Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | RXR CONSTRUCTION SERV LLC NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION WORK ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Aug 24, 2026 |
| B | Car Business NYC DOB building permits |
| 10 |
General Construction · REMOVING PARTITION WALLS AND NEW PARTITION WALLS IN CELLAR. REMOVING AND NEW DOORS IN CELLAR, NEW EGRESS STAIRCASE FROM CELLAR TO OUTDOORS. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK. No product keyword matched |
| 1 |
| Aug 24, 2026 |
| B | KINGDOM PLUS HOLDINGS, LLC NYC DOB building permits | 10 | Sprinklers · Application filed to install sprinkler system as shown on plans. No product keyword matched | 1 | Aug 24, 2026 |
| B | OC CONSTRUCTION GROUP NYC DOB building permits | 10 | General Construction · TO COMBINE EXISTING (2) DWELLING UNITS AT FLOOR 03 INTO (1) DWELLING UNIT. INTERIOR RENOVATION CONSISTING OF NON-BEARING PARTITION CHANGES, NEW FINISHES, NEW INTERIOR LIGHTING WITHIN DWELLING UNIT AND REPAIRS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | DARKEI CHAIM NYC DOB building permits | 10 | Sprinklers · Sprinkler work in conjunction with Alt-CO #B01082610-I1 No product keyword matched | 1 | Aug 24, 2026 |
| B | RR CONSTRUCTION GROUP INC NYC DOB building permits | 10 | Sidewalk Shed · TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | MILANO CONSTRUCTION GROUP NYC DOB building permits | 10 | General Construction · LEGALIZE CONVERSION OF GARAGE TO BEDROOM AT FIRST FLOOR No product keyword matched | 1 | Aug 24, 2026 |
| B | 58 WALDRON LLC NYC DOB building permits | 10 | General Construction · NEW 3-STORY BUILDING FOR 3-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 6 | Aug 24, 2026 |
| B | LAG MARRIOTT HOTEL NYC DOB building permits | 10 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Aug 24, 2026 |
| B | QUICKSTAR LABS NYC DOB building permits | 10 | General Construction · DRAWINGS ARE FILED TO RENOVATE AN EXISTING 2-FAMILY DWELLING. REMOVE & REPLACE EXISTING NON-LOAD BEARING PARTITIONS WITH NEW PARTITIONS, NEW STEEL STAIR TO ROOF, & NEW INTERIOR FINISHES. NO CHANGE TO EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 24, 2026 |
| B | CARDINAL HAYES HIGH SCHOOL NYC DOB building permits | 10 | General Construction · ALT- 2 APPLICATION FOR NEW CLASSROOMS AND LIBRARY AT ROSALYN YALOW CHARTER SCHOOLON 3rd & 4th FLOORS IN AN EXISTING SCHOOL BUILDING. NO CHANGE TO USE AND OCCUPANCY OREGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Aug 24, 2026 |
| B | ROSE COMMUNITY MANAGEMENT NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 1 | Aug 24, 2026 |
| B | Frame Asset Management NYC DOB building permits | 10 | Plumbing · REMOVAL, RELOCATION, AND INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING, AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 24, 2026 |
| B | AXENNT LLC NYC DOB building permits | 10 | General Construction · Propose horizontal extension with interior renovations and exterior restoration as per plans. No Change to use, or egress. No product keyword matched | 1 | Aug 24, 2026 |
| B | ALTA CONSTRUCTION EAST IN NYC DOB building permits | 10 | General Construction · Renovation of the 1st floor and cellar for retail build out, minor partition work, facade work, replace wall finishes, floor and ceiling tiles. Subsequent filings for structural, plumbing & mechanical to be filed. No change in use, egress or occupancy No product keyword matched | 3 | Aug 24, 2026 |
| B | DUNRITE DESIGN GROUP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATIONS ONLY OF CELLAR THROUGH THIRD FLOOR, CONVERSION FROM 6 FAMILIES TO 5 FAMILIES; ALSO OBTAINING CERTIFICATE OF OCCUPANCY No product keyword matched | 1 | Aug 24, 2026 |
| B | AMERICAN REALTY & MANAGEMENT INC NYC DOB building permits | 10 | Plumbing · raise water closet for installation new floor, raise lavatory for ADA Height, reconnect to existing piping. Relocate EWC for ADA Clearances, extend piping from old location. No product keyword matched | 1 | Aug 24, 2026 |
| B | E.J. YORK INC NYC DOB building permits | 10 | General Construction · Application being filed to remedy ecb #35726983K and dob violation 03072026llfadd01. general construction work to repair and replace damage lintels,window frames and parapet wall. work includes removal and reconstruction of existing parapet wall at roof No product keyword matched | 2 | Aug 24, 2026 |
| B | THE ANTHEM LLC NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work and/or inspection .Amend #1 added outrigger detail No product keyword matched | 1 | Aug 24, 2026 |
| B | SANTI SERVICES NYC DOB building permits | 10 | Standpipe · Application is filed for sprinkler, plumbing & standpipe work at the subject premises. No product keyword matched | 1 | Aug 24, 2026 |
| B | Celtic Park Owners NYC DOB building permits | 10 | General Construction · FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | ST PETERS BOYS HIGH SCHOOL NYC DOB building permits | 10 | General Construction · Proposed new basement classrooms with terrace above. No product keyword matched | 3 | Aug 24, 2026 |
| B | SUITE 1400 LLC. DBA RYAN GEMS NYC DOB building permits | 10 | Plumbing · Plumbing and sprinkler work on 14th floor as per plans. No change in use, egress or occupancy. No product keyword matched | 2 | Aug 24, 2026 |
