Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | NJS REALTY LLC NYC DOB building permits | 10 | General Construction · Installation of a drinking fountain and cosmetic repairs including acoustical ceiling tile replacement, floor tile replacement and painting. No product keyword matched | 1 | Aug 18, 2026 |
| B | FIRST F & L REALTY LLC. |
| 10 |
General Construction · NEW ACCESS STAIR TO EXISTING PLATFORM FILED UNDER GC #B00835125-I1 AS PER DRAWINGS FILED HEREIN. STRUTURAL WORK FILED UNDER SUBSEQUENT APPLICATION #B01284901-S1. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION No product keyword matched |
| 1 |
| Aug 18, 2026 |
| B | FLAG-CLEAN ISLAND LTD NYC DOB building permits | 10 | General Construction · REPAIR DAMAGED STOREFRONT & FACADE BRICKS AS PER PLANS No product keyword matched | 1 | Aug 18, 2026 |
| B | GLOBAL MONTELLO GROUP NYC DOB building permits | 10 | Boiler Equipment · Closure in place of existing (1) 1,000 gal. underground fuel oil storage tank. No change to use, egress or occupancy. (NO EXCAVATION REQUIRED FOR CLOSE IN PLACE). No product keyword matched | 1 | Aug 18, 2026 |
| B | M DADDIO INC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK TO EXISTING 2-FAMILY HOME. STEEL FRAMING TB SISTERED TO EXISTING JOISTS AS PER PLANS. WORK INCLUDES CONSTRUCTION OF A NEW HORIZONTAL EXTENSION AT REAR. No product keyword matched | 2 | Aug 18, 2026 |
| B | M POWER CONTRACTING CORP NYC DOB building permits | 10 | General Construction · Interior Renovations of Unit 6JN as per plans. No Change in Use, Egress or Occupancy. No product keyword matched | 1 | Aug 18, 2026 |
| B | 1951 NYC DOB building permits | 10 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | EL-ROC CONTRACTING OF BK NYC DOB building permits | 10 | Plumbing · Alterations to plumbing system on 33rd floor as per plans. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 18, 2026 |
| B | TITAN INDUSTRIAL SVC CORP NYC DOB building permits | 10 | Protection and Mechanical Methods · DEBRIS CHUTE AND MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH STRUCTURAL DEMOLITION: SKID STEER LOADER, TRACK LOADER, MINI LOADER, SCISSOR LIFT, BOOM LIFT, DEMO ROBOTS, AND MINI EXCAVATORS AS PER PLANS. No product keyword matched | 1 | Aug 18, 2026 |
| B | B.J. CONSTRUCTION OF NY NYC DOB building permits | 10 | Full Demolition · Legalization of a demolition of a garage. No product keyword matched | 1 | Aug 18, 2026 |
| B | SUNRISE SENIOR LIVING MANAGEMENT IN NYC DOB building permits | 10 | Mechanical Systems · REMOVE AND INSTALL HVAC EQUIPMENT IN 1ST AND 2ND FLOOR FOR RESIDENTIAL AMENITY SPACES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Aug 18, 2026 |
| B | BUILDERS-R-US CONSTRUCTIO NYC DOB building permits | 10 | Earth Work · CONSTRUCT NEW TWO(2) FAMILY RESIDENCE WITH TWO(2) ACCESSORY OPEN PARKING SPACES. No product keyword matched | 1 | Aug 18, 2026 |
| B | Roma construction and Restoration NYC DOB building permits | 10 | General Construction · VERTICAL EXTENSION OF AN EXISTING ONE-FAMILY RESIDENCE, INCLUDING INTERIOR RENOVATIONS. NO CHANGE OF USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Aug 18, 2026 |
| B | THE 640 WEST END AVENUE CONDOMINIUM NYC DOB building permits | 10 | Plumbing · Minor Plumbing work in existing apartment 11B on the 11th floor. work in the bathroom, powder room and kitchenette area only. Plumbing work only. No product keyword matched | 1 | Aug 18, 2026 |
| B | PEBBLE CONSTRUCTION INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 18, 2026 |
| B | LORD SHIVAS PROPERTIES LLC NYC DOB building permits | 10 | General Construction · Exterior repairs, window replacements, new 2nd and 4th floor north elevation window openings, and 2nd floor interior opening. No product keyword matched | 1 | Aug 18, 2026 |
