Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | 176-12 KILDARE LLC NYC DOB building permits | 7 | Foundation · Foundation and partial demolition drawings for the extension of the building No product keyword matched | 0 | Jan 9, 2026 |
| C | BAYSIDES FINEST CONST COR NYC DOB building permits | 7 |
General Construction · APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION (GUT REHAB) AT BASEMENT LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN BULK. No product keyword matched |
| 0 |
| Jan 9, 2026 |
| C | NPG LLC NYC DOB building permits | 7 | Structural · Reinforcement and partial replacement of the floor joists at every floor level. Minor repointing of the basement walls. Scraping and painting of the steel beam supporting the front facade. Strengthening repairs at the east and west party-walls. Repointing No product keyword matched | 0 | Jan 9, 2026 |
| C | MA1 NYC DOB building permits | 7 | Support of Excavation · SHORING WORK INCONJUCTION WITH APPLICATION # B00801550 No product keyword matched | 0 | Jan 9, 2026 |
| C | ALPS INTERIORS INC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION TO EXISTING APARTEMENT 6B, LOCATED ON THE 6TH FLOOR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 9, 2026 |
| C | JL SERVICE GROUP LLC NYC DOB building permits | 7 | General Construction · HEREWITH FILING AN APPLICATION TO RESTORE BASEMENT TO PREVIOUS APPROVED CONDITIONS. FILING TO REMOVE WINDOW UNIT AND INSTALL 9' X 7' INSULATED OVERHEAD DOOR. NO CHANGE IN USE,EGRESS OR OCCUPANCY. FILING APPLICATION TO ADDRESS VIOLATION 39115499L. No product keyword matched | 0 | Jan 9, 2026 |
| C | LANDLORD NYC DOB building permits | 7 | Plumbing · FILING TO REPLACE EXISTING GAS PIPING IN COMMERCIAL RESTAURANT AFTER FIRE, INSTALLATION OF COMMERCIAL COOKING EQUIPMENT ON 1ST FLOOR (REPLACING EXISTING EQUIPMENT DAMAGED BY FIRE) WORK AREA, CELLAR,1ST AND ROOF NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 9, 2026 |
| C | ISMAEL REALTY NYC DOB building permits | 7 | Construction Fence · INSTALL A TEMPORARY 8' PLYWOOD CONSTRUCTION FENCE. No product keyword matched | 0 | Jan 9, 2026 |
| C | NU3S LLC NYC DOB building permits | 7 | Mechanical Systems · New HVAC system for entire building. No change to use, egress or occupancy. No product keyword matched | 0 | Jan 9, 2026 |
| C | MCCREADY & RICE PLUMB.,IN NYC DOB building permits | 7 | General Construction · Apartment combination, general construction and new finishes. No change to use, egress or occupancy under this application. No product keyword matched | 0 | Jan 9, 2026 |
| C | TIMESHARE ACQUISITIONS AT LEXINGTON NYC DOB building permits | 7 | Sprinklers · Modification of sprinkler heads and related piping for entire building. No product keyword matched | 0 | Jan 9, 2026 |
| C | S&P ELECTRIC CO LLC NYC DOB electrical permits | 7 | NYC HDC No product keyword matched | 0 | Jan 9, 2026 |
| C | THC CONSTRUCTION INC NYC DOB building permits | 7 | Curb Cut · INSTALL NEW 13.0' DROP CURB INCLUDE 1'-6 SPLAY ON BOTH SIDE. No product keyword matched | 0 | Jan 8, 2026 |
| C | BERKSHIRE REFRIGERATION S NYC DOB building permits | 7 | Mechanical Systems · Replacement of (2) packaged rooftop units. Existing units are (1) 7.5-Ton and (1) 8.5-Ton. New to be (2) 8.5-Ton units. Work limited to direct replacement of RTUs, no modification of ductwork or disturbance of building. No product keyword matched | 0 | Jan 8, 2026 |
| C | MITRA MEHR LLC NYC DOB building permits | 7 | General Construction · Combine & renovate 2 existing buildings 331 & 333 E 50 St., Manhattan. Replace roof & partially raise at rear. Install new elevator & exterior lift . Lower Bas. FL by 8. Obtain New Certificate of Occupancy. ST, MEP, & SP work types will file separately No product keyword matched | 0 | Jan 8, 2026 |
| C | Millwright 740 Corp. NYC DOB building permits | 7 | Mechanical Systems · Installation of (2) Roof Top Mounted units. (15 ton & 7 1/2 ton units). No product keyword matched | 0 | Jan 8, 2026 |
| C | DETAILED CONSTRUCTION INC NYC DOB building permits | 7 | Structural · STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB # B01061260-I1 No product keyword matched | 0 | Jan 8, 2026 |
