Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | KSP PLUMBING INC NYC DOB building permits | 10 | Plumbing · Propose plumbing work at cellar & 1st floor commercial space of existing eating and drinking establishment as per plan. No change in use, egress, or occupancy. No product keyword matched | 2 | Aug 26, 2026 |
| B | STANDARD CONSTRUCTION CORP. |
| 10 |
General Construction · APPLICATION FILE FOR EXTERIOR FACADE REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched |
| 1 |
| Aug 26, 2026 |
| B | RENOV INC NYC DOB building permits | 10 | Mechanical Systems · Filing for interior demolition, general construction, a new penetration for a HVAC unit. No change in use, egress or occupancy. No product keyword matched | 2 | Aug 26, 2026 |
| B | AJC SPRINKLER CORP NYC DOB building permits | 10 | Sprinklers · Installation of sprinkler/ plumbing system. Filed in conjetcion with NB#321597955. No product keyword matched | 2 | Aug 26, 2026 |
| B | PARK NYC DOB building permits | 10 | Sprinklers · Fire Sprinkler Plans filed herewith. No product keyword matched | 6 | Aug 26, 2026 |
| B | MOMA PS1 NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | FIFTH 78th Corp NYC DOB building permits | 10 | General Construction · INTERIOR ALTERATION TO EXISTING DUPLEX UNIT ON 005 AND 006 FLOOR - DEMOLISH OF NON-STRUCTURAL INTERIOR PARTITIONS AND PLUMBING UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | NEW YORK ATHLETIC CLUB OF THE CITY NYC DOB building permits | 10 | Standpipe · SPRINKLER AND STANDPIPE WORK RELATED TO INTERIOR ALTERATIONS AND MODIFICATIONS TO TENANT FLOORS 20-22. No product keyword matched | 1 | Aug 26, 2026 |
| B | SAPPHIRE CONSTRUCTION GR* NYC DOB building permits | 10 | General Construction · REPAIR AND REPLACE EXTERIOR SIDING AS REQUIRED No product keyword matched | 1 | Aug 26, 2026 |
| B | SCIAME CONSTRUCTION LLC NYC DOB building permits | 10 | Structural · STRUCTURAL REINFORCEMENT INCONJUNCTION WITH PROPOSED 7 STORY ENLARGEMENT TO EXISTING 8 STORY BUILDING FILED UNDER ALT I APPLICATION 121205114. No product keyword matched | 1 | Aug 26, 2026 |
| B | Md Shihab Uddin NYC DOB building permits | 10 | General Construction · Eleminate existing Car space to OSP , make a accesorry room as floor area resolve complain #2411238 . at Front and obtain new C of O. No product keyword matched | 1 | Aug 26, 2026 |
| B | REGAL ONE MANAGEMENT LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AT APARTMNET #4A No product keyword matched | 2 | Aug 26, 2026 |
| B | SILVERCUP SCAFFOLDING LLC NYC DOB building permits | 10 | Sprinklers · SPRINKLER SYSTEM FOR RENOVATION, ALTERATION, EXTENSION AND CONVERSION OF EXISTING 5-FAMILY RESIDENTIAL BUILDING TO 4-FAMILY RESIDENTIAL BUILDING. No product keyword matched | 1 | Aug 26, 2026 |
| B | CANIDO BASONAS CONST. COR NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade repair & inspection. No product keyword matched | 1 | Aug 26, 2026 |
| B | MADISON CONSTRUCTION CONSULTANTS CO NYC DOB building permits | 10 | Sign · INSTALL ILLUMINATED SIGN AT WALL LITTLE CUPCAKE BAKESHOP. No product keyword matched | 1 | Aug 26, 2026 |
| B | BEST INTERIORS MGMT CO IN NYC DOB building permits | 10 | General Construction · RENOVATION OF APT. 6c & 6D ON 6TH FLOOR. MINOR PARTITION CHANGES, NEW FINISHES AND MILLWORK THROUGHOUT. NO CHANGES TO USE, OCCUPANCY, OR MEANS OF EGRESS No product keyword matched | 1 | Aug 26, 2026 |
| B | ACAZ MANAGEMENT LLC NYC DOB building permits | 10 | Earth Work · PROPOSE A NEW ACCESSORY GARAGE AT REAR YARD. OBTAIN NEW C OF O. No product keyword matched | 2 | Aug 26, 2026 |
