Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SPEEDWAY PLUMBING CORP Austin issued construction permits, NYC DOB building permits | 10 | Plumbing · plumbing changes from 3rd floor to 6th floor. No product keyword matched | 1 | Aug 20, 2026 |
| B | EXPEDITING SERVICES NZNY LLC NYC DOB building permits |
| 10 |
General Construction · NEW FOUR (4) STORY COMMUNITY FACILITY BUILDING No product keyword matched |
| 1 |
| Aug 20, 2026 |
| B | RV ENTERPRISE INC NYC DOB building permits | 10 | Curb Cut · Installation of new curb cut. No product keyword matched | 1 | Aug 20, 2026 |
| B | PARKPLUS NYC DOB building permits | 10 | General Construction · PROPOSED NEW AUTOMATED PARKING SYSTEM IN EXISTING GARAGE No product keyword matched | 1 | Aug 20, 2026 |
| B | 451 TENTH AVENUE LLC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK FOR THE INSTALLATION OF ATTACHEMENTS FOR EXPANSION/SEISMIC JOINT SYSTEM AND INSTALLATION OF EXTERIOR METAL RAIN SCREEN SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 20, 2026 |
| B | QUEENS COLLEGE, CUNY NYC DOB building permits | 10 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 20, 2026 |
| B | BENNETT PROPERTY OWNER LLC NYC DOB building permits | 10 | Construction Fence · Application filed for temporary construction fence to address violation 35647619Z and for NB # M00775662-I1 No product keyword matched | 1 | Aug 20, 2026 |
| B | COLUMBIA 160 APARTMENT CORP. NYC DOB building permits | 10 | Plumbing · MODIFICATIONS TO PLUMBING SYSTEM IN APT 8D AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Aug 20, 2026 |
| B | GOLD MERO SEAFOOD CORP NYC DOB building permits | 10 | Plumbing · INSTALLATION OF GAS CONVECTION STEAMER AND PLUMBING FIXTURES No product keyword matched | 1 | Aug 20, 2026 |
| B | THE ROCKEFELLER UNIVERSIT NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL MODIFICATIONS TO WEISS BUILDING (CELLAR A FLOOR LEVEL & 1ST FLOOR LEVEL) - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NEW AIR CONDITIONING UNIT. NEW FAN COIL UNIT. NEW EXHAUST FAN. MISC PIPING AND DUCTWORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Aug 20, 2026 |
| B | OrsidNY NYC DOB building permits | 10 | General Construction · FACADE REPAIRS AS PER DRAWINGS . THERE IS NO CHANGE TO USE. EGRESS, OR OCCUPANCY No product keyword matched | 1 | Aug 20, 2026 |
| B | NASAH CONSTRUCTION CORP NYC DOB building permits | 10 | Foundation · Foundation work for new front and rear extensions and conversion from one-family to two-family dwelling No product keyword matched | 2 | Aug 20, 2026 |
| B | RB1 Development LLC NYC DOB building permits | 10 | Construction Fence · APPLICATION FILED TO ERECT AN 8.0 FEET HYIGH PLYWOOD CONSTRUCTION FENCE AROUND PERIMETER OF PROPERTY - FENCE APPLICATION SHALL ALSO APPLY TO BLOCK : 6264 LOTS:57 AND 58 No product keyword matched | 3 | Aug 20, 2026 |
| B | Able Island NYC DOB building permits | 10 | General Construction · CONSTRUCT DETACHED ONE FAMILY RESIDENCE WITH ANCILLARY DWELLING UNIT ON FIRST FLOOR (MAIN ENTRANCE OF ADU DIRECTLY OPENS TO THE SIDE YARD) AND BUILT IN TWO CAR GARAGE No product keyword matched | 2 | Aug 20, 2026 |
| B | CLEARVIEW BLDG SVCS. INC NYC DOB building permits | 10 | General Construction · Proposed exterior renovation for Bank of America. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 20, 2026 |
| B | Ang & Lu LLC NYC DOB building permits | 10 | Plumbing · ALTERATION OF AN EXISTING SINGLE FAMILY DWELLING BUILDING WITH PLUMBING WORK. REPLACE GAS BOILER AND H.W.H. WITH NEW. NEW BATHROOM ON 1st FLOOR. NEW, RELOCATION, AND REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Aug 20, 2026 |
