Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SUPERIOR REALTY GROUP , LLC NYC DOB building permits | 10 | Antenna · Modification to existing VERIZON site on the roof. Install 6 antennas, 3 RRH units, 3 OVP's, 2 GPS antennas and 1 equipment platform w/ cabinets. Relocate 2 GPS antennas & 1 antenna. Replace 1 antenna & 4 RRH units. Remove 1 antenna and 1 cabinet. No product keyword matched | 1 | Aug 19, 2026 |
| B |
| PROPERTY4319LLC@OUTLOOK.COM NYC DOB building permits |
| 10 |
Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched |
| 1 |
| Aug 19, 2026 |
| B | SUPERSTARS CONTRACTING I* NYC DOB building permits | 10 | General Construction · Repair of spalled limestone units at the North elevation water table. No product keyword matched | 1 | Aug 19, 2026 |
| B | STATIC CONSTRUCTION INC. NYC DOB building permits | 10 | Sidewalk Shed · HEAVYDUTY SIDEWALK SHED FOR EXTERIOR REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 1 | Aug 19, 2026 |
| B | DUNCAN ROAD DEVELOPERS NYC DOB building permits | 10 | Curb Cut · Propose extension of existing curb to 17'-0 curb cut with (2) 1'-6 splays serving an existing one family dwelling. No product keyword matched | 1 | Aug 19, 2026 |
| B | THE HOLY TEMPLE CHURCH NYC DOB building permits | 10 | Supported Scaffold · Installation of temporary scaffold as work platform per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Aug 19, 2026 |
| B | 772 57TH STREET REALTY CORP NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW KITCHEN MECHANICAL EXHAUST SYSTEM FOR COMMERCIAL KITCHEN OF EATING AND DRINKING ESTABLISH, INCLUDING ONE (1) TYPE I HOOD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 1 | Aug 19, 2026 |
| B | Downtown Club NYC DOB building permits | 10 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE INSPECTION. No product keyword matched | 1 | Aug 19, 2026 |
| B | PAN LINK CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION @ BASEMENT AND 1ST FLOOR No product keyword matched | 1 | Aug 19, 2026 |
| B | 5010 REALTY LLC NYC DOB building permits | 10 | Sign · PROPOSED INSTALLATION OF 2 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGNS. FIRST SIGN FACING 50TH AVENUE WORDING VISION TAEKWONDO AND SECOND SIGN FACING 39TH STREET WORDING VISION TAEKWONDO No product keyword matched | 1 | Aug 19, 2026 |
| B | 38275 NYC DOB building permits | 10 | General Construction · REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 19, 2026 |
| B | LARAMIE DAWSON CORP NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Aug 19, 2026 |
| B | Pinley Mechanical Inc NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. No product keyword matched | 1 | Aug 19, 2026 |
| B | FR CONTRACTING CORP NYC DOB building permits | 10 | General Construction · APPLICATION FOR FACADE REPAIR WORK- MASONRY BRICKS LOSSENESS AT EXP#1 ON PARAPET WALL, LOOSE/DAMAGE COPPINGS STONE AND ALSO REPAIR COURTYARD EXPOSURE 2. COMPLY VIOLATION NO: VIO26-01428 / 060226C26-01428, 39190931L. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 1 | Aug 19, 2026 |
| B | REVONA PROPERTIES NYC DOB building permits | 10 | Boiler Equipment · REPLACE TWO GAS BOILERS AND REINSTALL THE EXISTING BURNERS. No product keyword matched | 1 | Aug 19, 2026 |
| B | BRANDT GENERAL CONSTRUCT NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING 2ND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 19, 2026 |
| B | JD MASTERS PLBG & HTG NYC DOB building permits | 10 | Plumbing · Propose to install plumbing fixtures as per plans filed herewith. No change in use egress occupancy is proposed under this application. No product keyword matched | 1 | Aug 19, 2026 |
| B | 90 Greene Street Condominium NYC DOB building permits | 10 | Mechanical Systems · Mechanical work on existing 2nd floor apartment unit. No change in bulk, use or occupancy under this application. No product keyword matched | 1 | Aug 19, 2026 |
| B | EIS ELECTRIC CORP DBA NYC DOB electrical permits | 10 | Electrical Work in Apt 6A - Electrical DEMO, TEMPORARY Power, General Wiring - Wire & Install New Panels, Receptacles, Switches & Fixtures No product keyword matched | 2 | Aug 19, 2026 |
| B | SEGURA CONTRACTING CORP NYC DOB building permits | 10 | General Construction · Restore cellar to original conditions, restore rear yard to original conditions remove side passageway erected at the side of the building. Application file to remove ECB-DOB Viol # 39027095P;35016715H;039039754H; 039039756L.39039755J.No change of C.of O. No product keyword matched | 1 | Aug 18, 2026 |
| B | Two Trees Management NYC DOB building permits | 10 | General Construction · Herewith filing for facade repairs. No change in egress, use or occupancy. No product keyword matched | 2 | Aug 18, 2026 |
| B | SHINE CONSTRUCTION & DEV NYC DOB building permits | 10 | General Construction · REPOINTING, BRICK REPLACEMENT & PARAPET WALL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | WJ PROFESSIONAL EXPEDITIN NYC DOB building permits | 10 | General Construction · FILING TO SUPERSEDE AND INCORPORATE ALL WORK PERFORMED UNDER DOB BIS # 140730207 AND SIGN OFF. INTERIOR REFURBISH, RECONDITION, REMODEL OF APARTMENT 5C LOCATED ON FIFTH FLOOR AS PER PROPOSED PLAN. No product keyword matched | 1 | Aug 18, 2026 |
| B | MANAGEMENT NYC DOB building permits | 10 | General Construction · FILING TO INDICATE WORK COMPLETED IN THE COMMERCIAL FIRST FLOOR AND AND CELLAR WITHOUT PERMIT. No product keyword matched | 1 | Aug 18, 2026 |
| B | SOCRATES COATING AND CON* NYC DOB building permits | 10 | General Construction · Filing to legalize the combination of the apartments 5B & 5C. The work was in its current layout was completed in 1980's. No change in use, egress or occupancy. The original kitchen at 5C was relocated and the kitchen at 5B was eliminated. No product keyword matched | 1 | Aug 18, 2026 |
| B | NEXT SOLUTIONS CITY CORP NYC DOB building permits | 10 | Structural · APPLICATION FILED TO RESTORE EXISTING ACCESSORY CELLAR TO PRIOR LEGAL CONDITION TO RESOLVE ECB VIOLATIONS ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Aug 18, 2026 |
| B | AFFINITY BUILDING SOLUTIO NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION TAKING PLACE ON THE 70TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | HOME EVOLUTIONS CORP NYC DOB building permits | 10 | General Construction · Emergency work to remove fire-damaged debris and associated work to construct a temporary wood-framed roof structure No product keyword matched | 1 | Aug 18, 2026 |
| B | INTER RENOVATION INC NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 1 | Aug 18, 2026 |
| B | CENTERPOINT PROPERTIES NYC DOB building permits | 10 | Mechanical Systems · REPLACE TWO HVAC UNITS. No product keyword matched | 1 | Aug 18, 2026 |
| B | VIACON,INC. NYC DOB building permits | 10 | Mechanical Systems · Filing plans herewith for the proposed Mechanical work related to the interior build-out of a Four Leaf Federal Credit Union Bank. No change to use, egress, or occupancy. No product keyword matched | 1 | Aug 18, 2026 |
| B | MARCAL CONTRACTING NYC DOB building permits | 10 | Plumbing · Plumbing and Sprinkler work related to the interior fit-out filed under Q01409928 No product keyword matched | 1 | Aug 18, 2026 |
| B | ALL-BORO REHAB CONSTRCT C NYC DOB building permits | 10 | General Construction · Converting existing Garage space into Accessory use Open Cellar . Obtaining new C/O with open accessory parking . and First Floor enlargement at rear. No product keyword matched | 1 | Aug 18, 2026 |
| B | Solstice Residential Groups LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION IN APT 416. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 18, 2026 |
| B | Realty Income NYC DOB building permits | 10 | Mechanical Systems · DIRECT REPLACEMENT OF MECHANICAL UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | B. WARRANTY HOME CONSTRUCTION INC. NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | HW CONSTRUCTION LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING RES 2-BED APARTMENT ON 2ND FL APT#2E, WITH NEW STORAGE CLOSET, MILLWORK, FIXTURES AND OTHER INTERIOR FINISHES. WORK WILL INCLUDE MINOR ELECTRICAL AND PLUMBING WORK. NO CHANGE OF EGRESS, USE, OR OCCUPANCY. NO EXTERIOR WORK. No product keyword matched | 1 | Aug 18, 2026 |
| B | SHAMAS CONTRACTING CO INC NYC DOB building permits | 10 | General Construction · REPLACEMENT IN KIND OF BATHROOM AND KITCHEN FIXTURES AND FINISHES. WINDOW AND DOOR REPLACEMENTS. OVERLAY SPRAY FOAM ROOF. EXTERIOR INSULATION FINISH SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Aug 18, 2026 |
| B | FRED SMITH P&H CO INC NYC DOB building permits | 10 | Plumbing · Install new gas BBQ at roof. Connect to existing gas pipe. Install new associated valve. Pressure test gas piping as required . Filing is to supersede LAA # M01389316-I1. No change to use, egress or occupancy proposed. No product keyword matched | 1 | Aug 18, 2026 |
| B | LAW OFFICE OF ALAN J. SASSON, PC NYC DOB building permits | 10 | Plumbing · PROPOSED REPLACING EXISTING AND ADD NEW PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 18, 2026 |
| B | ASM Realty Builders LLC NYC DOB building permits | 10 | General Construction · APPLICATION FILED FOR NEW 4 STORY NEW BUILDING AS PER PLANS HERE WITHIN. No product keyword matched | 1 | Aug 18, 2026 |
| B | JDS CONSTRUCTION GROUP LLC NYC DOB building permits | 10 | Protection and Mechanical Methods · Use of temporary suspended scaffold from building maintenance unit as per plans filed herewith. No product keyword matched | 1 | Aug 18, 2026 |
| B | LENOX HILL HOSPITAL NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH CHOATER 33 OF THE NYC BC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |
| B | CF-01 REALTY LLC NYC DOB building permits | 10 | Mechanical Systems · FILING FOR THE EXISTING KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | 1 HOTEL CENTRAL PARK NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS AND MATERIAL STORAGE. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | 4636 206 STREET LLC NYC DOB building permits | 10 | General Construction · VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O No product keyword matched | 2 | Aug 18, 2026 |
| B | ALB CONSTR GROUP LLC NYC DOB building permits | 10 | General Construction · PROPOSED MINOR ALTERATIONS CONSISITING OF REMOVAL OF NON-LOAD BEARING WALLS, NEW & REPLACED LIGHT FIXTURES & PLUMBING. ELECTRICAL & PLUMBING FILED UNDER SEPERATE APPLICAATION. No product keyword matched | 1 | Aug 18, 2026 |
| B | QUEENS COLLEGE NYC DOB building permits | 10 | General Construction · Installation of temp platform & tents, no alt to exist structures for the Annual Student Welcome Day. TPA permit required. Producer responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion No product keyword matched | 1 | Aug 18, 2026 |
| B | NSR II COMPANY INC NYC DOB building permits | 10 | Structural · THE PURPOSE OF THIS PROJECT IS TO CONVERT THE EXISTING BUILDING FROM ONE FAMILY & SRO TO TWO FAMILY BUILDING AND TO OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Aug 18, 2026 |
| B | LANCER CONSTRUCTION CORP NYC DOB building permits | 10 | Mechanical Systems · REPLACEMENT OF AN EXISTING PACKAGED INDOOR AC SYSTEM WITH A NEWSPLIT HVAC SYSTEM FOR AN EXISTING APARTMENT UNIT. NO CHANGE OF USE,EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 18, 2026 |