| B | ROYAL RENOVATION CORP NYC DOB building permits | 10 | Support of Excavation · SUPPORT OF EXCAVATION WORK FOR THE NEW DEVELOPMENT. No product keyword matched | 2 | Aug 18, 2026 |
| B | THE CRYDER HOUSE INC. NYC DOB building permits | 10 | Antenna · Installation of new VERIZON site on the roof. Install 4 sectors (16 antennas) with associated parts, 8 RRH units, 3 GPS antennas and 1 equipment platform with 3 cabinets. Related conduits on the facade and service connection in the basement. No product keyword matched | 1 | Aug 18, 2026 |
| B | KRAMER PROPERTIES LLC NYC DOB building permits | 10 | Plumbing · REPLACE GAS LINE AND REGISTER RANGE/OVEN IN COMMERCIAL KITCHEN ON 1st FLOOR. No product keyword matched | 1 | Aug 18, 2026 |
| B | 3D CONSTRUCTION, INC NYC DOB building permits | 10 | General Construction · HORIZONTAL ENLARGEMENT OF AN EXISTING 1 FAMILY HOUSE IN TO 2FAMILY HOUSE. No product keyword matched | 1 | Aug 18, 2026 |
| B | M CONSTRUCTION NYC CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APARTMENT 10F THAT INCLUDES THE REMOVAL AND INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, WALL AND FLOOR FINISHES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | CLS PROPERTIES MANAGEMENT, INC. NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGER FOR FACADE REPAIR. No product keyword matched | 1 | Aug 18, 2026 |
| B | KING REALTY NY INC. NYC DOB building permits | 10 | General Construction · FILING TO CONVERT 1ST FLOOR OF EXISTING BUILDING FROM FACTORY TO CATERING ESTABLISHMENT (UG 13) AND PROPOSE 2ND FLOOR EXTENSION FOR COMMUNITY FACILITY (UG 4) No product keyword matched | 1 | Aug 18, 2026 |
| B | SSD INTERIOR INC NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 1 | Aug 18, 2026 |
| B | PLG Parkson Development NYC DOB building permits | 10 | Full Demolition · Full demolition to a one story building No product keyword matched | 1 | Aug 18, 2026 |
| B | 286 BROOME DS REALTY LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING RESTAURANT & CABARET SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 1 | Aug 18, 2026 |
| B | WINSTAR CONTRACTING INC NYC DOB building permits | 10 | Suspended Scaffold · PARAPET WALL REPLACEMENT INSPECTION No product keyword matched | 1 | Aug 18, 2026 |
| B | The New York Academy of Medicine NYC DOB building permits | 10 | General Construction · FILING HEREWITH FOR RAMP WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | Fifty Seventh 8th Realty NYC DOB building permits | 10 | Sprinklers · ALTERATION TO EXISTING SPRINKLER SYSTEM AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 1 | Aug 18, 2026 |
| B | Jemco Mechanical INC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK TO REPLACE FIXTURES IN APARTMENT #29 AT SIXTH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 1 | Aug 18, 2026 |
| B | Sheezan Corporation NYC DOB building permits | 10 | Structural · PROPOSED INT. RENO OF PARTIAL CEL & 1ST FL ONLY. WORK INCLUDES INSTALLATION OF NEW STAIR TO ACCESSORY STORAGE @EXISTING EATING & DRINKING ESTABLSHMNT TO ADDRESS VIOS: 39183429K, 39183428Z,39183427R, 39183426P & 39183425N TO REMOVE PARTIAL VACATE ORDER. No product keyword matched | 1 | Aug 18, 2026 |
| B | TS & TS CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · Interior renovations - combining apartments 14B and 14H. No change in use, egress, or occupancy. No product keyword matched | 1 | Aug 18, 2026 |
| B | JOLLY HOTELS USA, INC. NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD FROM THE TOP OF THE SIDEWALK SHED TO THE EAST ROOFTOP, NORTH 3RD FLOOR TERRACE, AND WEST, SOUTH NEIGHBOR TERRACE ELEVATIONS. No product keyword matched | 1 | Aug 18, 2026 |