| B | ORCHESTER MANAGEMENT COM* NYC DOB building permits | 10 | General Construction · Interior Alterations to residence consisting of opening in interior load bearing wall and rear exterior facade. No product keyword matched | 3 | Aug 20, 2026 |
| B | COPTIC ORTHODOX PATRIARCHATE OF ALE NYC DOB building permits | 10 | Plumbing · PLUMBING APPLICATION FOR NEW GAS METER No product keyword matched | 2 | Aug 20, 2026 |
| B | MEADOWLAND CONSTRUCTION NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Aug 20, 2026 |
| B | THE RESTORATION GUIDE LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION ON EXISTING 17TH FLOOR SPACE. NO CHANGE TO USE,, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 20, 2026 |
| B | THE UKRAINIAN MUSEUM NYC DOB building permits | 10 | Plumbing · FILING FOR NEW PLUMBING WORK ON 3RD FLOOR TO INCLUDE NEW AND REPLACED PLUMBING PIPES AND FITTINGS. ALL GAS PIPES IN BEUILDING WITH ASSOCIATED FITTINGS AND ACCESSORIES TO BE REMOVED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 2 | Aug 20, 2026 |
| B | FAMILY HOME IMPROVEMENT C NYC DOB building permits | 10 | Construction Fence · Installation of Construction Fence No product keyword matched | 1 | Aug 20, 2026 |
| B | DNO EQUIPMENT AND DEVELOPMENT INC. NYC DOB building permits | 10 | Construction Fence · Install temporary wood construction fence. No Change to egress, occupancy or use. No product keyword matched | 1 | Aug 20, 2026 |
| B | APT 6R NYC DOB building permits | 10 | Plumbing · Pluming work in conjunction with Alteration Type II application # 240294855 to renovate one family dwelling No product keyword matched | 1 | Aug 20, 2026 |
| B | SUPREME PAINTING & WALL C NYC DOB building permits | 10 | General Construction · Propose interior renovation for apartment 20G on the 20th floor. No change in use, egress, occupancy. No product keyword matched | 1 | Aug 20, 2026 |
| B | VITIELLO REALTY NYC DOB building permits | 10 | Plumbing · REFILING OF DOB APPLICATION 320107834 FOR INSTALLATION OF GAS BOILER AND WATER HEATERS. No product keyword matched | 3 | Aug 20, 2026 |
| B | Havana Express Catering Services NYC DOB building permits | 10 | Mechanical Systems · FILING FOR TAKEOUT CATERING COMMERCIAL KITCHEN HOODS AND DUCTWORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 20, 2026 |
| B | SERVPRO OF SOUTHWEST BROOKLYN NYC DOB building permits | 10 | General Construction · RESTORE FIRE DAMAGED EXISTING BUILDING BY REMOVING EXISTING PLASTERAND WOOD LATHE AND REPLACING IT WITH NEW G.W.B. THROUGHOUT BUILDING. No product keyword matched | 1 | Aug 20, 2026 |
| B | KALINIC INTERIORS INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING APARTMENT, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 20, 2026 |
| B | Kaywein Realty Co LLC NYC DOB building permits | 10 | General Construction · To remove existing bench seats and bar on first floor eating and drinking establishment. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 20, 2026 |
| B | PLESCIA CONSTRUCTION & DEVELOPMENT NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PLYWOOD FENCE IS AT WEST STREET AND ATTACHED TO THE SIDEWALK BRIDGE. No product keyword matched | 1 | Aug 20, 2026 |
| B | MCKENNA RENOVATIONS LLC NYC DOB building permits | 10 | General Construction · Installation of non load bearing partition wall at apartment 3R-no change of use, occupancy, or egress No product keyword matched | 1 | Aug 20, 2026 |
| B | ABC PRESCHOOL & KINDERGARTEN, CORP. NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING SCHOOL - FIRST AND SECOND FLOORS WITH NO CHANGES TO EXISTING LAYOUTS. No product keyword matched | 1 | Aug 20, 2026 |
| B | Intercity Rehab NYC DOB building permits | 10 | Plumbing · PROPOSED 4 NAVIEN NCB-240 COMBI HEAT & HOT WATER HEATER (COMBINED) AT CELLAR. REPLACE EXIST. 3 GAS METER W/ NEW AT CELLAR. No product keyword matched | 2 | Aug 20, 2026 |
