Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | BIF AMERICA INC. NYC DOB building permits | 7 | General Construction · REMOVAL OF NON-ILLUMINATED & NON-FLASHING ACCESSORY BUSINESS SIGN ON STOREFRONT AT 2ND FLOOR LEVEL TO CLOSE/SIGN OFF THE OPEN SIGN APPLICATION # 420021149.NO ACTUAL WORK IS INVOLVED BECAUSE THE SIGN IS NOT EXISTING AT THE SITE ANYMORE. No product keyword matched | 0 | Jan 16, 2026 |
| C |
| COLUMBIA NYC DOB building permits |
| 7 |
Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Jan 16, 2026 |
| C | 108 Willow St LLC NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION ON THE 1ST AND 2ND FL OF EXISTING TOWNHOUSE FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 16, 2026 |
| C | PHIL'S AIR CONDITIONING & NYC DOB building permits | 7 | Mechanical Systems · INSTALL 2 TON, 4.5 TON & 5 TON CAPACITY VRF CONDENSING UNITS W/ 3 ASSOCIATED FAN COIL UNITS W/ DUCTWORK DISTRIBUTION FOR THE 1ST FL AND 2ND FL. OBTAIN THREE CERTIFICATION OF COMPLIANCE AS PER BC110.6 AND 28-116.4.1. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 16, 2026 |
| C | BURT WALLACK / WALLACK MGMT. NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION ON THE 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 16, 2026 |
| C | Hope Medical NYC DOB building permits | 7 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 16, 2026 |
| C | REGENT 33RD REALTY NYC DOB building permits | 7 | General Construction · INSTALL CHIMNEY EXTENSION. No product keyword matched | 0 | Jan 16, 2026 |
| C | WLYU LLC NYC DOB building permits | 7 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 0 | Jan 16, 2026 |
| C | H.T.LYONS, INC NYC DOB building permits | 7 | Mechanical Systems · Provide and install new cooling tower, centrifugal vortex separator and condenser water pumps. No change to use, occupancy or egress No product keyword matched | 0 | Jan 16, 2026 |
| C | FRIEDMAN ENGINEERING, PC NYC DOB building permits | 7 | Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jan 16, 2026 |
| C | BSUQRED DESIGNS NYC DOB building permits | 7 | General Construction · Repair/replace deteriorated wood girders in cellar: remove 2 damaged beams, install W8x28 steel beams with Simpson A34 connectors, drilled/grouted anchors, temporary shoring, and local masonry repairs per standards. No change to use, occupancy, or egress. No product keyword matched | 0 | Jan 16, 2026 |
| C | INTERSERV LP NYC DOB building permits | 7 | General Construction · GENERAL CONSTRUCTION FOR ALL RELATED INTERIOR WORK, NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 16, 2026 |
| C | 260 APARTMENTS CORP NYC DOB building permits | 7 | General Construction · REMOVAL OF EXISTING FINISHES AND NON LOAD BEARING PARTITIONS AS PER PLAN. ALL WORK IS INTERIOR ONLY. No product keyword matched | 0 | Jan 16, 2026 |
| C | MASPETH GENERAL CONTRACTI NYC DOB building permits | 7 | General Construction · General renovation of cellar and 1st floor No product keyword matched | 0 | Jan 16, 2026 |
| C | 112 WEST 28TH STREET LLC NYC DOB building permits | 7 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 0 | Jan 16, 2026 |
| C | Chez Champa LLC NYC DOB building permits | 7 | General Construction · TO PROPOSE INTERIOR RENOVATION AND INSTALL NEW SPLIT UNIT FOR EXISTING COMMERCIAL SPACE AT PARTIAL CELLAR AND 001 FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK TYPE AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | WINDSOR CONSTRUCTION GRP NYC DOB building permits | 7 | General Construction · INTERIOR NON-STRUCTURAL ALTERATION OF PENTHOUSE UNIT B (11B). REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 15, 2026 |
| C | 17-18 MANAGEMENT CO. LLC NYC DOB building permits | 7 | General Construction · BRICK REPLACEMENT, BRICK REPOINTING, LIMESTONE PATCH, LIMESTONE MORTAR JOINT REPLACEMENT, STUCCO REPAIR No product keyword matched | 0 | Jan 15, 2026 |
