Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AEG RESTORATION CORP NYC DOB building permits | 9 | General Construction · Repair and replace all fire/water damaged building components at the rear portion throughout the dwelling unit. No change to use, egress or occupancy. No product keyword matched | 0 | Aug 4, 2026 |
| B | BOARD OF EDUCATION - DSF |
| 9 |
Mechanical Systems · FILE MECHANICAL WORK TO INSTALL (7)SPLIT HVAC UNITS AT ROOF FOR 3RD FLOOR CAFETERIA OF PUBLIC SCHOOL K655. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Aug 4, 2026 |
| B | 216th Realty, LLC NYC DOB building permits | 9 | Mechanical Systems · Replacement of air conditioning units. No change in use egress and occupancy. No product keyword matched | 0 | Aug 4, 2026 |
| B | 527 MYRTLE VENTURES LLC NYC DOB building permits | 9 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 0 | Aug 4, 2026 |
| B | Montgomery Burns LLC NYC DOB building permits | 9 | Plumbing · Plumbing work related to the renovation of an existing (2) family residence. No product keyword matched | 0 | Aug 4, 2026 |
| B | TAKKEE INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF ONE (1) EXISTING 2-STORY DWELLING UNIT. NO CHANGE TO OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Aug 4, 2026 |
| B | LG CHELSEA LLC NYC DOB building permits | 9 | General Construction · ALTERATION CO TO ADD THE USE FOR A COMMUNITY FACILITY, ASSEMBLY USE, ON THE FIRST FLOOR WITH COMPLETE PLAN CHANGES AND ONLY ONE STORE TO REMAIN. WE ARE ALSO PROPOSING TO CHANGE THE USE FROM FACTORY TO BUSINESS ON CEL, 2ND, 3R,D 4TH, AND 5TH FLOORS. No product keyword matched | 0 | Aug 4, 2026 |
| B | ROBERT CHIMENTI NYC DOB electrical permits | 9 | General Wiring Service work No product keyword matched | 0 | Aug 4, 2026 |
| B | NEWLAND ELECTRICAL INC NYC DOB electrical permits | 9 | Installing 2 new meters No product keyword matched | 0 | Aug 4, 2026 |
| B | STACK ELECT OF NEW YORK I NYC DOB electrical permits | 9 | Minor electrical work in apartment PH1AB No product keyword matched | 0 | Aug 4, 2026 |
| B | CY ELECTRICAL CORP. NYC DOB electrical permits | 9 | Use existing panel, new branch circuits for convenience outlets, new lighting and switches, dedicated circuit for coffee machine and dedicated receptacle outlets for refrigerators. No product keyword matched | 0 | Aug 4, 2026 |
| B | BORRELLI ELECTRIC INC NYC DOB electrical permits | 9 | Popular Bank General Wiring No product keyword matched | 0 | Aug 4, 2026 |
| B | MEIYUN CHEN NYC DOB building permits | 9 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 0 | Aug 3, 2026 |
| B | B-U-I-L-D.NET INC NYC DOB building permits | 9 | Structural · Proposed renovation & addition on the left side of the house. In addition to: Interior 1st fl remodel & addition of 780 SF (filed under an old Alt 1 402310717, status was permit partial prior to Revoke. Additional Notes under COMMENTS. No product keyword matched | 0 | Aug 3, 2026 |
| B | 85 EAST 158TH STREET NYC DOB building permits | 9 | Structural · GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | DRILON PLBG & HTG INC NYC DOB building permits | 9 | Plumbing · Plumbing work for interior commercial fit-out of PERSPIRE SAUNA STUDIO. Scope includes installation of new fixtures, piping modifications, water supply lines, and drainage system as per plans. No change in use, egress, or occupancy. No product keyword matched | 0 | Aug 3, 2026 |
| B | INPRO PLUMBING CORP NYC DOB building permits | 9 | Plumbing · Plumbing work as shown on plans No product keyword matched | 0 | Aug 3, 2026 |
