Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ALLIANCE GENERAL CONSTRUCTION, CORP NYC DOB building permits | 9 | General Construction · REBUILD LEANING FRONT PARAPET WALL, AS SHOWN ON PLANS. No product keyword matched | 0 | Aug 10, 2026 |
| B | NEW PRIME GENERAL CONSTRU NYC DOB building permits |
| 9 |
General Construction · Partition removals and legalization of partition erection at the cellar. Filing to cure violation 39174792. No proposed changes to uses, egress or occupancy. No product keyword matched |
| 0 |
| Aug 10, 2026 |
| B | inz creation inc. NYC DOB building permits | 9 | General Construction · JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND COOKING EQUIPMENT, NEW FLOOR TILE AND NEW PAINT, INSTALL KITCHEN HOOD AND FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Aug 10, 2026 |
| B | ROYAL CONCRETE AND MASON* NYC DOB building permits | 9 | Structural · SIDEWALK VAULT RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | Aire Ancient Baths NYC DOB building permits | 9 | Structural · STRUCTURAL WORK FOR CELLAR VAULT WOOD FLOOR REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | IMPERIAL CONTRAC OF NYC C NYC DOB building permits | 9 | General Construction · FILE APPLICATION TO CORRECTVIOLATION ECB #039176658ZNO CHANGE IN BULK USE OR MEANSOF EGRESS OCCUPANCY MINOR CHANGE TO LAY OUT No product keyword matched | 0 | Aug 10, 2026 |
| B | CSG REALTY MANAGEMENT LLC NYC DOB building permits | 9 | Sprinklers · Sprinkler work type hereby filed subsequent to the Alt. CO application: B00924812-I1 No product keyword matched | 0 | Aug 10, 2026 |
| B | 4712 SMART LLC NYC DOB building permits | 9 | Plumbing · PLUMBING AND SPRINKLER WORK FOR A NEW 2-STORY 2-FAMILY HOUSE No product keyword matched | 0 | Aug 10, 2026 |
| B | Getty Realty Corp. NYC DOB building permits | 9 | General Construction · Application filed to replace Alt II 420807416 for the installation of Non Structural Replacement of Existing Canopy Facsia. No work proposed under this appplication. No change in use egress or occupancy is proposed under this application. No product keyword matched | 0 | Aug 10, 2026 |
| B | Eagle KW NYC DOB building permits | 9 | General Construction · To address OATH/ECB Violation # 39155066M. To remove illegal OUTSIDE SEATING STRUCTURE AT REAR OF BUILDING FOR DINING PURPOSES. No change in use, egress, or occupancy under this application. No product keyword matched | 0 | Aug 10, 2026 |
| B | Choice New York Management LLC NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffolds for facade repair & inspection. No product keyword matched | 0 | Aug 10, 2026 |
| B | Seward Park Housing Corp NYC DOB building permits | 9 | General Construction · ADA ramp installation as per plans. No change to use, egress, or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | THOMAS TARATKO NYC DOB building permits | 9 | Plumbing · REMOVE SECOND FLOOR KITCHEN. REVISE FIRST FLOOR KITCHEN AND BATHROOM FIXTURES. ADD GAS FIREPLACE ON FIRST FLOOR AND REMOVE BASEMENT SHOWER. No product keyword matched | 0 | Aug 10, 2026 |
| B | GP Vernon LLC NYC DOB building permits | 9 | Construction Fence · ERECTION OF TEMPORARY CONSTRUCTION FOR DEMOLITION No product keyword matched | 0 | Aug 10, 2026 |
| B | M1B LLC NYC DOB building permits | 9 | Construction Fence · PROPOSED TEMPORARY 8' PLYWOOD CONSTRUCTION FENCE No product keyword matched | 0 | Aug 10, 2026 |
| B | Astor Place Holding Co. c/o C&W NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL MODIFICATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY, No product keyword matched | 0 | Aug 10, 2026 |
| B | JNP SERVICE CENTER CORP NYC DOB building permits | 9 | Mechanical Systems · FILING FOR THE INSTALLATION OF TWO NEW HVAC SPLIT UNIT SYSTEMS AND TWO CEILING MOUNTED ERV UNITS. No product keyword matched | 0 | Aug 10, 2026 |
