Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | R&K CONTRACTING NY CORP NYC DOB building permits | 11 | Curb Cut · INSTALLATION OF NEW CURB CUT AS PER DRAWING. No product keyword matched | 4 | Nov 6, 2026 |
| B | The Church of Jesus Christ NYC DOB building permits | 11 |
| 1 |
| Nov 6, 2026 |
| B | PLATFORM SOLUTIONS INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33. No product keyword matched | 34 | Nov 6, 2026 |
| B | FIRERUSH LLC NYC DOB building permits | 11 | Foundation · SUBSEQUENT FILING FOR FOUNDATION PLANS IN CONJUNCTION WITH NB JOB #B01328207-I1 No product keyword matched | 10 | Nov 6, 2026 |
| B | CITY LINE PROPERTIES NYC DOB building permits | 11 | Mechanical Systems · EXISTING 2 FAMILY BUILDING WITH MECHANICAL WORK ATBASEMENT, 1ST AND 2ND FLOOR. JOB FILED TO RELATED TO ALT2APPLICATION # B01319187-I1.2. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY No product keyword matched | 1 | Nov 6, 2026 |
| B | NEW AMSTERDAM RESTORATION NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 19 | Nov 6, 2026 |
| B | DNA CONTRACTING LLC NYC DOB building permits | 11 | General Construction · FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 6, 2026 |
| B | United American Land NYC DOB building permits | 11 | Plumbing · FILING FOR PLUMBING WORK AT THE EXISTING 1ST FLOOR CORNER STORE IN CONJUNCTION WITLL APPLICATION # M00950627-I1. No product keyword matched | 13 | Nov 6, 2026 |
| B | W.&M. OPERATING, LLC NYC DOB building permits | 11 | Structural · PROPOSED INSPECTIONS AND FACADE RESTORATION AT ALL BUILDING ELEVATIONS. No product keyword matched | 2 | Nov 6, 2026 |
| B | NBCUNIVERSAL NYC DOB building permits | 11 | General Construction · INTERIOR DEMOLITION WORK ON THE 6TH & 7TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY IS INVOLVED No product keyword matched | 5 | Nov 6, 2026 |
| B | NYC DDC NYC DOB building permits | 11 | Protection and Mechanical Methods · Demolition of structure using Cat 320, 345 excavator or equivalent with demo attachments, and Bobcat S300 skid steer No product keyword matched | 26 | Nov 6, 2026 |
| B | 15TH ASSOCIATES LLC NYC DOB building permits | 11 | Suspended Scaffold · renew application. No product keyword matched | 1 | Nov 6, 2026 |
| B | ON STAR MANAGEMENT LLC NYC DOB building permits | 11 | Full Demolition · Full demolition of a 1 and 2-story brick and steel with wood frame building. No product keyword matched | 17 | Nov 6, 2026 |
| B | EILAT REALTY CORP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AT SIDEWALK AS PER DRAWINGS. No product keyword matched | 3 | Nov 6, 2026 |
| B | ANCHOR PLUMBING CORP NYC DOB building permits | 11 | Sprinklers · Installation of new sprinkler system as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 3 | Nov 6, 2026 |
| B | Consolidated Edison NYC DOB electrical permits, NYC DOB building permits | 11 | Installation of 400A service to feed 4-dual port and 1-single port EV chargers for Con Edison fleet vehicles, all work located with in the Con Edison yard No product keyword matched | 25 | Nov 6, 2026 |
| B | RZ PROJECT MANAGEMENT COR NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL INSTALLATION IN CONJUNCTION WITH RENOVATION AND CONVERSION OF THE EXISTING 3 FAMILY TO SINGLE FAMILY RESIDENCE. PAA P1 FILED TO AMEND PLANS. PAA P2 TO AMEND MS SCHEDULE. AS PER PLANS FILED. No product keyword matched | 4 | Nov 6, 2026 |
| B | CHATEAU GC LLC NYC DOB building permits | 11 | General Construction · MODERATE TENANT IN PLACE INTERIOR APARTMENT RENOVATION TO INCLUDE, REPLACMENT OF ALL APARTMENT ENTRY DOORS, REPLACEMENT OF KITCHEN CABINETS, COUNTERTOPS AND APPLIANCES. FURNISH AND INSTALL NEW BATHRROM VANITY AND SINK. FURNISH AND INSTALL NEW VCT PER PLAN No product keyword matched | 7 | Nov 6, 2026 |
