FOR REMOVED CONVENIENCE STAIR AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jul 29, 2026 |
| B | SUPREME CONSTRUCTION SERV NYC DOB building permits | 9 | General Construction · Renovation and enlargement of existing one family dwelling. No product keyword matched | 0 | Jul 29, 2026 |
| B | ECD NY INC NYC DOB building permits | 9 | Support of Excavation · SOE filing No product keyword matched | 0 | Jul 29, 2026 |
| B | ELLIMAN PROPERTY MANAGEMENT NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF LOBBY AREA AT THE FITNESS CENTER. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | MURRAY HILL MANAGEMENT NYC DOB building permits | 9 | Antenna · Modification to existing VERIZON site on the roof. Replacement of (12) antennas. Removal of (6) RRH units and (6) cabinets. Installation of (3) cabinets and (12) RRH units. Add mount bracing and FDNY access platforms. No product keyword matched | 0 | Jul 29, 2026 |
| B | 3 J'S RESTORATION INC NYC DOB building permits | 9 | General Construction · EXISTING BUILDING BRICK WALL REHABILITATION WORK INCLUDING TEMPORARY SHORING, PARTIAL DEMOLITION, AND RETROFIT WORK. No product keyword matched | 0 | Jul 29, 2026 |
| B | BAKE & THINGS NYC DOB building permits | 9 | General Construction · AS PER PLANS, AT EXPOSURES 1 & 2, REPLACE DAMAGED AND DEFECTIVE BRICKWORK ABOVE OR AROUND 3 SECOND FLOOR WINDOWS. REPLACE RUSTED LINTELS AT SAME. THIS APPLICATION SUPERSEDES JOB #B01031916-I1. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | 234 Schenectady Realty LLC NYC DOB building permits | 9 | General Construction · PROPOSED ENLARGEMENT AT FRONT ENTRANCE WITH REPLACEMENT OF NEW ENTRANCE DOOR AND DWELLING UNIT #4 AND #6. RENOVATION TO REPAIR AS PLAN, NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jul 29, 2026 |
| B | FIRST RESIDENTIAL NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE REPAIR WORK AT 6801 SHORE ROAD, BROOKLYN, NY 11220 No product keyword matched | 0 | Jul 29, 2026 |
| B | TENARES GOURMET DELI GROCERY NYC DOB building permits | 9 | Plumbing · Installation of plumbing fixtures and gas cooking equipment on existing deli store associated with interior renovation under application #X00925393. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Jul 29, 2026 |
| B | GUARDIAN RESTORATION INC NYC DOB building permits | 9 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 29, 2026 |
| B | Chicagos Pizza Twist NYC DOB building permits | 9 | Plumbing · HEREWITH FILING FOR PLUMBING MODIFICATIONS TO ADD A NEW GAS DEEP FRYER & GAS COOK TOP AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY THIS APPLICATION. No product keyword matched | 0 | Jul 29, 2026 |
| B | SAL VIO CONSTRUCTION CORP. NYC DOB building permits | 9 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 29, 2026 |
| B | 4102 13TH AVENUE DEVELOPMENT LLC NYC DOB building permits | 9 | Plumbing · Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress. No product keyword matched | 0 | Jul 29, 2026 |
| B | ESV REALTY CORP NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. WORK TO INCLUDE NEW BATHROOM, NEW INTERIOR RAMP, CARPENTRY WORK, AND NEW FIXTURES. NO CHANGE IN USE, EGRESS, AND OCCUPANCY INVOLVED UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 29, 2026 |
| B | SKYC MANAGEMENT NYC DOB building permits | 9 | General Construction · FACADE REPAIR AS SHOWN ON PLANS. No product keyword matched | 0 | Jul 29, 2026 |
| B | AAA Wholesale of Maspeth 330 Inc NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF 8 TRANE ROOFTOP MOUNTED UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 29, 2026 |
| B | BROOKYLN SOLARWORKS, LLC NYC DOB electrical permits | 9 | ELECTRICAL PERMIT FOR 5 SOLAR PANELS AND MICRO-INVERTERS ON GARAGE OF PROPERTY. SOLAR CONNECTED TO SERVICE IN MAIN HOUSE, ASSOCIATED WITH PERMIT #Q01386319 No product keyword matched | 0 | Jul 29, 2026 |
| B | AVON PLBG & HTG INC NYC DOB building permits | 9 | Sprinklers · RENOVATION OF MARTIAL ART STUDIO, INCLUDING INSTALLATION AND REPLACEMENT OF SPRINKLER HEADS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THISAPPLICATION. No product keyword matched | 0 | Jul 28, 2026 |
| B | NYC HEALTH AND HOSPITAL WOODHULL NYC DOB building permits | 9 | Plumbing · Installation of gas, and make-up water piping for emergency boiler tie-in. No product keyword matched | 0 | Jul 28, 2026 |