| B | LC FULTON REALTY LLC NYC DOB building permits | 9 | General Construction · RENOVATION OF EXIST. MIXED USE HOUSE, REPAIR/REPLACE PARTITION, DOOR, CEILING, FLOOR, STAIR, PAINTING, WINDOW, SKYLIGHT, CORNICE, ROOF AS PER PLAN. TO ADDRESS DOB VIOLATION #26-00572; #CER04JL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | FAR ROCKAWAY CATHEDRAL NYC DOB building permits | 9 | General Construction · New Building for Brunswick Shelter for Adult Families (UG# 5 Transient Hotel, 3-story with cellar). Development HUB Consultation Accepted on April 8, 2022. No product keyword matched | 0 | Aug 10, 2026 |
| B | Simply Sliders LLC NYC DOB building permits | 9 | Plumbing · install a new gas meter and gas kitchen equipment, toilet, lavatory, hand sink and 3 compartment sink. No product keyword matched | 0 | Aug 10, 2026 |
| B | SHASHI CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · Filed for non-structural renovation of existing unconditioned detached garage. No product keyword matched | 0 | Aug 10, 2026 |
| B | Evergreen Peak LLC NYC DOB building permits | 9 | General Construction · INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR COMMERCIAL TENANT SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Aug 10, 2026 |
| B | CLOVER AIR DESIGN LLC NYC DOB building permits | 9 | Mechanical Systems · Provide new VRF heat pump system for existing apartment. No change in use or egress. No product keyword matched | 0 | Aug 10, 2026 |
| B | CITY SKYLINE NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT 3B ON 3RD FLOOR AS PER PLANS SUBMTTED. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | LC THREE NYC DOB building permits | 9 | General Construction · Facade repairs(excluding the 3rd and 5th floors), including marble column replacement, selective limestone and granite repairs, stucco repairs, and localized metal restoration. No change in use, egress or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | EDWARD PITRE NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | 212 HVAC LLC NYC DOB building permits | 9 | Mechanical Systems · Filing herewith to relocate existing HVAC along the roof. No change in use, egress or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | NORTHEASTERN CONFERENCE OF SEVENTH NYC DOB building permits | 9 | Antenna · Carrier: VZW. Install (12) new antennas, (12) new RRH units on new kickbacks on the roof. (4) new exterior cabinets on new platform on the roof. All work is in conformance with TPPN #5/98. No change in use, egress, or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | Bianca USA Real Estate, Inc. NYC DOB building permits | 9 | Mechanical Systems · MECH WORK TO REPLACE THE ROOFTOP UNIT WITH NEW ,OBTAIN EQUIPMENT USEPERMIT / LETTER OF COMPLIANCE,NO CHANGE IN USE , EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 10, 2026 |
| B | BBQ Shack NYC DOB building permits | 9 | Plumbing · FILING FOR THE COOKING EQUIPMENTS AND THE EXISTING FIRE SUPPRESSION SHUT OFF AND EXISTING WATER HEATER IN RESTAURANT AS SHOWN IN DRAWING. THERE IS NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Aug 10, 2026 |
| B | IDF DEVELOPMENT LLC NYC DOB building permits | 9 | Curb Cut · BUILDING A 10.00 FT. CURB CUT INCLUDING 2-1.50 FT SPLAYS, AND LOCATED ON THE NORTH SIDE OF 125TH. AVENUE DISTANT 267.62 FT. WEST OF THE INTERSECTION OF 125TH. AVENUE AND MERRICK BOULEVARD. No product keyword matched | 0 | Aug 10, 2026 |
| B | 94TH & 95TH STREET JH, LLC NYC DOB building permits | 9 | Plumbing · GAS CONNECTION TO REPLACEMENT GAS/OIL BURNER. No product keyword matched | 0 | Aug 10, 2026 |