| B | NASARIN CONTRACTING CORP NYC DOB building permits | 11 | Construction Fence · FURNISH AND INSTALLATION TEMPORARY CONSTRUCTION FENCE SURROUNDING THE CONSTRUCTION AREA AS PER NYC BUILDINGS DEPARTMENT CODES, RULES, REGULATIONS AND CONSTRUCTION REQUIREMENT. No product keyword matched | 1 | Nov 6, 2026 |
| B | SAMCO PROPERTIES NYC DOB building permits | 11 | Mechanical Systems · Modification of mechanical on 15th & 16th floors as per plans. No change in use, egress or occupancy. No product keyword matched | 11 | Nov 6, 2026 |
| B | 902 QUENTIN RD. LLC NYC DOB building permits | 11 | Foundation · Foundation for a new two story and four sublevels building. DOB NOW NB # Q00643563 No product keyword matched | 3 | Nov 6, 2026 |
| B | 50 HYMC OWNER LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS TAKING PLACE ON 14TH & 15TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 12 | Nov 6, 2026 |
| B | JASA NYC GROUP INC NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR REVISION AND FENCING OF PARKING AREA. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 6, 2026 |
| B | 153 Hillside Avenue LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · KNUCKLEBOOM PLACEMENT. THIS APPLICATION INVOLVES NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 11 | Nov 6, 2026 |
| B | CROSSFIELD PLBG.&HTG NYC DOB building permits | 11 | Sprinklers · Sprinkler work in conjunction with school fit-out as per plans filed. No change to use, egress, or occupancy. No product keyword matched | 24 | Nov 6, 2026 |
| B | FERRADO HOTELS, LLC NYC DOB building permits | 11 | Plumbing · Filing for plumbing modifications as per the plans No change in use, egress, or occupancy. No product keyword matched | 6 | Nov 6, 2026 |
| B | NYC HPD NYC DOB building permits | 11 | Plumbing · SUBSEQUENT FILING FOR SPRINKLER & PLUMBING WORK FOR ENTIRE BUILDING IN ASSOCIATION WITH ALTERATION TYPE 1 APPLICATION #123768324. No product keyword matched | 36 | Nov 6, 2026 |
| B | WATSON'S PLUMBING HEATING NYC DOB building permits | 11 | Mechanical Systems · FILED HEREWITH FOR MECHANICAL WORK TYPE IN CONJUNCTION WITH M08050531-I1. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 9 | Nov 6, 2026 |
| B | NICE PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Filing plumbing work type in-conjunction with GC job#B01395802-I1. No product keyword matched | 6 | Nov 6, 2026 |
| B | RENEW PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Filing for plumbing fixtures with associated waste and water lines , and gas equipment with gals lines and associated valves. No product keyword matched | 3 | Nov 6, 2026 |
| B | WINICK PRODUCTIONS, LLC NYC DOB building permits | 11 | General Construction · Installation of temporary trusses & partitions, no alt to exist structures for Wendy's Holiday Box NYC Pop-Up. TPA permit not req. Producer responsible to monitor site safety & implement HWAP. Production equip removed upon event completion. No product keyword matched | 21 | Nov 6, 2026 |
| B | HT BUILDS LLC NYC DOB building permits | 11 | General Construction · Hereby filing a restaurant renovation project. The work scope is in an existing restaurant. The kitchen will be expanded and reorganized. There will be a new service counter in front of the kitchen. The bathroom will stay the same. No product keyword matched | 12 | Nov 6, 2026 |
| B | DOVAL PLBG & HTG CORP NYC DOB building permits | 11 | Plumbing · PROPOSE MINOR PLUMBING WORK & INSTALLATION COMMERCIAL KITCHEN COOKING EQ AS PER THE PLANS SUBMITTED HEREWITH. No product keyword matched | 3 | Nov 6, 2026 |
