Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | DENNIS LEDUC NYC DOB building permits | 10 | Boiler Equipment · RE-FILING OF NYC DOB# 421896167 & 402126515 FOR INSTALLATION OF FUEL STORAGETANKS AS PER PLANS. FILING TO ADDRESS FDNY SUMMONS: 014227567N.NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Aug 27, 2026 |
| B | PENNELL CONSTRUCTION LLC |
| 10 |
Mechanical Systems · Installation of 5 indoor and 1 outdoor HVAC equipment. for apartment renovation. No product keyword matched |
| 1 |
| Aug 27, 2026 |
| B | Rapid Ramirez Ventures LLC NYC DOB building permits | 10 | Plumbing · Proposed plumbing work for an existing 3-story, basement and cellar, two family dwelling (I-CARD 626446). No product keyword matched | 4 | Aug 27, 2026 |
| B | 180 FRANKLIN LLC NYC DOB building permits | 10 | Plumbing · REPLACEMENT & INSTALLATION OF PLUMBING FIXTURES AS PER THE DRAIWNGS FILED HEREIN. No product keyword matched | 3 | Aug 27, 2026 |
| B | Hispanic Society of America Museum NYC DOB building permits | 10 | Structural · THE STRUCTURAL SCOPE OF WORK ENTAILS PROVIDING A LOCAL SLAB ON GRADE POURED OVER THE EXISTING SLAB ON GRADE, MECHANICAL EQUIPMENT PADS, AND SMALL MASONRY WALL OPENINGS FORMECHANICAL ACCOMMODATION. No product keyword matched | 2 | Aug 27, 2026 |
| B | PRP Estates, LLC NYC DOB building permits | 10 | Plumbing · PLANS AND DOCUMENTS FILED HEREWITH TO INSTALL WATER/SANITARY FIXTURES AND ASSOCIATED PIPES. No product keyword matched | 4 | Aug 27, 2026 |
| B | 7001 QNS, LLC NYC DOB building permits | 10 | General Construction · TO CONVERT EXISTING COMMUNITY FACILITY TO DAYCARE. WORK TO INSTALL PARTITION WALLS, & TOILETVENT, AND RELOCATE EXISTING DIFFUSERS & DUCTS. No product keyword matched | 4 | Aug 27, 2026 |
| B | STAHAV REALTY NYC DOB building permits | 10 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 27, 2026 |
| B | FRAMAHOLDING CORP NYC DOB building permits | 10 | Plumbing · Subsequent filing for PL work type. Install plumbing fixtures and pizza oven for Little Cesar. No change in use, egress or occupancy. No product keyword matched | 3 | Aug 27, 2026 |
| B | 1055 63 LLC NYC DOB building permits | 10 | Sprinklers · Sprinkler work as per plans in conjunction with Alteration type 1 application # B01197727-I1 No product keyword matched | 2 | Aug 27, 2026 |
| B | 30 ROCKEFELLER PLAZA NYC DOB building permits | 10 | Sprinklers · Fit out of the 44th floor complete with new plumbing and piping distribution No product keyword matched | 1 | Aug 27, 2026 |
| B | 1073 NYC DOB building permits | 10 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 1 | Aug 27, 2026 |
| B | REVIEW ASSOCIATES LLC NYC DOB building permits | 10 | General Construction · 1. MASONRY BLOCK JOINT RE-POINTING AT REAR =50 SF. 2. WATERPROOFING ENTIRE AREA=5000 SF No product keyword matched | 1 | Aug 27, 2026 |
| B | Rainbow Condominium NYC DOB building permits | 10 | Structural · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/facade repair as per plans herewith. No product keyword matched | 1 | Aug 27, 2026 |
| B | MOREA CONSTRUCTION I CORP NYC DOB building permits | 10 | General Construction · ALTERATION OF AN EXISTING APARTMENT TO INCLUDE: REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS RELATING TO INTERIOR LAYOUT CHANGES, INSTALLATION OF BATHROOM EXHAUST VENTILATION AND A DUCTED RANGE HOOD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Aug 27, 2026 |
| B | ALLCITY INTERIOR & EXTERIOR INC NYC DOB building permits | 10 | General Construction · RECONSTRUCT EXISTING GARAGE TO COMPLY WITH VIOLATION # 39142023J No product keyword matched | 1 | Aug 27, 2026 |
| B | 117th Street Equities LLC NYC DOB building permits | 10 | Boiler Equipment · REGISTER THREE (3) BOILERS TO COMPLY WITH ECB VIOLATION: 35180972N No product keyword matched | 2 | Aug 27, 2026 |