| C | GREENWICH HOUSE NYC DOB building permits | 7 | Plumbing · GAS PLUMBING WORK ASSOCIATED WITH NEW HOT WATER STORAGE TANK FOR BOILERS (BOILERS FILED SEPARATELY) AND NEW GAS LINES FOR NEW BOILERS AND EXISTING GAS KILNS. No product keyword matched | 0 | Jan 8, 2026 |
| C | G.B.C. CORPORATION NYC DOB building permits | 7 | Mechanical Systems · Hereby filing to install new mechanical units with associated ductwork for restaurant renovation as shown on plans filed herewith. No change to use, occupancy or egress. No product keyword matched | 0 | Jan 8, 2026 |
| C | L.W. Curly Colorado Colorado LLC NYC DOB building permits | 7 | Mechanical Systems · MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jan 8, 2026 |
| C | BRONX CAPITAL A LLC NYC DOB building permits | 7 | Structural · Proposed work in Basement - Provide partition walls and door for new boiler room, Remove/Relocate Lally column and Provide exhaust in bathroom. Provide open porch in rear yard. Provide exhaust fan in bathroom. No change in use, occupancy or egress No product keyword matched | 0 | Jan 8, 2026 |
| C | CGJGCORP NYC DOB building permits | 7 | Boiler Equipment · THIS SUBSEQUENT FILING IS TO AMEND THE INITIAL BOILER APPLICATION AND UPDATE THE BOILER SPECIFICATIONS AS PER DOB BOILER DIVISION INSPECTOR COMMENTS. THE BOILER IS STEAM 15 PSI AND NOT WATER 125 PSI No product keyword matched | 0 | Jan 8, 2026 |
| C | Dime Community Bank NYC DOB building permits | 7 | Plumbing · GAS CONNECTION TO REPLACEMENT HVAC UNIT. No product keyword matched | 0 | Jan 8, 2026 |
| C | SHEFA SCHOOL NYC DOB building permits | 7 | Mechanical Systems · MECHANICAL ALT 2 APPLICATION IS FOR THE FITOUT OF THE 12TH FLOOR No product keyword matched | 0 | Jan 8, 2026 |
| C | TECHNE & ASSOCIATES INC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION TO EXISTING APARTMENT 12D. REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS, FIXTURES, AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jan 8, 2026 |
| C | EMERALD EMPIRE CONST CORP NYC DOB building permits | 7 | Structural · Perform repairs related to fire, smoke, water damage in the 1st floor kitchen. Restore the single-family dwelling to address all cited violations, including illegal conversions. Violation being corrected by this filing: ECB: 35668158H; DOB VIO25-00040 No product keyword matched | 0 | Jan 8, 2026 |
| C | INDALO 619 LLC NYC DOB building permits | 7 | Mechanical Systems · LEGAILIZE 2 SPLIT AC SYSTEMS. CONDESERS ON ROOF WITH AIR HANDLERS ON THE 3RD AND 4TH FLOORS. No product keyword matched | 0 | Jan 8, 2026 |
| C | FALCON HOLDING CORP NYC DOB building permits | 7 | General Construction · File renovation of of existing offce at 3FL as per plans , no change in use, egress or occupancy No product keyword matched | 0 | Jan 8, 2026 |
| C | MINAS CONSTRUCTION INC NYC DOB building permits | 7 | General Construction · Interior reno per plans 1) at 1st Fl. bathroom upgrade along with general construction at bedrooms; and 2) general construction at Basement living/dining area. No change in use, occupancy or egress No product keyword matched | 0 | Jan 8, 2026 |
| C | 119 E 38 STREET, LLC NYC DOB building permits | 7 | General Construction · EXISTING NON-COMPLYING MIX USED BUILDING AS PER C.O.O.#101934374-INTERIOR RENOVATION AT CELL, BAS, 1 FL. PARTIAL DEMO & NEW PARTITIONS AT CEL, BAS,1 FL. REPL. OF CONC, SLAB AT CEL, NEW DOORS, NEW GYP. BD. CEILING&FINISHES AS PER PLANS. New Exterior Work. No product keyword matched | 0 | Jan 8, 2026 |
| C | Downing Street Playgroup, INC. NYC DOB building permits | 7 | Boiler Equipment · INSTALL TWO (2) 275 GALLON ABOVEGROUND STORAGE TANKS. No product keyword matched | 0 | Jan 8, 2026 |
| C | Pure OBGYN NYC DOB building permits | 7 | General Construction · INSTALLATION OF AN AWNING OVER THE ENTRANCE. AWNING AREA: 120.25 SQ FT. NO CHANGE IN USE OR OCCUPANCY No product keyword matched | 0 | Jan 8, 2026 |
| C | UNITED HEBREW CEMETERY NYC DOB building permits | 7 | Antenna · MODIFICATION TO EXISTING VZW MONOPOLE # 500645929. REMOVE 6 ANTENNAS,9 RRH AND 1 CABINET. INSTALL 3 NEW ANTENNA AND 9 RRH. PROJECT IS AN ELIGIBLE FACILITIES REQUEST PERSUANT TO SEC 6409(a) OF THE SPE TRUM ACT SEE 47 CFR SEC 1.6. No product keyword matched | 0 | Jan 8, 2026 |