| B | 1128bsd llc NYC DOB building permits | 10 | Plumbing · partial plumbing work, new building sewer as per DEP approved site connection. DOB inspection sewer steel sleeve through foundation wall. No product keyword matched | 1 | Aug 26, 2026 |
| B | AVANT GARDNER LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALL GAS HVAC UNIT ON ROOF AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | Cohen Group Realty NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AT EXISTING THREE STORY BUILDING IN CONJUNCTION WITH GC APPLICATION B00457333-I1. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 1 | Aug 26, 2026 |
| B | OM GENERAL CONTRACTION NYC DOB building permits | 10 | Sidewalk Shed · Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter #33 of the 2022 Building Code. No product keyword matched | 1 | Aug 26, 2026 |
| B | LITTLE RED HOUSE NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Aug 26, 2026 |
| B | RENWOOD INTERIORS CORP NYC DOB building permits | 10 | General Construction · Renovation of existing 2-family building. Demolition and replacement of rear exterior structural wall with structured window wall. Replacement of windows on the rear elevation (Secondary Elevation). No change in use, egress, or occupancy. No product keyword matched | 2 | Aug 26, 2026 |
| B | 41 EAST 11TH STREET LLC NYC DOB building permits | 10 | Plumbing · Plumbing work in conjunction with interior renovation of the 5th floor No product keyword matched | 4 | Aug 26, 2026 |
| B | ZB CONSTRUCTION GROUP LLC NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL FILINGS FOR RESIDENTIAL UNITS No product keyword matched | 1 | Aug 26, 2026 |
| B | GARMAD PLBG & HTG INC NYC DOB building permits | 10 | Plumbing · LEGALILZING THE GAS QUIPMENTS. NO CHANGE IN USE, OCCUPANCY AND EGRESS No product keyword matched | 1 | Aug 26, 2026 |
| B | LEWIS 26 LLC NYC DOB building permits | 10 | Construction Fence · HEREWITH FILING TO INSTALL CONSTRUCTION FENCE AS PER APPROVED PLANS. No product keyword matched | 1 | Aug 26, 2026 |
| B | FONTAO MANAGEMENT INC NYC DOB building permits | 10 | General Construction · Install of temp truss arch, no alt to exist structures for 9/11 Tribute. A TPA is not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion. No product keyword matched | 1 | Aug 26, 2026 |
| B | HOLLYWOOD CONSTRUCT GRO NYC DOB building permits | 10 | Plumbing · INSTALL PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS No product keyword matched | 2 | Aug 26, 2026 |
| B | LINEAL CONSTRUCTION & RES NYC DOB building permits | 10 | General Construction · Misc replacement of brick masonry, replacement of cast stone window sills, replacement of joint sealant, misc concrete balcony repairs, replacement of coping stones, replacement of masonry joints, per plans. No change in use, egress, or occupancy No product keyword matched | 3 | Aug 26, 2026 |
| B | WEBSTER LOCK CO. NYC DOB building permits | 10 | General Construction · Open Accessory Off-Site Parking Spaces for Adjacent Commercial Building No product keyword matched | 1 | Aug 26, 2026 |
| B | LEO KING CONTRACTING CORP NYC DOB building permits | 10 | Mechanical Systems · FILING FOR MECHANICAL WORK AS PER PLANS. REPLACING EXISTING UNITS No product keyword matched | 2 | Aug 26, 2026 |
| B | COSMOS REALTY LLC, 3307 HULL REALTY NYC DOB building permits | 10 | Boiler Equipment · REFILE BOILER ORIGINALLY FILED UNDER 200294369 TO OBTAIN INSPECTION AND SIGN-OFF. REPLACE GAS/OIL BURNER. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. No product keyword matched | 1 | Aug 26, 2026 |
| B | DUAL FUEL PLBG & HTG CORP NYC DOB building permits | 10 | Boiler Equipment · REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Aug 26, 2026 |