| B | BLU CONTRACTING INC NYC DOB building permits | 10 | General Construction · LEGALIZATION OF OPEN PORCH TO COMPLY WITH VIOLATION # 39189782Z OCCUPANCY GROUP R-3 RESIDENTIAL; AND CONSTRUCTION CLASSIFICATION: 4 NO CHANGE IN BULK, USE, OCCUPANCY, METES & BOUNDS. WORK AT EXTERIOR ONLY APPLICATION FILED TO ADDRESS VIOLATIONS: 39189782 No product keyword matched | 1 | Aug 27, 2026 |
| B | akhancooling llc NYC DOB building permits | 10 | General Construction · RESOLVE THE ECB VIOLATION# 39171939M, REMOVAL OF EXIST'G WALL FOR NEW CAR GARAGE ROOF AND WINDOW AND EXISTING CARPORT REMOVAL. NO CHANGE IN USE, OCCUPANY, OR EGRESS IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 2 | Aug 27, 2026 |
| B | 4511 AVENUE L REALTY LLC NYC DOB building permits | 10 | General Construction · REMOVE TEMPORARY EXTERIOR 1ST FLOOR THIN METAL FRAME STRUCTURE WITH PLEXI GLASS WINDOWS AT EXPOSURE #2 ALONG FLATLANDS AVE IN ORDER TO CORRECT ECB VIOLATION #39186833X. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 27, 2026 |
| B | SOLID CONCRETE CONSTRUCTI NYC DOB building permits | 10 | Curb Cut · New curb cut No product keyword matched | 1 | Aug 27, 2026 |
| B | MODERN DYNAMIC ASSEMBLY NYC DOB building permits | 10 | Structural · INTERIOR STRUCTURAL REINFORCEMENT WORK TO THE EXISTING MEZZANINE FROM THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Aug 27, 2026 |
| B | XIA CONSTRUCTION MNGMT* NYC DOB building permits | 10 | General Construction · Facade restoration to address Cycle 9 SWARMP conditions No product keyword matched | 1 | Aug 27, 2026 |
| B | SCO FAMILY OF SERVICES NYC DOB building permits | 10 | General Construction · filing herewith gen. construction work includes adding a cast in place concrete ramp and steps as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 27, 2026 |
| B | ZARCO CONTRACTING INC. NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF PLYWOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 27, 2026 |
| B | DR1 Development LLC NYC DOB building permits | 10 | Plumbing · PLANS AND DOCUMENTS FILED HEREWITH TO INSTALL SANITARY AND STORMWATER DISPOSAL SYSTEM. No product keyword matched | 1 | Aug 27, 2026 |
| B | L & L INDUSTRIAL INC NYC DOB building permits | 10 | General Construction · Vertical and horizontal extension and one family conversion to two family No product keyword matched | 2 | Aug 27, 2026 |
| B | Solon Mack Capital NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR COMMERCIAL TENANT RENOVATION AT THE 1ST FLOOR. RECONFIGURE DUCTWORK AND DIFFUSERS TO EXISTING SPLIT HVAC SYSTEM TO ACCOMMODATE NEW TENANT LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Aug 27, 2026 |
| B | F&G PROPERTIES NYC DOB building permits | 10 | General Construction · PARAPET REPLACEMENT WORK PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 1 | Aug 27, 2026 |
| B | OLYMPIA PLBING & HTG CORP NYC DOB building permits | 10 | Plumbing · PLUMBING WORK ASSOCIATED WITH 1ST FLOOR INTERIOR RENOVATION. ALL AS PER PLANS AND APPLICATIONS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 27, 2026 |
| B | GLITZ CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · Job being file to correct violations and legalize work done without a permit replacing sheet rock, new flooring, doors and minor work throughout. No change to egress, use or occupancy No product keyword matched | 1 | Aug 27, 2026 |
| B | 494 JACKSON LLC NYC DOB building permits | 10 | Sprinklers · SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH. No product keyword matched | 1 | Aug 27, 2026 |
| B | 8837 PROPERTY CORP NYC DOB building permits | 10 | General Construction · REMOVED ILLEGAL EXTENSION AT 1ST FLOOR TO CURE VIOLATION #39067844J. NO CHANGE IN USE, OCCUPACY OR EGRESS. No product keyword matched | 1 | Aug 27, 2026 |