| B | CIBOR CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · Alt-2 for minor non-bearing partition work, legalize conditions as per ECB Violations including, legalize 3-piece bathroom in cellar (X00403085), deck at rear, removal of unsafe storage of combustible materials, and lift partial vacate as per plans. No product keyword matched | 0 | Aug 10, 2026 |
| B | SAM VONA NYC DOB building permits | 9 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING MINOR EXTERIOR WORK (BRICK REPOINTING). SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Aug 10, 2026 |
| B | PLP CONTRACTING, INC. NYC DOB building permits | 9 | Structural · Structural steel reinforcement of partial sub-cellar and cellar vault No product keyword matched | 0 | Aug 10, 2026 |
| B | ADVANCED LAND & DEVELOPME NYC DOB building permits | 9 | Construction Fence · Installation of 8-0 high green/ wood construction fence as per NYC building code. In conjunction with altII# 520324667, 500688801, 500688785 house #15,19. .No changes to use/ egress and or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | USA Northeast Province of the Socie NYC DOB building permits | 9 | General Construction · EXTERIOR MASONRY & ROOF REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THISAPPLICATION. No product keyword matched | 0 | Aug 10, 2026 |
| B | HELLMAN ELECTRIC CORP NYC DOB electrical permits, NYC DOB building permits | 9 | Foundation · Installation of steel dunnage platform with electrical charging equipment on grade. Installation of 15 electric vehicle charging stations on grade with related conduits. No change in use, egress or occupancy. No product keyword matched | 0 | Aug 10, 2026 |
| B | WITH PRIDE AIR CONDITIONI NYC DOB building permits | 9 | Mechanical Systems · Provide Heating and Air Conditioning system for Cellar first and second floors as per plans filed No product keyword matched | 0 | Aug 10, 2026 |
| B | RGF ELECTRIC CORP NYC DOB electrical permits | 9 | Temporary 400AMP Service No product keyword matched | 0 | Aug 10, 2026 |
| B | AFFORDABLE ELECTRICAL NYC DOB electrical permits, Seattle electrical permits | 9 | Outside 110V outlet · Electrical No product keyword matched | 0 | Aug 10, 2026 |
| B | PURCELL ELEC'L CONTRS LTD NYC DOB electrical permits | 9 | Whole house rewiring. No product keyword matched | 0 | Aug 10, 2026 |
| B | TRIAC ELECTRIC INC NYC DOB electrical permits | 9 | General wiring on 10A & 11 A No product keyword matched | 0 | Aug 9, 2026 |
| B | RONART ELECTRIC CO NYC DOB electrical permits | 9 | install wiring for lights, switches and power No product keyword matched | 0 | Aug 9, 2026 |
| B | C.J.H.ELECTRIC INC NYC DOB electrical permits | 9 | Installing One 200 amp three phase meter pan and one 200 amp three phases main breaker panel No product keyword matched | 0 | Aug 8, 2026 |
| B | MANHATTAN CABINETS, INC NYC DOB building permits | 9 | General Construction · IN UNIT 9A ON 9TH FLOOR, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Aug 7, 2026 |
| B | GREEN HOUSE TOWN CORP NYC DOB building permits | 9 | General Construction · To erect new 9 story commercial building. No product keyword matched | 0 | Aug 7, 2026 |
| B | BROOKFIELD PROPERTIES OPERATED BY C NYC DOB building permits | 9 | Sign · REPLACE 2 ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR OMEGA. No product keyword matched | 0 | Aug 7, 2026 |
| B | JR Properties, Ltd NYC DOB building permits | 9 | Plumbing · interior renovation of existing apartment No product keyword matched | 0 | Aug 7, 2026 |
| B | RONG MAINTENANCE INC NYC DOB building permits | 9 | General Construction · PROPOSE INTERIOR RENOVATION TO AN EXISTING 2-STORY 3 FAMILY RESIDENTIAL BUILDING. NO CHANGE TO EXISTING USE, BULK, AND EGRESS. No product keyword matched | 0 | Aug 7, 2026 |