| C | Syed A Naqvi Engineering PLLC NYC DOB building permits | 7 | Plumbing · To address violations 35186075K;35049139J;35047864N;35068577N;35069590M;35047585K;35046620M;35044890N;35062047Z;35061714Z;35060873L;35058926N;35041266X;35056914R;35040738K;35055968H;34973153N;35068576L;35068575J to remove stove and sink from Attic . No product keyword matched | 0 | Jan 15, 2026 |
| C | new Beginings church NYC DOB building permits | 7 | General Construction · FILING TO CONVERT EXISTING BUILDING TO HOUSE OF WORSHIP No product keyword matched | 0 | Jan 15, 2026 |
| C | AP.MEP INC NYC DOB building permits | 7 | Plumbing · REPLACE EXISTING RANGE, REPLACE EXISTING BATHROOM AND KITCHEN FIXTURES, AND RELOCATE EXISTING WASHING MACHINE. No product keyword matched | 0 | Jan 15, 2026 |
| C | 300 WILD LLC NYC DOB building permits | 7 | Sign · REPLACEMENT FACE ONLY OF ILLUMINATED NON-ADVERTISING DOUBLE-SIDED ACCESSORY SIGN ON GROUND STRUCTURE FILED UNDER JOB NO: 520117882 - IN PROPERTY LINES - COUNTRY INN & SUITES BY RADISSON. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | 9206 ZYS LLC NYC DOB building permits | 7 | Plumbing · FILED PLUMBING WORK FOR AN EXIST. 2-STORY MIXED-USE BUILDING. RESTORE TO PRIOR LEGAL CONDITIONS. NO CHANGE TO EXIST. USE, EGRESS & OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | ATKO Construction Corp NYC DOB building permits | 7 | Plumbing · FILING FOR PLUMBING WORK AS PER PLANS No product keyword matched | 0 | Jan 15, 2026 |
| C | BRODSKY NYC DOB building permits | 7 | Suspended Scaffold · MATERIAL HOIST No product keyword matched | 0 | Jan 15, 2026 |
| C | KON HO LEE CONSULTING ENGINEER PLLC NYC DOB building permits | 7 | Curb Cut · Reduce existing curb cut to 10' including 1'-6 splays on both sides, in conjunction with job #321959118. No product keyword matched | 0 | Jan 15, 2026 |
| C | HERBERT ROSE, INC NYC DOB building permits | 7 | Suspended Scaffold · MAIN ROOF AND PARAPET WALLS REPLACEMENT WITH MINOR FACADE WORK. No product keyword matched | 0 | Jan 15, 2026 |
| C | HARD ROCK BUILDERS LLC NYC DOB building permits | 7 | General Construction · Minor interior renovation of existing apartment 10A at 2521 Palisade Avenue, Bronx No product keyword matched | 0 | Jan 15, 2026 |
| C | LAMSIA MANAGEMENT LLC NYC DOB building permits | 7 | Boiler Equipment · IT IS PROPOPSED TO REPLACE (1) BOILER AND (1) FUEL STORAGE OIL BURNER TO REMEDY VOILATION #39096091R. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | NEW FORCE CONSTRUCTION NYC DOB building permits | 7 | Sidewalk Shed · INSTALL SIDEWALK SHED, AS SHOWN ON PLANS. NO CHANGE IS USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | 460-26 BROOME STR LLC NYC DOB building permits | 7 | General Construction · MINOR INTERIOR RENOVATION OF EXISTING BUSINESS & SERVICE OFFICES WITH NEW NON STRUCTURAL PARTITION TO ENCLOSE AND EXPAND EXISTING PANTRY. SCOPE INCLUDES NEW LIGHTING FIXTURES THROUGHOUT AND NEW CABINETS & COUNTERS IN PANTRY. NO DEMOLITION THIS APPLICATION No product keyword matched | 0 | Jan 15, 2026 |
| C | One High Line Condominium/ Douglas NYC DOB building permits | 7 | General Construction · INTERIOR ALTERATION OF APARTMENT W31C ON THE 29TH CONSTRUCTION FLOOR/31ST MARKETING FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Jan 15, 2026 |
| C | Holtz House NYC DOB building permits | 7 | Plumbing · PROVIDING NEW GAS RISER AND GAS BRANCH PIPES AND CONNECT TO EXISTING GAS COOKING RANGES, GAS BBQ, AND TWO GAS DRYERS. No product keyword matched | 0 | Jan 15, 2026 |
| C | 235 West end avenue condominium NYC DOB building permits | 7 | Plumbing · PLUMBING FIXTURES REPLACEMENT FOR KITCHEN AND BATH IN APT. 8D AS PER PLANS FILED HEREWITH. NO ARCHITECTURAL WORK PROPOSED. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 15, 2026 |