| B | SYSTEMS 2000 PLBG SVCS LL NYC DOB building permits | 9 | Plumbing · Modifications to building's domestic cold water system. No change in use, egress or occupancy. No product keyword matched | 0 | Aug 3, 2026 |
| B | 26 COURT ASSOCIATES LLC NYC DOB building permits | 9 | General Construction · INTERIOR REOVATIONS OF NON LOAD-BEARING PARTITIONS, CEILINGS AND FINISHES ON PARTIAL 13TH FLOOR OF EXISTING BUILDING No product keyword matched | 0 | Aug 3, 2026 |
| B | SARWAY CONSTRUCTION LLC NYC DOB building permits | 9 | Construction Fence · Temporary construction fence in conjunction with application # B01217051-I1 No product keyword matched | 0 | Aug 3, 2026 |
| B | BUILDING 163 SC HDFC NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022. No product keyword matched | 0 | Aug 3, 2026 |
| B | OVER DEVELOPMENT LTD. NYC DOB building permits | 9 | Sprinklers · FILED HEREWITH; RESIDENTIAL SPRINKLER PLAN No product keyword matched | 0 | Aug 3, 2026 |
| B | PRIME ZONE BUILDING CONSULTING NYC DOB building permits | 9 | General Construction · CONVERT (1) ONE DWELLING UNIT INTO (2) TWO DWELLING UNITS FOR EXISTING 2-STORY BRICK BUILDING WITH BASEMENT. OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | ODYSSEY PLMBG & HTNG CORP NYC DOB building permits | 9 | Plumbing · subsequent filing for plumbing works. No product keyword matched | 0 | Aug 3, 2026 |
| B | THE JEWISH BOARD OF FAMILY AND CHIL NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORKS AT 265 EAST BURNSIDE AVENUE, BRONX, NY 10457. No product keyword matched | 0 | Aug 3, 2026 |
| B | MONCON, INC. NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | Eagle Tenants Corp NYC DOB building permits | 9 | General Construction · Exterior masonry repairs at building facades consisting of select brick replacement and repointing, stucco repairs, and windowsill repairs. No change in use, egress, or occupancy. No product keyword matched | 0 | Aug 3, 2026 |
| B | LUVER PLBG & HTG INC NYC DOB building permits | 9 | Plumbing · Installation of gas cooking equipment for existing restaurant on first floor of premises. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Aug 3, 2026 |
| B | Quantum property group corp NYC DOB building permits | 9 | General Construction · ENTIRE INTERIOR RENOVATION FOR CHANGING TO TWO FAMILY HOUSE CO FROM ONE FAMILY. No product keyword matched | 0 | Aug 3, 2026 |
| B | BRYANT PARK HOTEL NYC DOB building permits | 9 | Sprinklers · SUBSEQUENT APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR HOTEL LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | BUILDING INSPCETIONS NYC DOB building permits | 9 | Plumbing · Proposed filing for plumbing work in-conjunction with boiler replacement and installation of HWH. No product keyword matched | 0 | Aug 3, 2026 |
| B | SKYLIGHT DEVELOPMENT, INC. NYC DOB building permits | 9 | Foundation · Filing for Foundation Plans in conjunction with BIS NB 321131743. No product keyword matched | 0 | Aug 3, 2026 |
| B | 3RD AVENUE BLOCKFRONT, LLC. C/O BLU NYC DOB building permits | 9 | Construction Fence · Temporary Construction Fence with integrated noise mitigating barrier for New Building construction. No product keyword matched | 0 | Aug 3, 2026 |
| B | LAZAM PROPERTIES NYC DOB building permits | 9 | Mechanical Systems · Mechanical work as shown on plans, with installation of commercial cooking and exhaust systems in first floor kitchen. No product keyword matched | 0 | Aug 3, 2026 |