| B | BVH NYC DOB building permits | 10 | Plumbing · Demolition and installation of plumbing fixtures on 2nd and 4th floors as permit plans. No product keyword matched | 7 | Aug 24, 2026 |
| B | GEORGIAN HALL LLC NYC DOB building permits | 10 | General Construction · INSTALL CHIMNEY LINER IN EXISTING MASONRY CHIMNEY No product keyword matched | 2 | Aug 24, 2026 |
| B | 147-28 8TH AVE LLC NYC DOB building permits | 10 | Full Demolition · HAND DEMOLITION OF EXISTING GARAGE No product keyword matched | 4 | Aug 24, 2026 |
| B | 99 MACDOUGAL LLC NYC DOB building permits | 10 | Plumbing · CONNECT EXISTING GAS PIPING TO REPLACEMENT (2) GAS BOILERS AS PER PLANS. INSTALL (2) NEW INDIRECT WATER HEATERS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 3 | Aug 24, 2026 |
| B | 4444 PPPP CORP NYC DOB building permits | 10 | General Construction · Propose to provide plans for partitioning GC work of existing 2 family building . No product keyword matched | 1 | Aug 24, 2026 |
| B | DOBCO, INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APARTMENT #717 AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | BODHI FITNESS CENTER INC NYC DOB building permits | 10 | General Construction · TO ERECT CONVENIENCE ROOF ACCESS STAIR IN EXISTING STAIR ENCLOSURE, NO CHANGE TO USE, OCCUPANCY AND EGRESS No product keyword matched | 1 | Aug 24, 2026 |
| B | hummus republic NYC DOB building permits | 10 | Sign · ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | PROFESSIONAL STEEL SUPP C NYC DOB building permits | 10 | General Construction · At building front 1st floor, install new 4 face brick & cover front open porch walls with same. Install new stainless steel framed acrylic awning above front porch, all as per submitted drawings. No change in occupancy, use or egress. No product keyword matched | 1 | Aug 24, 2026 |
| B | RICHARD MORTMAN NYC DOB building permits | 10 | Boiler Equipment · INSTALL REPLACEMENT GAS/OIL BOILER/BURNER UNIT(S) AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 24, 2026 |
| B | 116 HUDSON STREET CONDOMINIUM NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Aug 24, 2026 |
| B | 500 Columbus SP LLC NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 24, 2026 |
| B | 1970 NYC DOB building permits | 10 | Plumbing · PROPOSE TO INSTALL NEW PLUMBING FIXTURES. ALSO TO REPLACE AND RELOCATE EXISTING FIXTURES AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 1 | Aug 24, 2026 |
| B | Abo Habib, LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION INSIDE EXISTING (1) FAMILY RESIDENTIAL HOME. WORK WILL INCLUDE REMOVAL OF INTERIOR PARTITIONS, NEW PARTITIONS, REPLACE EXISTING FLOOR WITH NEW, AND INTERIOR FINISHES THROUGHOUT. WORK AS PER PLANS. No product keyword matched | 1 | Aug 24, 2026 |
| B | RE-BRICK CONSTRUCTION INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 24, 2026 |
| B | UNITED METHODIST WOMEN NYC DOB building permits | 10 | General Construction · PROPOSED FACADE REPAIRS AS PER PLANS FILED. THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION No product keyword matched | 1 | Aug 24, 2026 |
| B | NYC BUILDERS & RENOVATION NYC DOB building permits | 10 | Structural · STRUCTURAL REPAIR TO EXISTING BUILDING FIRST FLOOR FRAMING, REPLACEMENT OF CORRODED WINDOW LINTELS AT GROUND FLOOR AND REINFORCEMENT OF EXISTING FIRST FLOOR TERRACE FRAMING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | GBAMOKOLLIE NYC DOB building permits | 10 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS. No product keyword matched | 1 | Aug 24, 2026 |
| B | TINDEL REPLACEMNET WINDOWS INC. NYC DOB building permits | 10 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING WINDOW REPLACEMENT. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 24, 2026 |
| B | SOHO BUILDING DESIGN INC. NYC DOB building permits | 10 | Curb Cut · FILING CURB CUT APPLICATION No product keyword matched | 1 | Aug 24, 2026 |
| B | Genius Lab NYC DOB building permits | 10 | General Construction · Renovation of an existing commercial retail store at the 1st floor. No change in use, egress or occupancy under this application. No product keyword matched | 1 | Aug 24, 2026 |
| B | ENTREPRENEUR PROPERTIES NYC NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR THE INTERIOR RENOVATION AT FIRST FLOOR OF A 2 STORY BUILDING AS PER PLANS. No product keyword matched | 1 | Aug 24, 2026 |
| B | 118-15 Liberty Ave Inc NYC DOB building permits | 10 | Plumbing · APPLICATION FILED TO REPLACE EXISTING BRANCH PIPING FROM EXISTING 2 GAS METERS IN THE CELLAR. NO CHANGE TO USE, EGRESS, NOR OCCUPANCY. No product keyword matched | 1 | Aug 24, 2026 |
| B | RC CHURCH OF ST SEBASTIAN NYC DOB building permits | 10 | Mechanical Systems · REPLACE 15-TON ROOFTOP CONDENSER & DX COIL IN CELLAR No product keyword matched | 1 | Aug 24, 2026 |
| B | ALL PRO ELEC. OF N.Y. INC NYC DOB electrical permits | 10 | ELECTRICAL FILING FOR B01353516-I1-SG. SIGN WORDING: S&K PHARMACY No product keyword matched | 4 | Aug 24, 2026 |
| B | NICOLETTA ELEC'L. CONTR'G NYC DOB electrical permits | 10 | General Wiring No product keyword matched | 1 | Aug 24, 2026 |
| B | CRM PREPARER NYC DOB building permits | 10 | Curb Cut · sdfgdfg No product keyword matched | 1 | Aug 23, 2026 |