Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,502
Tier S19
New this week126
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
B713 Madison Avenue Corp
NYC DOB building permits
10
Plumbing · REMOVE & CAP ONE (1) WC, ONE (1) BT & ONE (1) LAV @ 005, INSTALL ONE (1) NON RES SINK @ 004. REPLACE TWO (2) WC & TWO (2) LAVS @ CEL, REPLACE, ONE (1) WC & ONE (1) LAV @ 004 & 005.
No product keyword matched
1Sep 1, 2026
BTSF AUTO SALES
Seer chat
NYC DOB building permits
10
General Construction · CONSTRUCT A ONE FAMILY DETACHED RESIDENCE WITH BUILT-IN TWO CAR GARAGE
No product keyword matched
1
Sep 1, 2026
B2222 EAST 1ST LLC
NYC DOB building permits
10
Plumbing · SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND GAS PIPES, IN CONJUNCTION TO ALT JOB -B01074652-I1
No product keyword matched
1Sep 1, 2026
BWILTON CONSTRUCTION MNGRS
NYC DOB building permits
10
Mechanical Systems · Mechanical scope for Suite 1208 & 1218: Interior renovations as per plans filed herewith. No change to use, egress or occupancy.
No product keyword matched
1Sep 1, 2026
B522 W 142
NYC DOB building permits
10
General Construction · Change the use in Cellar from Eating & Drinking Establishment to Retail; 18,498 S.F. interior renovation with new partitions, demolition of non-structural partitions, relocation of an egress stair.
No product keyword matched
1Sep 1, 2026
BKAMILLA LITVINOV DESIGNS
NYC DOB building permits
10
Support of Excavation · support of excavation and underpinning as per plans
No product keyword matched
1Sep 1, 2026
B369 MANHATTAN LLC
NYC DOB building permits
10
Plumbing · INSTALL ON-SITE STORMWATER INFILTRATION SYSTEM IN REAR YARD TO HANDLE YARD STORMWATER AS PART OF THE WORK RELATED TO THE PROPOSED RESIDENTIAL BUILDING FILED UNDER NYCDOB NB #321595788-01-NB
No product keyword matched
1Sep 1, 2026
BWING TAI CONSTRUCTION INC
NYC DOB building permits
10
General Construction · PROPOSED INTERIOR RENOVATION ON 3RD FLOOR APT#3C. REPAIRING PARTITIONS, CEILING AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
1Sep 1, 2026
BNEW MUSEUM
NYC DOB building permits
10
General Construction · CONSTRUCT INTERIOR NON LOAD BEARING PARTITIONS ON THE 2ND, 3RD AND 4TH FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
No product keyword matched
2Sep 1, 2026
BCHEN 262 REALTY LLC
NYC DOB building permits
10
Curb Cut · INSTALL 10' DROP CURB WITH 1'-6 SPLAYS ON BOTH SIDE
No product keyword matched
1Sep 1, 2026
BAMERESCO, INC
Austin issued construction permits, NYC DOB building permits
10
Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUDING ALL RELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
No product keyword matched
8Sep 1, 2026
BBUILDHOUSER Inc.
NYC DOB building permits
10
Mechanical Systems · MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01222960-I1
No product keyword matched
1Sep 1, 2026
BBSD 530 BROADWAY PROPCO
NYC DOB building permits
10
Sprinklers · Hereby filing to remove and install sprinkler heads with related piping for lobby renovation as shown on plans filed herewith. No change to use, occupancy or egress.
No product keyword matched
1Sep 1, 2026
B18E74LLC
NYC DOB building permits
10
Plumbing · Filing for the removal of plumbing fixtures and addition of new fixtures and components on floors 001 through 006, as per plans submitted.
No product keyword matched
1Sep 1, 2026
BDNJ INDUSTRIES INC DBA DNJ MECHANIC
NYC DOB building permits
10
Plumbing · Filing for replacement of existing gas RTUS, originally installed under NB 301144269. Mechanical systems filed under B00809873-I1
No product keyword matched
1Sep 1, 2026
BA & S SCULLARI CONSTRUCTI
NYC DOB building permits
10
Foundation · UNDERPINNING FILED IN CONJUNCTION WITH RENOVATION OF 4 STORY RESIDENTIAL BUILDING. ALT-CO FILED UNDER B00680157-I1. SOE FILED UNDER B00680157-S1.