| B | BIG APPLE BUSINESS SOLUTIONS INC NYC DOB building permits | 9 | General Construction · FILING FOR HORIZONTAL ENLARGEMENT, INTERIOR ALTERATION AND CONVERSION FROM ONE FAMILY TO TWO FAMILIES OF EXISTING RESIDENCE No product keyword matched | 0 | Aug 3, 2026 |
| B | Cooper Union NYC DOB building permits | 9 | General Construction · Proposed work involves repairing existing walls damaged by a sprinkler burst. The scope of work entails removing wet sections of gypsum wall board, then replacing them with new, like-kind sheet-rocks to reinstate the wall integrity as per plans. No product keyword matched | 0 | Aug 3, 2026 |
| B | Sumitomo Mitsui Banking Corporation NYC DOB building permits | 9 | Sprinklers · additions/modifications to existing sprinkler systems on 13 and 14th floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | Aug 3, 2026 |
| B | NYC HEALTH + HOSPITALS/WOODHULL NYC DOB building permits | 9 | Mechanical Systems · REMOVE THE EXISTING HVAC DUCTWORK PIPING. CONTROLS, EQUIPMENT & ACCESSORIES WITHIN THE SCOPE OF WORK ARE AS SHOWN ON THE FLOOR PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Aug 3, 2026 |
| B | 409 LAFAYETTE STREET ASSOCIATES LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | FIFTH AVENUE LOFT CORPORATION NYC DOB building permits | 9 | General Construction · RENOVATION OF EXISTING RETAIL STORE ON THE 1ST FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Aug 3, 2026 |
| B | Wyna Cheung NYC DOB building permits | 9 | General Construction · REMOVE EXISTING SKIM COAT, REPAIR AND REPLACE DAMAGED BRICKS, INSTALL WIRE LATH, APPLY STUCCO, AND FINISH WITH MASONRY PAINT AS INDICATED ON THE PLANS. NO CHANGE IN USE, EXITS, OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | ST. BERNARD'S SCHOOL NYC DOB building permits | 9 | General Construction · INSTALLATION OF WINDOWS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | PNL Contracting Inc. NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | GUARDIAN REALTY NYC DOB building permits | 9 | General Construction · Change of use for new Health and Fitness Establishment, related interior work, new flooring and finishes No product keyword matched | 0 | Aug 3, 2026 |
| B | NEXT LEVEL IMPROVEMENTS NYC DOB building permits | 9 | General Construction · Site work at rear yard, Concrete Retainer walls replacement at East, North and West, corner garage foundation wall einforcement, side concrete stairs, Chimney removal, and drainage site work, in order to resolve DOB and ECB Violations, as per plans. No product keyword matched | 0 | Aug 3, 2026 |
| B | FM CONSOLIDATED HOLDING NYC DOB building permits | 9 | Structural · STRUCTURAL FRAMING FOR PROPOSED STORAGE LOFT & MECHANICAL PLATFORM ALONG WITH ROOFTOP DUNNAGE FOR SPACE ONE / SUITE 111 ONLY AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 0 | Aug 3, 2026 |
| B | 504 HALSEY LLC NYC DOB building permits | 9 | Plumbing · Replace all existing bathroom and kitchen fixtures No product keyword matched | 0 | Aug 3, 2026 |
| B | dong sheng food inc NYC DOB building permits | 9 | Mechanical Systems · INTERIOR RENOVATION FOR EXISTING RESTAURANT AT 1ST. FLOOR. MECHANICAL AND PLUMBING WORK AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Aug 3, 2026 |
| B | Harris Family Holding Group, LLC NYC DOB building permits | 9 | Plumbing · NEW KITCHENS AND BATHROOMS PLUMBING RISERS, BRANCH LINES, FIXTURES AND SPRINKLER SYSTEM FOR RENOVATION AND CONVERSION OF EXISTING RESIDENTIAL BUILDING. No product keyword matched | 0 | Aug 3, 2026 |
| B | SUPREME MECH NYC LLC NYC DOB building permits | 9 | Plumbing · NEW PLUMBING WORK ONLY FILED IN CONJUNCTION WITH NB # 220212918 No product keyword matched | 0 | Aug 3, 2026 |