| B | MGGB Real Estate NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENTS 2 AND 3. MINOR PARTITION AND FINISH WORK, AS PER PLAN. NO CHANGE IN USE OCCUPANCY AND EGRESS. No product keyword matched | 1 | Aug 20, 2026 |
| B | ALBA ELECTRIC CORP NYC DOB electrical permits | 10 | RENOVATION OF 8TH FLOOR APARTMENT No product keyword matched | 1 | Aug 20, 2026 |
| B | KRAFT ELECTRIC CORP NYC DOB electrical permits | 10 | Wiring for (2) new Boilers/burners in the Boiler room, cellar. No product keyword matched | 1 | Aug 20, 2026 |
| B | DD&G ELECTRICAL CORP NYC DOB electrical permits | 10 | Replace Old frankenstein Board and Meterbanks with New 1200A SW and Meterbanks. NO NEW LOAD. No product keyword matched | 1 | Aug 20, 2026 |
| B | SJ ELECTRICAL SERVICES LL NYC DOB electrical permits | 10 | APT 2 E: Replaced the circuit breaker CB panel. Installed receptacle outlets in the bedrooms, living room, and dining room. Installed GFCI outlets in the bathrooms. Installed dedicated outlets for kitchen appliances. Installed ceiling outlets for lighting fixtures, pendant light and ceiling fans. No product keyword matched | 1 | Aug 20, 2026 |
| B | EIS ELECTRIC NYC CORP NYC DOB electrical permits | 10 | 1 EAST 66TH STREET, APT # 16B, NY, NY 10065. Temporary lighting and power. General wiring for power and lighting. No product keyword matched | 1 | Aug 20, 2026 |
| B | A - Apple NYC DOB electrical permits | 10 | test desc No product keyword matched | 1 | Aug 20, 2026 |
| B | CMPB Electrical Inc. NYC DOB electrical permits | 10 | Lighting & outlet adds to existing amenity space. Wiring for sauna & cold plunge No product keyword matched | 1 | Aug 20, 2026 |
| B | EURO BUILDING GROUP INC NYC DOB building permits | 10 | Structural · Temporary Structure filed for the outside space. No product keyword matched | 1 | Aug 19, 2026 |
| B | MQ PROPERTY MGMT LTD NYC DOB building permits | 10 | General Construction · Limited Exterior Repair Program. No change to use, occupancy or egress. No product keyword matched | 1 | Aug 19, 2026 |
| B | JOSEPH P. DAY REALTY NYC DOB building permits | 10 | Mechanical Systems · Modifications to existing mechanical system on 12th floor (north) as per plans. No change to use, egress or occupancy. No product keyword matched | 2 | Aug 19, 2026 |
| B | FJN DEVELOPMENT CORP NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING. No product keyword matched | 2 | Aug 19, 2026 |
| B | BH3 MANAGEMENT LLC NYC DOB building permits | 10 | Construction Fence · Filing temporary fence work as per plans submitted herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Aug 19, 2026 |
| B | DLG INTERIORS RENOVATIONS NYC DOB building permits | 10 | General Construction · RENOVATION OF THE KITCHEN, SLIGHT MODIFICATION TO THE LOCATION OF THE FIXTURES AND MODIFICATION OF INTERIOR WALLS FOR ADDITIONAL OPENING FROM THE KITCHEN INTO LIVING ROOM. BATHROOM FIXTURES AND FINISHES WILL ALSO BE MODIFIED. NO CHANGE TO USE, OR EGRESS No product keyword matched | 1 | Aug 19, 2026 |
| B | 138-140 EAST 80, LLC NYC DOB building permits | 10 | Boiler Equipment · INSTALL FUEL STORAGE TANK, PUMP, PIPING FOR THE BUILDING SUBSEQUENT WITH DOB JOB#M00606644. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 19, 2026 |
| B | 4 STAR CONTRACTING INC NYC DOB building permits | 10 | Structural · REPAIRS OF PARKING GARAGE INCLUDING SHORING AND BRACING, REPAIR OF DETERIORATED SECTIONS OF PARKING DECKS, FOUNDATION WALLS, STRUCTURAL STEEL, AND CRACKED CONCRETE AND FIREPROOFING OF STEEL AS NEEDED. NO CHANGE TO USE OR EGRESS. No product keyword matched | 1 | Aug 19, 2026 |