No product keyword matched
1Sep 1, 2026
BBSD CORP. KINGS
NYC DOB building permits
10
General Construction · Propose renovation of existing commercial space at 001 floor. Removal and installation of non load bearing partitions and related finishes, all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
No product keyword matched
1Sep 1, 2026
BISLAND INTERIORS DESIGN
NYC DOB building permits
10
Support of Excavation · Support of Excavation for new areaway at rear
No product keyword matched
3Sep 1, 2026
BEleven Waverly Associates LLC
NYC DOB building permits
10
Plumbing · PLUMBING WORK FOR MINOR ALTERATION OF AN EXISTING RESIDENTIAL SPACE ON 5TH & 7TH FLOOR APT #5J , 7F, 7H, AND 7L. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
No product keyword matched
2Sep 1, 2026
BJACK SHAINMAN GALLERY
NYC DOB building permits
10
General Construction · Temporary structures for a fashion show inside the gallery. Removed at the end of the programing. No changes to existing structures, use or egress.
No product keyword matched
1Sep 1, 2026
BKalmon Dolgin Affiliates Inc.
NYC DOB building permits
10
General Construction · SPOT POINTING AND WINDOW LINTEL REPLACEMENT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION
No product keyword matched
2Sep 1, 2026
BBLOCK MANAGEMENT INC.
NYC DOB building permits
10
Supported Scaffold · INSTALLATION OF PIPE SCAFFOLD AT 31-25 31 STREET QUEENS NY 11106 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
2Sep 1, 2026
BFAMILY CENTER ASSOCIATES
NYC DOB building permits
10
General Construction · REPLACE / REBUILD BULGING PORTION OF CMU/MASONRY WALL FOR A LENGTH OF APPROXIMATELY 18' AND 42 HIGH AS PER PLANS. THE PORTION TO BE REPLACED IS NOT A RETAINING WALL. OBTAIN GC PERMIT. REMOVE ONE LARGE TREE AND ALSO SOME OTHER SMALL TREES/BRANCHES.
No product keyword matched
1Sep 1, 2026
BP & R Construction MGT NY Corp
NYC DOB building permits
10
Plumbing · PLUMBING/SPRINKLER FILED IN-CONJUNCTION WITH NB JOB#:Q01228383
No product keyword matched
2Sep 1, 2026
BPAVARINI MCGOVERN LLC
NYC DOB building permits
10
Mechanical Systems · Mechanical applications filed in conjunction with residential unit conversion
No product keyword matched
3Sep 1, 2026
BINFINITY MANAGEMENT
NYC DOB building permits
10
General Construction · FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched
2Sep 1, 2026
BGrace Church In New York
NYC DOB building permits
10
Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched
1Sep 1, 2026
BSLR RESTORATION INC
NYC DOB building permits
10
General Construction · REPAIR OF WINDOW LINTELS & BRICK MASONRY RE-POINTING/RESTITCHING, ETC. NO CHANGE IN USE, EGRESS OR OCCUPANCY
No product keyword matched
1Sep 1, 2026
B116 PRINCE ST LLC
NYC DOB building permits
10
General Construction · HEREBY FILING FOR THE RENOAVTION OF EXISTING COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
2Sep 1, 2026
BB&L MANAGEMENT CO, LLC
NYC DOB building permits
10
Sprinklers · MODIFICATION OF EXIST SPRINKLER SYSTEM FOR CELLAR COMMERCIAL TENANT SPACE AS INDICATED ON DRAWINGS. 12 NEW CONCEALED HEADS + 6 NEW SIDE WALL HEADS
No product keyword matched
1Sep 1, 2026
BFINE WATERPROOFING INC
NYC DOB building permits
10
General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
1Sep 1, 2026
BSheradel Associates, LP
NYC DOB building permits
10
Sprinklers · Alteration of existing fire protection system including sprinkler heads, piping & valves of commercial space.
No product keyword matched
1Sep 1, 2026
BEstate Realty
NYC DOB building permits
10
General Construction · ordinary facades repairs as per plans herewith filed. work to take place within existing facade elevations.
