Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ABDUL CONSTRUCTION & PAIN NYC DOB building permits | 9 | General Construction · Facade repair which includes brownstone repair. No change in use occupancy or egress under this application. Sidewalk shed filed under separate application. No product keyword matched | 0 | Jul 31, 2026 |
| B | American Endovascular |
| 9 |
Boiler Equipment · REMOVAL AND INSTALLATION OF ELECTRICAL SYSTEMS, SUB-BASE FUEL OIL STORAGE, AND GENERATOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Jul 31, 2026 |
| B | PERFECT SQUARE CONSTRUCTI NYC DOB building permits | 9 | General Construction · RENOVATE THE SECOND FLOOR OF THIS SINGLE FAMILY HOME, GENERAL CONSTRUCTION TO INCLUDE LIMITED REMOVAL AND CONSTRUCTION OF NON-STRUCTURAL PARTITIONS, NEW LIGHTING THROUGHOUT, REPLACEMENT, RELOCATION AND NEW AND PLUMBING FILED AS A SUB DOC. No product keyword matched | 0 | Jul 31, 2026 |
| B | BK CONSTRUCTION SVCS INC NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF 300' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 31, 2026 |
| B | Litbis II NYC DOB building permits | 9 | Plumbing · New and replaced plumbing fixtures in existing store No product keyword matched | 0 | Jul 31, 2026 |
| B | P.A.C. HEATING INC NYC DOB building permits | 9 | Plumbing · Legalization of a gas fired pool heater in open space and legalization of additional gas fired boiler, including legalization of relocation of existing boiler at cellar level. No product keyword matched | 0 | Jul 31, 2026 |
| B | Arthur Kill Power LLC NYC DOB building permits | 9 | General Construction · Facade restoration project to address LL11 deficiencies for cycle 10A. No changes to use, egress, or occupancy. No product keyword matched | 0 | Jul 31, 2026 |
| B | PFNY, LLC NYC DOB building permits | 9 | General Construction · Interior fit out work and change of use from retail to a Health & Fitness Establishment on the cellar and first floor. No change in egress and bulk of the building. No product keyword matched | 0 | Jul 31, 2026 |
| B | MORILOGIC INC NYC DOB building permits | 9 | Solar · SOLAR ELECTRIC ARRAY INSTALLATION No product keyword matched | 0 | Jul 31, 2026 |
| B | James Pannullo Real Estate, Inc. NYC DOB building permits | 9 | Plumbing · exterior storm piping No product keyword matched | 0 | Jul 31, 2026 |
| B | FRIEDMAN ROTH REALTY SERVICES NYC DOB building permits | 9 | Plumbing · Plumbing work type associated with the construction of an accessory parking lot, which includes installation of new on-site inlets, conveyance piping and underground retention system. No product keyword matched | 0 | Jul 31, 2026 |
| B | Joshua Potash NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION FOR LIMITED EXTERIOR REPAIRS ON NORTH, SOUTH EAST, WEST ELEVATIONS & ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | Tip-Top Brain #2 LLC NYC DOB building permits | 9 | Mechanical Systems · Herewith filing for ductwork ONLY for Learning Center fit-out to be located on the first floor in existing building. All mechanical equipment is existing to remain. No product keyword matched | 0 | Jul 31, 2026 |
| B | SOLOMON CONTRACTING INC NYC DOB building permits | 9 | General Construction · General construction to demolish a portion of the kitchen wall and replace it with a half wall 3' in height, build soffits in two rooms. No change in occupancy and egress. No product keyword matched | 0 | Jul 31, 2026 |
| B | SAR ACADEMY ORGANIZATION NYC DOB building permits | 9 | Plumbing · Installing sinks, emergency showers and bunsen burners for classroom lab. No product keyword matched | 0 | Jul 31, 2026 |
| B | DOOR TO DOOR REALITY LLC NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 31, 2026 |
| B | Fresh Dining Concepts NYC DOB building permits | 9 | Plumbing · MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Jul 31, 2026 |