| B | X-Noroc NYC DOB building permits | 10 | Mechanical Systems · REGISTER GAS-FIRED UNIT HEATERS AS PER PLANS. NO CHANGE IN USE,OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Aug 26, 2026 |
| B | NEW YORK HUA LIAN TSU HUI TEMPLE NYC DOB building permits | 10 | General Construction · Repair and replace waterproofing and roof tiles as required. No change to use egress and occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | SAPOL REALTY NYC DOB building permits | 10 | Plumbing · Plumbing work associated with the combining of Medical suites 1 and 2 into 1 Medical suite at 1st floor. No product keyword matched | 1 | Aug 26, 2026 |
| B | prince 88 realty llc NYC DOB building permits | 10 | Plumbing · PROPOSED PLUMBING WORK IN CONJUNCTION WITH DOB NOW GC JOB NO:Q01225394-I1. RELOCATED DRINKING FOUNTAIN AND SERVICE SINK ON 1ST FLOOR, INSTALLED NEW PLUMBING FIXTURE ON 2ND FLOOR. No product keyword matched | 1 | Aug 26, 2026 |
| B | LUCA ANTONELLI CONTRACT NYC DOB building permits | 10 | General Construction · Minor renovation and modification of existing retail store (use group 6) on first floor to include minor partition work, plumbing and interior finishes/casework. No change to use egress or occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | PALLADIUM PROPERTY GROUP NYC DOB building permits | 10 | Support of Excavation · SUBSEQUENT SOE APPLICATION FILED HEREWITH. No product keyword matched | 2 | Aug 26, 2026 |
| B | MAJESTIC PROPERTIES NYC DOB building permits | 10 | General Construction · INTERIOR ALTERATIONS TO SECOND FLOOR OFFICE SPACE FOR TENANT FIT OUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Aug 26, 2026 |
| B | CRAVIN JAMAICAN CUISINE NYC DOB building permits | 10 | Mechanical Systems · BUILD OUT OF VACANT UG-6 COMMERCIAL SPACE TO CREATE NEW RESTAURANT. CONSTRUCTION AND MECHANICAL WORK TO BE PERFORMED AS PER PLANS HEREWITH SUBMITTED. FIRESTOPPING WILL NOT BE DISTURBED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 26, 2026 |
| B | TANDEM CONSTRUCTION LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING TWO STORY, TWO FAMILY BUILDING . NO CHANGE OF USE , EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | TORATH ISRAEL SEPHARDIC CONGREGATIO NYC DOB building permits | 10 | Mechanical Systems · replace roof top unit 30 ton in kind No product keyword matched | 1 | Aug 26, 2026 |
| B | Congregation Darech Amuno NYC DOB building permits | 10 | General Construction · Interior renovation as per plans. No change in use, egress or occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | HL Ironworks NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | 67 CRANBERRY LLC NYC DOB building permits | 10 | Sprinklers · plumbing and sprinkler work associated with the townhouse renovation as shown on plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | 35 HUDSON YARDS CONDOMINIUM NYC DOB building permits | 10 | General Construction · Removal and installation of walls, doors, floor finishes and ceilings as per plans. No change to use, occupancy, or egress No product keyword matched | 1 | Aug 26, 2026 |
| B | St Patrick’s. Church NYC DOB building permits | 10 | Boiler Equipment · BOILER APPLICATION FILED IN ORDER TO INDICATE REPLACEMENT OF 1 BOILER AT EXISTING PROPERTY, LOCATED IN 1ST FLOOR BOILER ROOM. PROPOSED 2 BOILERS CONNECTING TO EXISTING GAS LINE AND EX. WATER PIPING. CONNECTION TO NEW FLUE AND VENT TO ROOF DISCONNECT. No product keyword matched | 1 | Aug 26, 2026 |
| B | PROFILE GROUP INC NYC DOB building permits | 10 | General Construction · COMBINATION OF APARTMENTS 7C & 7E ON THE 7nd FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 1 | Aug 26, 2026 |