| B | FINE & FAIR CONSTRUCTION NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION PLYWOOD FENCE INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 6, 2026 |
| B | SUPER POWER CONSTRUCTION NYC DOB building permits | 11 | Curb Cut · remove existing curb cut and install curb, no change in use, occupancy or egress. file in conjunction with Altco@Q01437011-I1 No product keyword matched | 5 | Nov 6, 2026 |
| B | LONG ISLAND POWER SOLUTIO NYC DOB building permits | 11 | Solar · Installation of PV System on existing rooftop. No changes to Egress or use of occupancy. No product keyword matched | 7 | Nov 6, 2026 |
| B | BAY RESTORATION CORP NYC DOB building permits | 11 | Supported Scaffold · ALTERATION TYPE 3 - INSTALL SUPPORTED PIPE SCAFFOLDING AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 22 | Nov 6, 2026 |
| B | JRM CONSTRUCTION MGMT LLC NYC DOB building permits | 11 | Mechanical Systems · Mechanical work associated with Partial Renovation of 1st and 2nd Floor. in Religious Building. No change, egress, zoning, use or occupancy. No product keyword matched | 20 | Nov 6, 2026 |
| B | UNITED TALMUDICAL ACADEMY NYC DOB building permits | 11 | General Construction · OCCUPANT PROTECTION PLAN FILED IN CONJUNCTION WITH ALT 1 321423535. No product keyword matched | 2 | Nov 6, 2026 |
| B | MASTER 2 PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · Interior renovation of apartment 8A, associated with the PL Scope. No change in use, egress, or occupancy under this application. No product keyword matched | 6 | Nov 6, 2026 |
| B | ACADIA REALTY NYC DOB building permits | 11 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - S(CHECKMARK). NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 16 | Nov 6, 2026 |
| B | BANANA KELLY COMMUNITY IMPROVEMENT NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH APPLICATION #X08034232-I1. No product keyword matched | 3 | Nov 6, 2026 |
| B | HHC/ GOTHAM HEALTH NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGES IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 3 | Nov 6, 2026 |
| B | PROTO RESTORATION SPECIAL NYC DOB building permits | 11 | General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 6, 2026 |
| B | HOD PIPING & HEATING CORP NYC DOB building permits | 11 | Plumbing · REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (1 LAV, 1 WC, 1 SINK) AT 1C & 2A. INSTALL NEW PLUMBING FIXTURES (1 DW, 1 W/M, 1 SHOWER) AT 1C & 2A AND (1 WC, 1 LAV) AT THE CELLAR. CAP AND REMOVE PLUMBING FIXTURES (1 TUB) AT 1C & 2A. No product keyword matched | 8 | Nov 6, 2026 |
| B | R.A. COHEN & ASSOC. INC. NYC DOB building permits | 11 | Mechanical Systems · EXTEND EXISTING KITCHEN RANGEHOOD EXHAUST SYSTEM TO COVER EXISTING OVEN, REPLACEMENT OF THE EXISTING PCU UNIT AND REPLACEMENT OF DUCTWORK WITHIN THE KITCHEN AREA ONLY. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 3 | Nov 6, 2026 |
| B | Institute for Community Living (ICL NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION FENCE AS PER APPROVED DRAWING. No product keyword matched | 4 | Nov 6, 2026 |
| B | PARAMOUNT HOMES MANAGE NYC DOB building permits | 11 | General Construction · ERECTION OF A NEW 9 STORY + CELLAR RESIDENTIAL BUILDING. PURSUANT TO UAP REGULATIONS. No product keyword matched | 10 | Nov 6, 2026 |
| B | SOLARBLOCKS ENERGY LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY. No product keyword matched | 4 | Nov 6, 2026 |
| B | WATERMARK NYC DOB building permits | 11 | Construction Fence · PROPOSED TEMPORARY 8' PLYWOOD CONSTRUCTION FENCE No product keyword matched | 10 | Nov 6, 2026 |