| B | GRAND ST. CONCERT, INC. NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FALCONERI. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | MISSION OF ALGERIA TO THE UN NYC DOB building permits | 9 | General Construction · HEREBY SUBMITTING FOR THE RENOVATION OF AN EXISTING 16-STORY OFFICE BUILDING WITH CELLAR. THE SCOPE INCLUDES REPLACEMENT OF WINDOWS, INSTALLATION OF A NEW STOREFRONT, NEW ROOF INSULATION, WATERPROOFING, AND INSTALLATION OF ROOF PAVERS. THERE ARE NO CHANGE No product keyword matched | 0 | Jul 31, 2026 |
| B | DEMOCRACY PREP PUBLIC SCHOOLS NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF NEW ROOFTOP UNITS AND ASSOCIATED REFRIGERANT PIPING, DUCTWORK, NEW DEDICATED VAV UNITS, NEW EXHAUST FANS AND ASSOCIATED DUCTWORK, LOUVERS, NEW WATER-COOLED FAN COIL UNIT AND ASSOCIATED PIPING, WIRING, CONTROLS,DUCTWORK, RF AIR CONDITIONERS No product keyword matched | 0 | Jul 31, 2026 |
| B | H&J BUILDING CONSULTING INC NYC DOB building permits | 9 | Structural · NTERIOR RENOVATION OF AN EXISTING TWO-STORY BUILDING, INCLUDING A NEW BALCONY, MINOR BEAM REPLACEMENT, AND ASSOCIATED GENERAL CONSTRUCTION AND STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | RENOVATION WITH PASSION I NYC DOB building permits | 9 | General Construction · PARTIAL INTERIOR RENOVATION OF APARTMENT 5C, MINOR LAYOUT CHANGES AS PER PLAN, NEW FINISHES. NO CHANGE TO USE OCCUPANCY AND EGRESS. No product keyword matched | 0 | Jul 31, 2026 |
| B | ATLANTIC ADVANTAGE LLC NYC DOB building permits | 9 | Full Demolition · Full demolition to a one story building No product keyword matched | 0 | Jul 31, 2026 |
| B | JACG Realty LLC NYC DOB building permits | 9 | Plumbing · Plumbing and sprinkler modification and new installation work in conjunction alteration application # Q01392424-I1. No product keyword matched | 0 | Jul 31, 2026 |
| B | 160 ARLINGTON AVENUE CORP. NYC DOB building permits | 9 | General Construction · APPLICATION IS FILED FOR THE INTERIOR RENOVATION AT THE CELLAR OF AN EXISTING 2-STORY 2-FAMILY RESIDENCE. APPLICATION FILED IN DIRECT RESPONSE TO ECB VIOLATIONS 35370484L, 35370483J. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPICATION. NO NEW CO. No product keyword matched | 0 | Jul 31, 2026 |
| B | VILLAGE SUPER MARKET, INC NYC DOB building permits | 9 | Plumbing · Interior plumbing clean-out. Refer to M01413548-I1. Remove two water closets, two lavatories, one drinking fountain, and one mop sink. Cut back and cap associated domestic water, sanitary, and vent piping. Future tenant fit-out under separate application. No product keyword matched | 0 | Jul 31, 2026 |
| B | GAIA Real Estate NYC DOB building permits | 9 | Mechanical Systems · NEW PARTITIONS, COUNTERTOPS, DOOR, PAINT , AND MECHANICAL DUCTWORK AND NEW SYSTEMS ON EXISTING EATING AND DRINKINGESTABLISHMENT AS PER PLAN FILED HEREWITH, NO CHANGE OF USE,EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | Via Clover NYC DOB building permits | 9 | General Construction · HEREBY FILING FOR THE RENOVATION OF EXITING RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | VAN BRUNT BUILDING CORP. NYC DOB building permits | 9 | General Construction · herewith file application to restore and repair existing commercial building due to fire damage at 001 Fl. and Roof as per plans. No change on use, occupancy or egress. No product keyword matched | 0 | Jul 31, 2026 |
| B | JOHN MENDEZ AUTO GROUPS NYC DOB building permits | 9 | General Construction · Filing to change the use from ware house storage B2 to auto body repair shop No product keyword matched | 0 | Jul 31, 2026 |
| B | JZ GENERAL CONSTRUCTION NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION IN APT 6703 FILED IN CONJUNCTION WITH DOB NOW PL AND ST.. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 31, 2026 |
| B | TRITON SOLUTIONS LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF AN EXISTING COMMERCIALSPACE. REMOVAL OF FLOOR, WALL AND CEILING FINISHES, REPLACING LIGHT FIXTURES, INSTALLING NEWNON-LOAD-BEARING PARTITIONS, INSTALLING NEWDOORS, NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 31, 2026 |
