Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Integrity capital holding llc NYC DOB building permits | 11 | Construction Fence · Install 8' solid wood construction fence around the property. No product keyword matched | 1 | Nov 9, 2026 |
| B | THE HOLY TRINITY BAPTIST CHURCH NYC DOB building permits |
| 11 |
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched |
| 1 |
| Nov 9, 2026 |
| B | Civic BX LLC NYC DOB building permits | 11 | Plumbing · IT IS PROPOSED TO FILE FOR PLUMBING WORK FOR PROPOSED SCHOOL ENLARGEMENT AS SHOWN ON PLANS. No product keyword matched | 9 | Nov 9, 2026 |
| B | ANISKA31 REALTY LLC NYC DOB building permits | 11 | Construction Fence · Installation and use of temporary construction fence as per plans filed herewith. This application is filed in conjunction with NB Q01359877-I1. No product keyword matched | 1 | Nov 9, 2026 |
| B | MIRIMAR MANAGEMENT CORP NYC DOB building permits | 11 | Mechanical Systems · REPLACE EX. KITCHEN HOOD, EX. EXHAUST FAN AND EX. ACCESSORY DUCTS. No product keyword matched | 1 | Nov 9, 2026 |
| B | AMW PLUMBING INC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH ALTERATION TYPE 1 JOB 321589946. No product keyword matched | 8 | Nov 9, 2026 |
| B | GRAND CONSTRUCTION AND DE NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF DUCTLESS A/C_HEAT PUMP AND DRYER VENT No product keyword matched | 1 | Nov 9, 2026 |
| B | MIAO YAN LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 3 | Nov 9, 2026 |
| B | FULIN CONSTRUCTION NY INC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMOPARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 8 | Nov 9, 2026 |
| B | B10 SoHo Retail JV LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE INUSE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 9, 2026 |
| B | Q & C 195 LLC NYC DOB building permits | 11 | General Construction · NEW 2-STORY BUILDING FOR 2-FAMILY RESIDENCE. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 9 | Nov 9, 2026 |
| B | Abramson Brothers Inc NYC DOB building permits | 11 | General Construction · Conversion of existing commercial building to residential. No product keyword matched | 1 | Nov 9, 2026 |
| B | Fourty Sixth Ave LLC NYC DOB building permits | 11 | Construction Fence · Temporary 8' construction fence for new building, filed in conjunction with fence application filed under Q01425664-S8, fence to include Tax lots 1 & 44. No product keyword matched | 2 | Nov 9, 2026 |
| B | HOLIDAY INN EXPRESS BROOKLYN NYC DOB building permits | 11 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS TO BE FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 9, 2026 |
| B | COLUMBIA INTERNATIONAL NYC DOB building permits | 11 | General Construction · TENANT FIT-OUT OF AN EXISTING EATING AND DRINKING ESTABLISHMENT. INSTALL NEW PARTITIONS, AND EQUIPMENTS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | OnPoint Development NYC LLC NYC DOB building permits | 11 | Construction Fence · CONSTRUCTION FENCE No product keyword matched | 1 | Nov 9, 2026 |
| B | EHL DEVELOPMENT LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 4 | Nov 9, 2026 |
| B | LITHOS CONSTR SOLUTI INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION ON THE 1ST FLOOR WHITE BOX AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | GALA DESIGNS CORP NYC DOB building permits | 11 | General Construction · Application filed to combine Apartments #1203 and #1204 on the 12th floor into one apartment. Work includes non-structural demo, minor partition work and associated finishes as per plans filed. No change in use, egress or occupancy. No product keyword matched | 1 | Nov 9, 2026 |