| C | CHABAD WEST SIDE/CHABAD AT COLUMBIA NYC DOB building permits | 7 | General Construction · INTERIOR RENOVATION FROM CELLAR TO FIFTH FLOOR WITH CHANGE TO THE USE OF OCCUPANCY. ALL AS PER THE NYC CODE & ZONING RULES AND REGULATIONS. No product keyword matched | 0 | Jan 15, 2026 |
| C | ON-LINE ELECTRIC, INC NYC DOB electrical permits | 7 | reinstating Z139154 to get inspection. ApplicationM01050908I1EL was opened to correct the original and then a PAA. the original was NOT to be 10 panel only 1. Our work performed was only kitchen and bathroom light. 20 receptacles, 2 a/c, 20 fixtures, 10 switches No product keyword matched | 0 | Jan 15, 2026 |
| C | 1065 ATLANTIC AVENUE LLC NYC DOB building permits | 7 | Standpipe · Filing for modification to sprinkler system for additional sprinklers heads and relocation of standpipe fire hose valve for parking stackers in conjunction with new building# 121188918. No product keyword matched | 0 | Jan 14, 2026 |
| C | BRENNAN PROPERTY MANAGEMENT, LLC NYC DOB building permits | 7 | Plumbing · INSTALL GAS FIRE-PLACE - CONNECT TO EXISTING CHIMNEY LINED WITH FLEX PIPE APPROVED FOR GAS VENTING. No product keyword matched | 0 | Jan 14, 2026 |
| C | BAGAD REALTY LLC NYC DOB building permits | 7 | Structural · Filing Structural application subsequent to primary job number X00877321-I1. No product keyword matched | 0 | Jan 14, 2026 |
| C | lage Concrete LLC NYC DOB building permits | 7 | Earth Work · Foundation work for proposed concrete batching facility. No product keyword matched | 0 | Jan 14, 2026 |
| C | 60 GUILDERS, LLC NYC DOB building permits | 7 | Sprinklers · SPRINKLER FILING AS PER PLANS FILED No product keyword matched | 0 | Jan 14, 2026 |
| C | HI HAIR NYC DOB building permits | 7 | Sign · INSTALLATION OF NEW BUSINESS ACCESSORY ILLUMINATED WALL SIGN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 14, 2026 |
| C | JP CONSTRUCTION & HVAC LL NYC DOB building permits | 7 | Mechanical Systems · HVAC WORK AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jan 14, 2026 |
| C | Sharon NYC DOB building permits | 7 | Plumbing · Plumbing work filed in conjunction with general construction scope filed under DOB Now# Q01184236-S1. No change in use, egress, occupancy or bulk. No product keyword matched | 0 | Jan 14, 2026 |
| C | HONG KONG HOOD INC NYC DOB building permits | 7 | General Construction · PROPOSE FACADE RENOVATION FOR 1FL COMMERCIAL UNIT: REPLACE DOOR AND FACADE REFINISHING. (NO ZONING USE, FLOOR AREA, OCCUPANTS, AND EGRESS CHANGES) No product keyword matched | 0 | Jan 14, 2026 |
| C | BLADE CONTRACTING INC NYC DOB building permits | 7 | Plumbing · PROPOSED MODIFICATIONS TO EXISTING GAS PIPING SYSTEM AT GROUND FLOOR LEVEL AND BUILDING EXTERIOR TO ROOF IN SERVICE OF NEW GENERATOR REPLACEMENT FILED UNDER DOB APPLICATION #S00645595. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jan 14, 2026 |
| C | 187WP LLC NYC DOB building permits | 7 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING. No product keyword matched | 0 | Jan 14, 2026 |
| C | FIRST VULCAN, INC NYC DOB building permits | 7 | Plumbing · INSTALLATION OF NEW SPRINKLER SYSTEM WITH PLUMBING WORK ON FLOORS CELLAR, 01 THRU 6FL AND PH. No product keyword matched | 0 | Jan 14, 2026 |
| C | ZHR NYC DOB building permits | 7 | Sprinklers · HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT 5-STORY, 2-FAMILY TOWNHOUSE BUILDING. FILED IN CONJUNCTION WITH ALT TYPE 1, BIS # M00555528. No product keyword matched | 0 | Jan 14, 2026 |
| C | VINESKI-MAY PLB & HTG, L.L.C. NYC DOB building permits | 7 | Plumbing · Cap and remove existing boiler and HWH, relocate and replace some plumbing fixtures, some new plumbing fixtures, installation of new gas line from CEL to 1st and 2nd, installation of new condensing combi-boilers. No product keyword matched | 0 | Jan 14, 2026 |