| B | SPAXEL NYC DOB building permits | 9 | Standpipe · Install temporary construction standpipe. No product keyword matched | 0 | Jul 28, 2026 |
| B | SYROS CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · PROPOSE VERTICAL EXTENSION TO AN EXISTING 2-STORY + BASEMENT BY ADDING A 3RD STORY AND EXTENDING HORIZONTALLY INTO THE REAR YARD. No product keyword matched | 0 | Jul 28, 2026 |
| B | VADEM BRODSKY NYC DOB building permits | 9 | Protection and Mechanical Methods · Installation of temporary wire mesh enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jul 28, 2026 |
| B | INTERCITY PLBG & HTG CORP NYC DOB building permits | 9 | Plumbing · Filing plans herewith for plumbing work associated with the interior renovation of an existing McDonalds restaurant. No change in use, egress, or occupancy. No product keyword matched | 0 | Jul 28, 2026 |
| B | 155 PERRY ST CONDOMINIUM NYC DOB building permits | 9 | General Construction · PHASE II APT REHAB WORK AT UNITS 11C, 12C, 13C. INCLDS NON-LOAD BEARING PARTITION WORK, CEILING REPAIRS & NEW FINISHES AS PER PLANS. NO ST WORK & NO CHG TO EXT'G LAYOUTS. PL WORK UNDER SEPARATE FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 28, 2026 |
| B | 111-117 W 96 ST OWNERS INC NYC DOB building permits | 9 | General Construction · APPLICATION FILED FOR FACADE REPAIRS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION No product keyword matched | 0 | Jul 28, 2026 |
| B | BEDNARZ BUILDING CORP NYC DOB building permits | 9 | General Construction · Demo 1 bathroom, kitchen cabinets, walls at noted locations, new flooring, ceiling, new walls at noted locations. apt being changed from a 2 to 3 bedroom. no change in use, occupancy or means of egress. No product keyword matched | 0 | Jul 28, 2026 |
| B | TOMCO MECHANICAL CORP NYC DOB building permits | 9 | Plumbing · Related drain work for island remodel. Including removal of existing hub drains and installation of new floor sinks with new vent/water/waste lines to accommodate refrigeration units. No product keyword matched | 0 | Jul 28, 2026 |
| B | D.D.S. MECH PBG&HTG CORP NYC DOB building permits | 9 | Plumbing · Plumbing work in conjunction with Alt-CO B00683860. No product keyword matched | 0 | Jul 28, 2026 |
| B | GEE BEE AND SONS LLC NYC DOB building permits | 9 | Construction Fence · TEMPORARY CONSTRUCTION FENCE FOR WORK BEING DONE AT THE REAR YARD OF 25 MAPLE STREET. No product keyword matched | 0 | Jul 28, 2026 |
| B | DOMUS BROOKLYNIS NYC DOB building permits | 9 | General Construction · The project is the renovation of a 3-story + cellar and basement row house located in prospect heights height / Prospect Heights historic district of Brooklyn. No product keyword matched | 0 | Jul 28, 2026 |
| B | ANTHONY CUCICH ARCHITECT NYC DOB building permits | 9 | General Construction · 2 STORY REAR EXTENSION AND GENERAL RENOVATION OF 2 STORY BUILDING. No product keyword matched | 0 | Jul 28, 2026 |
| B | Sharptown Group LLC NYC DOB building permits | 9 | Mechanical Systems · Filing Mechanical application for installation of condensing units and associated equipment as per plans submitted. This is associated with general construction application M01254795-I1 No product keyword matched | 0 | Jul 28, 2026 |
| B | JOHNNY'S P&H CONTRAC INC NYC DOB building permits | 9 | Plumbing · Two new gas boilers. Two new hot water heaters. Two new gas dryer. One gas line upgrade to 1.25. No product keyword matched | 0 | Jul 28, 2026 |
| B | RXR-The Hall NYC DOB building permits | 9 | Sprinklers · SPRINKLER MODIFICATIONS TAKING PLACE ON THE 8TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 28, 2026 |
| B | PACIFIC PLBG. & HTG. CORP NYC DOB building permits | 9 | Plumbing · LEGALIZATION OF THE PLUMBING WORK PORTION OF THE DOB IS APPLICATION #103621387 FOR THE COMBINATION OF THE APARTMENTS 6A AND 6B TO CAP AND REMOVE ONE OF THE KITCHENS, NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 28, 2026 |
| B | 55 EAST BROADWAY REALTY LLC NYC DOB building permits | 9 | Sprinklers · INSTALL NEW SPRINKLER SYSTEM AS PER PLAN. NO CHANGE OF USE, OCCUPANCY AND EGRESS. No product keyword matched | 0 | Jul 28, 2026 |