| B | Manhattan Jewish student center inc NYC DOB building permits | 10 | General Construction · Interior alteration of an existing space to add bathroom. Minor partition work. No change to use egress or occupancy No product keyword matched | 1 | Aug 18, 2026 |
| B | Strive Charter School NYC DOB building permits | 10 | Plumbing · FILING HEREWITH PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | MESHBERG CAPITAL, INC. NYC DOB building permits | 10 | Mechanical Systems · RENOVATION OF EXISTING COMMERCIAL SPACE ON 1ST FLOOR. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 3 | Aug 18, 2026 |
| B | Ephoca NYC DOB building permits | 10 | Mechanical Systems · Proposed HVAC renovation of Apartment 53C in conjunction with job #M01343604-I1. No change in use, egress, or occupancy. No product keyword matched | 1 | Aug 18, 2026 |
| B | TRE GIOVANNI NYC DOB building permits | 10 | Plumbing · Revised Gas riser diagram to show all existing fixtures 2 HVAC Units and Hot Water Heater for gas test. No new installation or work No product keyword matched | 1 | Aug 18, 2026 |
| B | WASOFF PLBG. & UTL.CO INC NYC DOB building permits | 10 | Boiler Equipment · REPLACE EXISTING 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER (NYC DOB BOILER #: 170510-01) WITH NEW 10 HP OIL-FIRED HIGH PRESSURE STEAM BOILER AT EXISTING BOILER ROOM AT CELLAR AS PER PLAN. No product keyword matched | 1 | Aug 18, 2026 |
| B | JM Williamsburg Property Group NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF 1ST AND 2ND FLOORS INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | MESA CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · General construction to include interior renovation and minor demo as per plans No product keyword matched | 2 | Aug 18, 2026 |
| B | First Key Properties LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATIONS AT APARTMENT 3G. NO CHANGE TO USE OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | VALIANT DESIGN BUILD INC NYC DOB building permits | 10 | Mechanical Systems · Mechanical demo as shown on plans No product keyword matched | 1 | Aug 18, 2026 |
| B | EXINTERIOR LLC NYC DOB building permits | 10 | General Construction · FILING FOR SELECTIVE RENOVATION OF AN EXISTING ENTRY FACADE A MULTI-FAMILY RESIDENCE. MINOR ARCHITECTURAL WORK PROPOSED AS PER PLANS. NO CHANGE OF USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. NO STRUCTURAL CHANGES TO FACADE. No product keyword matched | 1 | Aug 18, 2026 |
| B | COMMERCIAL BDG REST. INC NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as shown on plans No product keyword matched | 1 | Aug 18, 2026 |
| B | LUIS M. FIGUEROA NYC DOB building permits | 10 | Plumbing · INSTALLING NEW COOKING EQUIPMENT AND PLUMBING FIXTURES IN EXISTING DELI/GROCERY STORE AS PER PLANS. ALSO REPLACING OLD METER BARS WITH NEW, REPLACING GAS PIPING WHERE NEEDED AND REPAIRING GAS LEAK AS NEEDED. NO CHANGE IN USE, EGRESS OR OCCUPANC No product keyword matched | 1 | Aug 18, 2026 |
| B | RADESH ROTI SHOP & BAKERY, INC. NYC DOB building permits | 10 | Plumbing · Install additional commercial cooking equipment (fryer) in the existing eating & drinking establishment as per the submitted drawing. No product keyword matched | 1 | Aug 18, 2026 |
| B | NMK CABINETRY INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | Ken ring LLc NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AT BEAUTY SALON OF EXISTING 4-STORY BUILDING WITH GENERAL CONSTRUCTION WORK, ADDRESS VIO. # 35580797H, 35580798J, 35580796X,35666514X, 35666515H, 35679379P, 35679380M,39166803R, 35725682M, 35725683Y, 35725684X, ANDVACATE ORDER 4984179. No product keyword matched | 1 | Aug 18, 2026 |
| B | 36-09 Realty LLC NYC DOB building permits | 10 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |