Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CHAND WHITE PLAINS LLC NYC DOB building permits | 10 | Plumbing · HEREWITH FILING FOR THE INSTALLATION OF NEW PLUMBING SYSTEM. No product keyword matched | 1 | Aug 19, 2026 |
| B | NEMAT HOMES NYC DOB building permits | 10 |
| 4 |
| Aug 19, 2026 |
| B | WAWEL PLBG AND HTG CORP NYC DOB building permits | 10 | Plumbing · Plumbing work filed in conjunction with apartment renovation of the third floor. No change in use, egress or occupancy No product keyword matched | 3 | Aug 19, 2026 |
| B | SECOND MACEDONIAN PENTECOSTAL CHURC NYC DOB building permits | 10 | Construction Fence · Construction Fence No product keyword matched | 1 | Aug 19, 2026 |
| B | 4632 PROPERTY LLC NYC DOB building permits | 10 | Mechanical Systems · PROPOSED MECHANICAL WORK FOR A NEW 2-FAMILY 2-STORY DETACHED HOUSE. No product keyword matched | 1 | Aug 19, 2026 |
| B | DIVCOWEST NYC DOB building permits | 10 | Sprinklers · Sprinkler modifications taking place on 37C/38M and 38C/39M as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Aug 19, 2026 |
| B | FBHC NYC DOB building permits | 10 | General Construction · REPLACE CRACKED/LOOSE STUCCO AS SHOWN ON PLANS TO ADDRESS ECB VIOLATION # 39116476N. No product keyword matched | 2 | Aug 19, 2026 |
| B | VITELLO SEWER W.M H&P SER NYC DOB building permits | 10 | Plumbing · APPLICATION FILED FOR (1) NEW 2-PIECE BATHROOM AT ATTIC LEVEL. No product keyword matched | 1 | Aug 19, 2026 |
| B | REALTERM LOGISTICS NYC DOB building permits | 10 | Plumbing · INSTALL NEW GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Aug 19, 2026 |
| B | PARK EQUITIES LLC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work as per plans filed. Subsequent filing to Alt CO #X00890768. No product keyword matched | 2 | Aug 19, 2026 |
| B | PETER YOLLES PRODUCTIONS NYC DOB building permits | 10 | Sprinklers · PLUMBING AND SPRINKLER SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION ALT. 1 BIS APPLICATION. No product keyword matched | 1 | Aug 19, 2026 |
| B | FERNANDOD ALFONSO NYC DOB building permits | 10 | Plumbing · SUBSEQUENT APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH JOB #:B00808220-I1. REPLACING ONE LAV, ONE WC. INSTALLING NEW: ONE LAV, ONE WC. REMOVAL OF EXISTING MECHANICAL HOOD AND ALL GAS PIPING TO BE REMOVED. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Aug 19, 2026 |
| B | JEANS MANAGEMENT NYC DOB building permits | 10 | General Construction · EXTERIOR REPAIRS: REPOINT DETERIORATED MORTAR JOINTS, REPLACE CRACKED BRICK, REPAIR/REPLACE PRECAST CONCRETE WINDOWSILLS, AND REPAIR EXTERIOR COATING AS PER DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 19, 2026 |
| B | BROOKFIELD NYC DOB building permits | 10 | Plumbing · Hereby filing to install new plumbing fixtures and related piping for retail space as shown on drawings filed herewith. No change to use, occupancy or egress. No product keyword matched | 1 | Aug 19, 2026 |
| B | LAND & SHORE CREATIVE LLC NYC DOB building permits | 10 | Foundation · Concrete footings for new deck. The deck is filed under separate application. No change in use, egress or occupancy. No product keyword matched | 1 | Aug 19, 2026 |
| B | BEYOND COOLING LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW HEATING AND COOLING SYSTEM FOR THE ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 1 | Aug 19, 2026 |
| B | THE METROPOLITAN OPERA NYC DOB building permits | 10 | Supported Scaffold · FILING FOR TEMPORARY STRUCTURE - SCAFFOLD STRUCTURE FOR TPA EVENT - METROPOLITAN OPERA ASSOCIATION, HD SUMMER FESTIVAL 2026. STRUCTURE WILL BE REMOVED UPON COMPLETION OF EVENT. No product keyword matched | 1 | Aug 19, 2026 |
| B | SHC EQUITIES NYC DOB building permits | 10 | Foundation · Existing one family dwelling to be horizontally and vertically enlarged and converted into a two family dwellings. New drywall partitions ,and plumbing fixtures as per plans. . Filed hereby to answer ECB violations number 39028367Y and 35536181L . No product keyword matched | 1 | Aug 19, 2026 |
| B | MIKEROSE LLC NYC DOB building permits | 10 | Plumbing · PLUMBING APPLICATION FILED FOR INCOMING SEWER RELATED WORK - SITE CONNECTION DEP (SD1-2) - UTILITY IN OSP. No product keyword matched | 1 | Aug 19, 2026 |
| B | 4IR IDEAL INC NYC DOB building permits | 10 | Mechanical Systems · Replacement of air conditioning units. No change in use egress and occupancy. No product keyword matched | 1 | Aug 19, 2026 |
| B | DISTRICT COUNCIL 37 NYC DOB building permits | 10 | Plumbing · Plugging of existing 6 fire sprinkler service for future sprinkler system connection. No product keyword matched | 1 | Aug 19, 2026 |
| B | CHEGET LLC NYC DOB building permits | 10 | Supported Scaffold · Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Aug 19, 2026 |
| B | Meserole Lorimer Realty LLC NYC DOB building permits | 10 | Full Demolition · Full demolition to a five story building No product keyword matched | 1 | Aug 19, 2026 |
| B | KANO REI NYC DOB building permits | 10 | Mechanical Systems · Mechanical work associate with new building. No product keyword matched | 1 | Aug 19, 2026 |
| B | THE JEWISH HERITAGE SUPPORT FUND NYC DOB building permits | 10 | Plumbing · plumbing filed herewith in conjunction with Alt#322037924 no change in use occupancy or egress under this application No product keyword matched | 1 | Aug 19, 2026 |
| B | SEVENTH FLOOR SERVICES * NYC DOB building permits | 10 | Structural · FACADE REPAIR TO ADDRESS VIOLATIONS 061626C26-01574, 39192609M No product keyword matched | 1 | Aug 19, 2026 |
| B | JUILLIARD SCHOOL NYC DOB building permits | 10 | Suspended Scaffold · Installation of IRA during facade inspection. No product keyword matched | 1 | Aug 19, 2026 |
| B | MSH EQUITIES LLC NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Aug 19, 2026 |
| B | NOCOR MANAGEMENT CORP NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF HEAVY-DUTY SIDEWALK SHED FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE No product keyword matched | 1 | Aug 19, 2026 |
| B | Cristin Tierney Gallery NYC DOB building permits | 10 | Plumbing · Relocated/Replaced bathrooms and fixtures to conform to proposed architectural layout. No product keyword matched | 1 | Aug 19, 2026 |
| B | off white corp NYC DOB building permits | 10 | Sprinklers · Sprinkler application file subsequently to the alt. CO application. remove and install new sprinkler head on cellar and first floor. No product keyword matched | 2 | Aug 19, 2026 |
| B | ST. HILDA'S & ST. HUGH'S SCHOOL NYC DOB building permits | 10 | General Construction · Filing for facade renovation. Work includes partial removal of precast concrete facade panels and replacement with new GFRC facade panels. No change to use, egress, or occupancy. No product keyword matched | 1 | Aug 19, 2026 |
| B | MOGR CONSULTING INC NYC DOB building permits | 10 | General Construction · Interior renovation throughout existing 3 story building No product keyword matched | 2 | Aug 19, 2026 |
| B | TROUT RECORDING NYC DOB building permits | 10 | Plumbing · THE PURPOSE OF THIS PROJECT IS TO PROVIDE PLUMBING WORK AS PER PLANS IN CONJUNCTION WITH DOB NOW APPLICATION # B00983824-I1 No product keyword matched | 1 | Aug 19, 2026 |
| B | Bnos Chaya School NYC DOB building permits | 10 | General Construction · Installation of steel stair and CMU wall in the open yard. No change in use, egress, or occupancy. Filing to address WWP violation #39195222L and resolve audit from FSWO #5197569. No product keyword matched | 1 | Aug 19, 2026 |
| B | MRW ASSOCIATES INC NYC DOB building permits | 10 | Full Demolition · Application filed for full demolition of the existing house by using handheld equipment. No product keyword matched | 1 | Aug 19, 2026 |
| B | MID QUEENS LP NYC DOB building permits | 10 | Structural · STRUCTURAL REINSFORCMENT FILED IN CONJUNCTION WITH ANTENNA APPLICATION # Q01281815-I1 No product keyword matched | 1 | Aug 19, 2026 |
| B | CONNECTED USA LLC NYC DOB building permits | 10 | General Construction · General construction as per plans filed herewith. No change to use, bulk, egress, or occupancy. No product keyword matched | 1 | Aug 19, 2026 |
| B | 499 ATLANTIC AVENUE BROOKLYN REALTY NYC DOB building permits | 10 | General Construction · EXISTING 3 STORY MIX-USED BUILDING INTERIOR RENOVATION THROUGHOUT AS PER PLAN. NO CHANGE IN USE BULD OR EGRESS. No product keyword matched | 1 | Aug 19, 2026 |
| B | BAY RIDGE WINDOWS & DOORS NYC DOB building permits | 10 | General Construction · FACADE WORK TO RESOLVE EXISTING LANDMARK VIOLATIONS 00/0710 AND 00/0713. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 19, 2026 |
| B | TJ CONSTRUCTION SERVICES NYC DOB building permits | 10 | Mechanical Systems · Horizontal extension of existing two-family house and propose professional office at first floor No product keyword matched | 1 | Aug 19, 2026 |
| B | POLER CONSTRUCTION INC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work as shown on plans filed herewith. Demolish existing mechanical ductwork and ac unit. Provide split system and provide associated ductwork, piping, and diffusers. Provide electric heaters where indicated. No product keyword matched | 2 | Aug 19, 2026 |
| B | ASSEMBLY OF PENTESCOSTAL CHURCH NYC DOB building permits | 10 | Plumbing · TO PROPOSE PLUMBING WORK FOR EXISTING CHURCH AT CELLAR AND 001 FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE OF USE,EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Aug 19, 2026 |
| B | REMICA PROPERTY GROUP CORP NYC DOB building permits | 10 | General Construction · CVS Retail Tenant space minor general renovation. Minor plumbing, mechanical and energy lighting work to be filed subsequently. No change to use, egress or occupancy. No product keyword matched | 3 | Aug 19, 2026 |
| B | CDC CUSTOM DESIGN & DIME* NYC DOB building permits | 10 | General Construction · REPAIR EXTERIOR COVERED PORCH TO CURE VIOLATION #39134715K No product keyword matched | 2 | Aug 19, 2026 |
| B | ERGUL CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · HEREBY FILING APT 5B REMOVAL OF ILLEGAL PARTITIONS WORK TO CLOSE OUT WWP VIOLATION 010810CERJM02. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 19, 2026 |
| B | SERVICE SIGNS LLC NYC DOB building permits | 10 | General Construction · INSTALL (2) EXTERIOR GOOSENECK LIGHT FIXTURES ABOVE EXISTING ACCESSORY WALL SIGN: SAATVA (M00876367). NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 19, 2026 |
| B | Lowe's NYC DOB building permits | 10 | Mechanical Systems · MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC REPLACEMENT ON EXISTING DUNNAGE. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Aug 19, 2026 |
| B | DRURY & LANE LLC NYC DOB building permits | 10 | General Construction · PROPOSED INTERIOR RENOVATION, REMOVAL OF NON LOAD BEARING PARTITIONS, NEW PARTITIONS AND FINISHES AS PER PLANS, WORK AT PART OF 3rd FLOOR (UNIT 3C), NO CHANGE IN USE, OCCUPANCY OR EGRESS, PLUMBING AND MECHANICAL TO BE FILED AS SUBSEQUENT APPLICATION No product keyword matched | 1 | Aug 19, 2026 |
| B | UNIPRES CORP NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION & STRUCTURAL WORK TO RE-POINT & REPAIR PORTIONS OF EXISTING DAMAGED FACADE & REPLACE EXISTING WINDOW LINTELS AT EXTERIOR ONLY. No product keyword matched | 1 | Aug 19, 2026 |