Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CSA PRESERVATION PARTNERS LLC NYC DOB building permits | 11 | Plumbing · INTERIOR RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 31 | Nov 10, 2026 |
| B |
| 11 |
Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED IS AT THE WEST 141ST STREET ELEVATION, THE BACK OF THE BUILDING, AND ON BOTH SIDES OF THE BUILDING COURTYARD ELEVATIONS. No product keyword matched |
| 129 |
| Nov 10, 2026 |
| B | JABBIE INDUSTRIES INCORP* NYC DOB building permits | 11 | Supported Scaffold · Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 20 | Nov 10, 2026 |
| B | JOHN EVAN CONTRACTING COR NYC DOB building permits | 11 | General Construction · new extension and replace and raise roof of existing house of worship No product keyword matched | 32 | Nov 10, 2026 |
| B | CLASSIC BUILDERS CORP NYC DOB building permits | 11 | Construction Fence · PROPOSED CONSTRUCTION FENCE FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 8 | Nov 10, 2026 |
| B | GIRON CONTRACTING INC NYC DOB building permits | 11 | Mechanical Systems · EXTENSION OF AN EXISTING FLUE SERVING EXISTING GAS FIRED HOT WATER HEATER AND BOILER. NO CHANGE OF USE OR EGRESS. No product keyword matched | 15 | Nov 10, 2026 |
| B | CANNON HILL CAPITAL PARTNERS, LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 27 | Nov 10, 2026 |
| B | LT PRO CONSTRUCTION INC NYC DOB building permits | 11 | Earth Work · Earthwork in conjuction with Foundation No product keyword matched | 62 | Nov 10, 2026 |
| B | ALLSTATE SPRINKLER LLC NYC DOB building permits | 11 | Sprinklers · Sprinkler modifications taking place on the 7th floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 4 | Nov 10, 2026 |
| B | IPS PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Commercial space interior renovation. Update existing kitchen exhaust, add new kitchen gas equipment & interior renovation as mark on the proposed plans. No product keyword matched | 9 | Nov 10, 2026 |
| B | TRUMP ORGANIZATION NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 10, 2026 |
| B | BEACH LANE MANAGEMENT NYC DOB building permits | 11 | General Construction · RENOVATION OF APARTMENT #13. WORK INCLUDES NEW PARTITIONS AND FINISHES. PLUMBING WORK TO BE FILED AS SUBSEQUENT FILING. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 12 | Nov 10, 2026 |
| B | J & G CONSTRUCTION SRVCS NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 82 | Nov 10, 2026 |
| B | SK DEVELOPMENT NYC DOB building permits | 11 | General Construction · General construction modifications taking place on the 7,8, 13-14 Construction/ 14-15 Marketing floors as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 20 | Nov 10, 2026 |
| B | PHOENIX SUTTON STR INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 137 | Nov 10, 2026 |
| B | WEST BRIGHTON BUILDER LLC NYC DOB building permits | 11 | General Construction · ALTCO FILED TO CONVERT THE EXISTING PERAMBULATOR ROOM TO NEW LAUNDRY ROOM, MAIL ROOM AND PACKAGE ROOM. NO CHANGE TO BUILDING BULK,STRUCTURAL WORK OR PARTIAL DEMOLITION UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 10, 2026 |
| B | NY BUILDING ASSOCIATES IN NYC DOB building permits | 11 | General Construction · GENERAL RENOVATION OF 1-FAMILY HOUSE WITH REPAIR/REMOVE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW AND PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 42 | Nov 10, 2026 |
| B | ANDAMIO SCAFFOLDING LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 167 | Nov 10, 2026 |
| B | PARK MANAGEMENT USA CORP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF A TEMPORARY WOODEN CONSTRUCTION FENCE No product keyword matched | 7 | Nov 10, 2026 |
| B | NYC SCA NYC DOB building permits | 11 | Plumbing · PLUMBING REPAIRS AT CELLAR No product keyword matched | 253 | Nov 10, 2026 |
| B | Yellowstone Real Estate NYC DOB building permits | 11 | General Construction · ALT APP FILED HEREWITH TO SHOW THE TEMP FIRE-RATED ENCLOSURE AROUND A TEMP INT SYSTEM STAIR SERVING AS A SECOND MEANS OF EGRESS. SCOPE TO INCLUDE NEW PARTITIONS & DOORS. SYSTEM STAIR TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN OCCUPANCY OR USE. No product keyword matched | 16 | Nov 10, 2026 |
| B | AMERICAN STANDARD P&H COR NYC DOB building permits | 11 | Plumbing · GENERAL RENOVATION OF 2-FAMILY HOUSE WITH REPLACE/RELOCATED/NEW PLUMBING FIXTURES AND BOILER AND H.W.H. AS PER PLAN. AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 92 | Nov 10, 2026 |
| B | XINOS CONSTRUCTION CORP NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 75 | Nov 10, 2026 |
| B | SAFEPIPE PLUMBING INC NYC DOB building permits | 11 | Plumbing · Subsequent filing for PL work type in conjunction with B01458586-I1. Install plumbing fixtures and pizz oven. No change in use, egress or occupancy. No product keyword matched | 13 | Nov 10, 2026 |
| B | NYC PARKS & RECREATION NYC DOB building permits | 11 | Structural · REDEVELOPMENT OF FLOOR BARRIER SYSTEM (STRUCTURAL WORK) PACKAGE 4. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 48 | Nov 10, 2026 |