No product keyword matched
1Sep 1, 2026
B3000 RICHMOND TER. LLC
NYC DOB building permits
10
Mechanical Systems · Application is being filed for mechanical system at the subject premises
No product keyword matched
1Sep 1, 2026
B2256-2258 Morris LLC
NYC DOB building permits
10
Plumbing · PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01252547-I1
No product keyword matched
7Sep 1, 2026
BARBERIA CONSTRUCTION INC
NYC DOB building permits
10
Construction Fence · temp construction fence
No product keyword matched
2Sep 1, 2026
BCLAIRE WEISZ ARCHITECTS, LLP DBA WX
NYC DOB building permits
10
General Construction · Roof replacement on 1 story residential building. Insulate above the roof and replace with metal pitched roof as shown on drawings filed herewith. Building height and shape of roof is not changing.
No product keyword matched
1Sep 1, 2026
BPark Slope 404 LLC
NYC DOB building permits
10
Foundation · LIMITED FOUNDATION WORK FOR (1) NEW INTERIOR ELEVATOR PIT AT BLDG CENTER, IN CONJUNCTION WITH ALT-CO JOB#B01266078-I1 (BY OTHERS).
No product keyword matched
1Sep 1, 2026
BMARK O'BRIEN DEVELOPMENT
NYC DOB building permits
10
Plumbing · HEREWITH TO PROPOSE PLUMBING SYSTEM AS PER PLANS. IN CONJUNCTION WITH DOB JOB# B00958099-I1
No product keyword matched
1Sep 1, 2026
BBULADO GENERAL CONTRACTOR
NYC DOB building permits
10
General Construction · The scope of work consist of replacing the front and rear parapet walls with new and includes associated facade repairs. No change to use, egress, or occupancy.
No product keyword matched
1Sep 1, 2026
BANDATE CONSTRUCTION CORP
NYC DOB building permits
10
General Construction · Pr. Repairs caused by fire. Pr. Interior renovations throughout as per plans, with exterior restoration as needed. No change to use, bulk or egress.
No product keyword matched
1Sep 1, 2026
BSPRINGFIELD GARDENS
NYC DOB building permits
10
Plumbing · FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH APPLICATION #X01394330-I1.
No product keyword matched
2Sep 1, 2026
BSFE ENGINEERING
NYC DOB building permits
10
Sprinklers · INSTALL NEW SPRINKLER AND PLUMBING SYSTEM FOR NEW 4 STORY MIXED USE BUILDING,NO CHANGE IN USE,EGRESS AND OCCUPANY.
No product keyword matched
7Sep 1, 2026
BSHOLOM & ZUCKERBROT REALTY LLC
NYC DOB building permits
10
Curb Cut · Installation of New Curb Cut at Existing Loading Area. No Change in Use, Egress, or Occupancy.
No product keyword matched
1Sep 1, 2026
Bany tire
NYC DOB building permits
10
General Construction · interior to convert first floor from AMBULATORY HEALTH FACILITY to 2 dwelling units , cellar to remain 1 AMBULATORY HEALTH FACILITY
No product keyword matched
1Sep 1, 2026
BUnion Turnpike LLC
NYC DOB building permits
10
General Construction · TENANT FINISH OF EXISTING SPACE WHICH INCLUDES, DEMO AND REBUILDING OF PARTITIONS.
No product keyword matched
1Sep 1, 2026
BMKON CONSTRUCTION INC
NYC DOB building permits
10
General Construction · General renovation of Apt. 3L. New Finishes, windows and kitchen cabinets. Replacement of plumbing fixture (separate filing). No change to use, occupancy or egress.
No product keyword matched
2Sep 1, 2026
BNY PRIME GROUP LLC
NYC DOB building permits
10
Full Demolition · Full demolition to a one story garage
No product keyword matched
1Sep 1, 2026
BDE CHANG LLC
NYC DOB building permits
10
Sprinklers · RENOVATION WITH SPRINKLER CONSTRUCTION WORKS FOR NB JOB FILED UNDER DOB # 321597205
No product keyword matched
2Sep 1, 2026
B210 EAST 15TH STREET TENANTS CORP
NYC DOB building permits
10
Plumbing · SUB DOC S1 FILED FOR REMOVAL OF GAS RANGE, REFRIGERATOR, & DISHWASHER AT APT 10D. NEW WASHER & DRYER., NO PLUMBING WORK TO APT 10E, (FILED IN CONJ. W/DOC I1)
No product keyword matched
2Sep 1, 2026
Showing 8,501–8,550 of 16,447
PreviousNext