| C | 3516 NY LLC NYC DOB building permits | 7 | Plumbing · PROPOSED NEW PLUMBING FIXTURES FOR A EXISTING 6 STORY BUILDING. NB FILED UNDER 420139843. No product keyword matched | 0 | Jan 8, 2026 |
| C | SAPPHIRE PROPERTY MANAGEMENT NYC DOB building permits | 7 | General Construction · THIS APPLICATION IS FILED TO LEGALIZED AWNING AT FIRST FLOOR, NO CHANGE IN USE, OCCUPANCY AND AGRESS. No product keyword matched | 0 | Jan 8, 2026 |
| C | DEER CITY USA LLC NYC DOB building permits | 7 | Plumbing · INTERIOR RENOVATION OF EXISTING 3-STORY MIX USED BUILDING TO CURE ECB VIOLATIONS#35271462R,35202903Y,34831872X,34831871Y,35169319N,35169320K,35169321M,35169323X,35169324H,34817558R,35169322Y. SUPERSEDED JOB#321435014. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Jan 8, 2026 |
| C | GC RENOVATIONS INC NYC DOB building permits | 7 | Mechanical Systems · Direct replacement of roof HVAC unit reconnecting to existing utilities, ductwork and supports No product keyword matched | 0 | Jan 8, 2026 |
| C | ROUNDSQUARE BUILDERS NYC DOB building permits | 7 | Construction Fence · ERECT 8' HIGH PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING PROJECT No product keyword matched | 0 | Jan 8, 2026 |
| C | CHIMNEY DOCTORS OF AMERIC NYC DOB building permits | 7 | Mechanical Systems · INSTALL NEW CHIMNEY OFFSETS & SUPPORTS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 8, 2026 |
| C | Red Hook Crating, LLC NYC DOB building permits | 7 | Mechanical Systems · MECHANICAL WORK AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 0 | Jan 8, 2026 |
| C | GREEN CHILLI NYC DOB building permits | 7 | Plumbing · INSTALL COMMERCIAL KITCHEN COOKING EQUIPMENTS AND GAS VALVE FOR EXISTING STORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 8, 2026 |
| C | VALENTINE EXPRESS LLC NYC DOB building permits | 7 | Plumbing · FILING TO RESTORE TO LEGAL THREE FAMILY DWELLING. CAP AND REMOVE ILLEGAL GAS STOVE AND KITCHEN SINK. RELOCATE KITCHEN SINK, GAS STOVE AND 3 PC BATHROOM. RESCIND PARTIAL VACATE ORDER. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 8, 2026 |
| C | CONG CHASIDAY SQUARE NYC DOB building permits | 7 | General Construction · Application to replace concrete slab in the existing cellar and to address violation # 39025694H. No change in use, occupancy or exit. No product keyword matched | 0 | Jan 8, 2026 |
| C | Amazon Realty Group Llc NYC DOB building permits | 7 | Structural · STRUCTURAL WORK TYPE FOR RELATED NEW 19-STORY CAST-IN-PLACEFLAT SLAB REINFORCED CONCRETE BUILDING WITH CELLAR. Filed in conjunction with NB #121206569. No product keyword matched | 0 | Jan 8, 2026 |
| C | UNITED PARCEL SERVICES NYC DOB building permits | 7 | Mechanical Systems · MECHANICAL MODIFICATION TO DISTRIBUTION FACILITY AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 8, 2026 |
| C | LOYVETA CONSTRUCTION NYC DOB building permits | 7 | General Construction · CONV. FROM 2 TO 4 FAMILY, INCLUDING REMOVAL AND REPLACEMENT OF INTERIOR FINISHES AND FIXTURES INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: FLOORING, BASEBOARDS, APPLIANCES, CABINETS, DOORS, DOOR FRAMES AND HARDWARE. INST. OF NEW BULKHEAD No product keyword matched | 0 | Jan 8, 2026 |
| C | BLUE DRAFT CORPORATION NYC DOB building permits | 7 | General Construction · Minor General construction work as per plans No product keyword matched | 0 | Jan 8, 2026 |
| C | CALLEN-LORDE NYC DOB building permits | 7 | General Construction · Modification work to include floor repair on floors 3-6 as per plans. No change of use egress or occupancy. No product keyword matched | 0 | Jan 8, 2026 |
| C | 72-11 AMSTEL BOULEVARD REALTY, LLC NYC DOB building permits | 7 | Plumbing · Installation of new oil interceptor on first floor to an ambulance repair facility as per plans filed herewith. No product keyword matched | 0 | Jan 8, 2026 |
| C | 124 WEST 31ST STREET PARTNERSHIP NYC DOB building permits | 7 | General Construction · install concrete pad as shown on drawings filed herewith No product keyword matched | 0 | Jan 8, 2026 |