| B | 30th Owner's LLc NYC DOB building permits | 10 | Plumbing · REPLACE GAS PIPING THROUGHOUT BUILDING, INCLUDING TO TWENTY-ONE (21) RESIDENTIAL STOVES, TO RESOLVE ECB VIOLATION 35066760M No product keyword matched | 1 | Aug 27, 2026 |
| B | Tomtro Realty Corp NYC DOB building permits | 10 | General Construction · Filing for the replacement of a cellar access door. No change in use, egress or occupancy. No product keyword matched | 1 | Aug 27, 2026 |
| B | STATEN MIX INC NYC DOB building permits | 10 | General Construction · proposed concrete producing batching plant equipment No product keyword matched | 1 | Aug 27, 2026 |
| B | BASS ELECTRICAL CORP. NYC DOB electrical permits | 10 | General wiring in kitchen and bathrooms ONLY in each apartment No product keyword matched | 1 | Aug 27, 2026 |
| B | AL ELECTRICAL GROUP INC NYC DOB electrical permits | 10 | Filing to supersede application #Y160666 which was filed by others in 2012. No product keyword matched | 1 | Aug 27, 2026 |
| B | JK ELECTRICAL INC NYC DOB electrical permits | 10 | INSTALL THREE 200A 3 PHASE DISCONNECT SWITCHES FUSE AT 175A TO FEED TEMPORARY BOILERS. INSTALL 12 - 100W TEMPORARY LED LIGHTS FED FROM TEMPORARY BOILER PANEL. No product keyword matched | 1 | Aug 27, 2026 |
| B | SPEAKEASY INTER AND ELECT NYC DOB electrical permits | 10 | Adding (1) 30 amp branch circuit for washing machine and (4) lighting fixtures No product keyword matched | 1 | Aug 27, 2026 |
| B | Plymouth Management Group NYC DOB building permits | 10 | Structural · Front Entrance & Sidewalk Vault Repair. No Change to Use, Egress, or Occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | ROOT CORE CONSTRUCTION NYC DOB building permits | 10 | Foundation · UNDERPINNING PLANS FOR RENOVATION AT BASEMENT No product keyword matched | 1 | Aug 26, 2026 |
| B | TRIHILL MANAGEMENT NYC DOB building permits | 10 | Plumbing · Plumbing-related work in association with Sidewalk Vault Repairs. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 26, 2026 |
| B | Horace Mann School NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK ON EXTERIOR, REPLACE OF EXISTING A/C UNIT. NO CHANGE IN EGRESS, USE OR OCCUPANCY. MECHANICAL WORK AS PER PLAN. No product keyword matched | 1 | Aug 26, 2026 |
| B | RYCO NYC LLC NYC DOB building permits | 10 | Mechanical Systems · FILING FOR A NEW COMMERCIAL KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 26, 2026 |
| B | DOUBLE KEY MANAGEMENT LLC NYC DOB building permits | 10 | Plumbing · Plumbing work as shown on plans. No product keyword matched | 1 | Aug 26, 2026 |
| B | 4N ASTORIA LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH JOB # Q01144052 No product keyword matched | 1 | Aug 26, 2026 |
| B | BROOKLYN CONTRACTOR INC NYC DOB building permits | 10 | General Construction · APPLICATION FILED WERWITH TO PROPOSE INTERIOR RENOVATION AND MINOR HORIZONTAL ENLARGEMENT OF AN EXITING 3 FAMILY DWELLING, 2 1/2 WITH CELLAR RESIDENTIAL BUILDING TO CONERT INTO A 2 STORY COMMUNITY FACILITY (HOUSE OF WORSHIP) AND COMPLY WITH NB REQUIREMENT No product keyword matched | 3 | Aug 26, 2026 |
| B | HNJ CONSTRUCTION CORP NYC DOB building permits | 10 | Construction Fence · SITE FENCE APPLICATION IN CONJUNCTION WITH ALT-1 FILING FOR REPAIR FIREDAMAGE AND ADD SECOND FLOOR TO EXISTING ONE FAMILY DWELLING No product keyword matched | 1 | Aug 26, 2026 |
| B | URBAN-SCAPE LLC, MLM PARTNERS LLC, NYC DOB building permits | 10 | General Construction · Interior renovation of exisitng reatil store as per plan. New Partitions and finishes as per plan. No change to use, egress or occupancy under this application. No product keyword matched | 1 | Aug 26, 2026 |