| B | URBAN EDGE PROPERTIES NYC DOB building permits | 11 | General Construction · CONSTRUCTION OF A NEW RESTAURANT (CHICK-FIL-A) WITH ACCESSORY DRIVE THRU AS PER DRAWINGS FILED HEREWITH. No product keyword matched | 31 | Nov 10, 2026 |
| B | GUMLEY HAFT NYC DOB building permits | 11 | General Construction · RENOVATE APARTMENTS # 25. DEMOLITION OF INTERIOR PARTITION AND NEW PARTITION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 30 | Nov 10, 2026 |
| B | PYRAMID RESTORATION NY NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffolding for facade inspection/repairs. No product keyword matched | 87 | Nov 10, 2026 |
| B | DOUGLAS ELLIMAN NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 11 | Nov 10, 2026 |
| B | BREEZY POINT COOPERATIVE, INC. NYC DOB building permits | 11 | General Construction · Skylight over Bathroom No change to use or occupancy No product keyword matched | 36 | Nov 10, 2026 |
| B | PLBG P & H INC NYC DOB building permits | 11 | Plumbing · 3-Piece Bathroom in Basement No product keyword matched | 20 | Nov 10, 2026 |
| B | PRAT ENTERPRISES CORP NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 101 | Nov 10, 2026 |
| B | Home NYC DOB building permits | 11 | Mechanical Systems · APPLICATION IS FILED IN DIRECT RESPONSE TO ECB VIOLATION #39157623P WHICH INCLUDES THE RECONNECTION OF TWO CONDENSER UNITS AT THE EXTERIOR OF THE RESIDENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 10, 2026 |
| B | 59 MAIDEN LANE ASSOCIATES, LLC NYC DOB building permits | 11 | General Construction · Interior office buildout on 15th and new accessory tenant fitness center on ground floor. No change in use, occupancy, or egress. No product keyword matched | 39 | Nov 10, 2026 |
| B | RIVERCREST REALTY ASSOCIATES NYC DOB building permits | 11 | General Construction · HEREWITH FILING ARCHITECTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 10, 2026 |
| B | ORBIT PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · PLUMBING MODIFICATION AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 39 | Nov 10, 2026 |
| B | APEX GROUP NY CORP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS . NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 79 | Nov 10, 2026 |
| B | ORSID NY NYC DOB building permits | 11 | General Construction · GENERAL CONSTRUCTION PERTAINING TO INSTALLATION OF NEW GAS FIRED & ELECTRIC WATER HEATERS, STORAGE TANKS, BOOSTER PUMPS, AND HOUSE PUMPS. INSTALLATION OF NEW DOMESTIC WATER LINES FROM CELLAR TO ROOF. NO CHANGE IN EGRESS OR OCCUPANCY. No product keyword matched | 12 | Nov 10, 2026 |
| B | SAMUEL & SONS P & H INC NYC DOB building permits | 11 | Plumbing · Plumbing work in the Cellar in association with the ALT-2 filing No product keyword matched | 10 | Nov 10, 2026 |
| B | TOPLINE NYC INC. NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 21 | Nov 10, 2026 |
| B | EDMUND S. JOSEPH NYC DOB building permits | 11 | Construction Fence · TEMPORARY CONSTRUCTION FENCE No product keyword matched | 18 | Nov 10, 2026 |
| B | PRIME PIPING & HEATING IN NYC DOB building permits | 11 | Plumbing · PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01339817-I1 No product keyword matched | 19 | Nov 10, 2026 |
| B | THE ART STUDENTS LEAGUE OF N.Y. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY CUSTOM COLOR SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE CUSTOM COLOR SHED IS IN FRONT OF THE BUILDING AT WEST 57TH STREET ELEVATION. No product keyword matched | 3 | Nov 10, 2026 |
| B | MIDWOOD INVESTMENT & DEVELOPMENT NYC DOB building permits | 11 | Plumbing · Plumbing scope filed in conjunction with NB B00621504 No product keyword matched | 7 | Nov 10, 2026 |
| B | L&K PARTNERS, INC NYC DOB building permits | 11 | General Construction · Interior demolition on construction Floor 1,2, and Cellar as per plans filed herewith. No change in egress, use or occupancy. No product keyword matched | 9 | Nov 10, 2026 |
| B | RHY CONSTRUCTION LLC NYC DOB building permits | 11 | Mechanical Systems · Filing for new mechanical system (heating system, ventilation system, air-conditioning systems, associated ducts and piping) for entire building. No product keyword matched | 27 | Nov 10, 2026 |
| B | S3 CAPITAL PARTNERS NYC DOB building permits | 11 | Plumbing · Plumbing application filed in-conjunction with the alt. 1 application. No product keyword matched | 2 | Nov 10, 2026 |
| B | MOKEN HOME IMPROVEMENT NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR THE MINOR REPAIR OF MINOR FIRE DAMAGE ONE FAMILY DWELLING. ALSO INTERIOR RENOVATION OF A 2 STORY BUILDING AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 9 | Nov 10, 2026 |
| B | RYCO CAPITAL NYC DOB building permits | 11 | Plumbing · PLUMBING AND SPRINKLER WORKTYPE IN CONJUNCTION WITH BUILDING RENOVATION. No product keyword matched | 2 | Nov 10, 2026 |
| B | R&S ELITE CONSTRUCTION NYC DOB building permits | 11 | Construction Fence · Filing for the fence application in conjunction with the new stoop construction. The new stoop is approved by DOT under R.P.No:2678. No product keyword matched | 12 | Nov 10, 2026 |