| B | NEXO PAINTING LLC NYC DOB building permits | 9 | General Construction · PROPOSED CONVERSION OF AN EXISTING 3-STORY, 2-FAMILY DWELLING INTO A 3-FAMILY DWELLING, BY CREATING A NEW APARTMENT AT 1ST FLOOR. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | Cummins Sales & Service NYC DOB building permits | 9 | Boiler Equipment · REMOVE EXISTING 2,000-GALLON OUTDOOR FUEL OIL STORAGE TANK. REMOVE EXISTING INSIDE 100-GALLON DAY TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 31, 2026 |
| B | XYLO CORP NYC DOB building permits | 9 | Construction Fence · Existing Retail Store to receive new finishes to floor & walls new teller counter area. New HC bathroom. Store front repair work, Plumbing filed as subsequent. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 31, 2026 |
| B | HABITERRA LLC NYC DOB building permits | 9 | General Construction · Installation of Convenience stair on the first floor to the rear yard no change in use egress or occupancy No product keyword matched | 0 | Jul 31, 2026 |
| B | BURDG DUNHAM & ASSOCIATES NYC DOB building permits | 9 | Mechanical Systems · PETCO - FILING HEREWITH FOR THE MECHANICAL WORK RELATED TO THE INTERIOR IMPROVEMENT OF THE EXISTING SPACE. THERE WILL BE NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 0 | Jul 31, 2026 |
| B | GRACE BAPTIST CHAPEL NYC DOB building permits | 9 | Mechanical Systems · APPLICATION BEING FILED TO REPLACE AN EXISTING ROOFTOP HVAC UNIT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 31, 2026 |
| B | TWOUBADOU NYC DOB building permits | 9 | Plumbing · SUBSEQUENT FILING FOR PLUMBING WORK-TYPE ONLY IN CONJUNCTION WITH JOB #B00868676-P1 TO RENOVATE EXISTING COMMERCIAL PLACE FOR EATING AND DRINKING ESTABLISHMENT. No product keyword matched | 0 | Jul 31, 2026 |
| B | ELIDEX REALTY NYC DOB building permits | 9 | Sprinklers · HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES AND SPRINKLER HEAD. NO CHANGE TO USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 31, 2026 |
| B | CRAFT by Anika NYC DOB building permits | 9 | Curb Cut · HEREWITH FILING TO RENOVATE CURB CUT TO A 15 FT CURB CUT WITH (2) 1 1/2 FT SPLAYS No product keyword matched | 0 | Jul 31, 2026 |
| B | ARUNA PROFESSIONAL BUILDING LLC NYC DOB building permits | 9 | Plumbing · INSTALL BACKFLOW PREVENTER VALVE (RPZ) IN THE EXISTING WATER SYSTEM AT THE CELLAR No product keyword matched | 0 | Jul 31, 2026 |
| B | NORTHGATE ELECTRIC CORP. NYC DOB electrical permits | 9 | lighting installation No product keyword matched | 0 | Jul 31, 2026 |
| B | CITY PARKING NYC DOB building permits | 9 | Structural · TEMPORARY SHORING INSTALLATION AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 30, 2026 |
| B | HE'S 69 AVENUE LLC NYC DOB building permits | 9 | General Construction · PROPOSE TWO STORY WITH ONE FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 0 | Jul 30, 2026 |
| B | KINGSTONE GENERAL CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · FILING FOR FACADE REPAIRS- EXTERIOR POINTING, BRICK REPLACEMENT/REPAIRS, WINDOW COPING AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 30, 2026 |
| B | CLM NYC LLC NYC DOB building permits | 9 | Plumbing · PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jul 30, 2026 |
| B | BEAUMONT NY MANAGEMENT CORP. NYC DOB building permits | 9 | Plumbing · plumbing work in apt 410 No product keyword matched | 0 | Jul 30, 2026 |
| B | GGP STATEN ISLAND MALL LLC NYC DOB building permits | 9 | Mechanical Systems · Space #1645 Macys and Space #1055 Great Outdoors: DIRECT REPLACEMENT OF 1 PACKAGE AC UNIT SERVING SPACE 1645 AND 1 SPLIT SYSTEM AC UNIT SERVING SPACE 1055. OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 30, 2026 |
| B | 225 BROADWAY COMPANY LP NYC DOB building permits | 9 | Construction Fence · fence installation No product keyword matched | 0 | Jul 30, 2026 |