| B | TAYLOR MADE CONTR. LLC NYC DOB building permits | 11 | General Construction · New 3 Piece Bathroom in Basement No product keyword matched | 3 | Nov 9, 2026 |
| B | EXCELLEMT INTERIOR INC NYC DOB building permits | 11 | Full Demolition · Full demolition to a two story building No product keyword matched | 2 | Nov 9, 2026 |
| B | FIRST STAR ELECTRIC INC. NYC DOB electrical permits, NYC DOB building permits | 11 | temporary lights and power No product keyword matched | 16 | Nov 9, 2026 |
| B | VL Construction Group Inc NYC DOB building permits | 11 | Sidewalk Shed · Permit is for temporary sidewalk shed. No change in use, occupancy or egress. No product keyword matched | 5 | Nov 9, 2026 |
| B | CHAMPION PARKING NYC DOB building permits | 11 | General Construction · REPLACE (2) SKYLIGHTS ON TOP OF EXISTING (2) BULKHEADS WITH NEW METAL ROOF, ALL PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. No product keyword matched | 1 | Nov 9, 2026 |
| B | TRIOST PROPERTIES LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 4 | Nov 9, 2026 |
| B | EAST END CONSTRUCTION & R NYC DOB building permits | 11 | General Construction · Fire Restoration & Rehabilitation. Remove & Replace GWB in the Basement, Cellar, Fl.'s 1+2. Replace Windows (2nd Fl.), Insulation & Trim as needed. Restore Int. Finishes throughout all affected areas, no change to existing structure, framing, or layouts. No product keyword matched | 3 | Nov 9, 2026 |
| B | DWF VI 325 HUDSON, LLC NYC DOB building permits | 11 | Sprinklers · Modification to existing sprinkler system and installation of plumbing fixtures as per plans. No product keyword matched | 7 | Nov 9, 2026 |
| B | 46 AVE ESTATE LLC NYC DOB building permits | 11 | Support of Excavation · FILE SOE IN CONJUNCTION WITH JOB#Q01344902 No product keyword matched | 6 | Nov 9, 2026 |
| B | LONG SHOT CRANE LLC NYC DOB building permits | 11 | Sign · PROPOSE NEW ONE ILLUMINATED, NON FLASHING, ACCESSORY BUSINESS SIGN & ONE NON-ILLUMINATED BLADE SIGN FOR EXISTING PARTICAL FRIST FLOOR COMMMCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 18 | Nov 9, 2026 |
| B | UGB DESIGN & BUILD INC NYC DOB building permits | 11 | General Construction · ALT CO FILED FOR CONVERSION TO SINGLE FAMILY HOME, CONVERT PENTHOUSE TO 6TH FLOOR, NET REDUCTION IN FLOOR AREA, GUT RENOVATION AS PER PLANS. No product keyword matched | 2 | Nov 9, 2026 |
| B | CHAMBERS COMPANY LLC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade inspection /repair SR21/1350 No product keyword matched | 4 | Nov 9, 2026 |
| B | INTELLIVOLT LLC NYC DOB building permits | 11 | Construction Fence · Construction fence associated with primary application No product keyword matched | 3 | Nov 9, 2026 |
| B | YE'S NATIONAL CONSTRUCTION NYC DOB building permits | 11 | Full Demolition · FILING HEREWITH FULL DEMOLITION OF TWO-STORY DWELLING AS INDICATED ON PLANS. No product keyword matched | 3 | Nov 9, 2026 |
| B | FOREVER SUMMIT LLC NYC DOB building permits | 11 | Construction Fence · ERECT CONSTRUCTION FENCE No product keyword matched | 3 | Nov 9, 2026 |
| B | NWSC NYC DOB building permits | 11 | Mechanical Systems · Modification to mechanical systems on part of 1st floor. Demolition and reconnecting of existing after demo done. No product keyword matched | 9 | Nov 9, 2026 |
| B | 39 JS PROPERTY LLC NYC DOB building permits | 11 | Plumbing · New plumbing systems is to be installed throughout the entire building and open space No product keyword matched | 10 | Nov 9, 2026 |
| B | THE PLUMBING AND SPRINKLER CORP. NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF NEW SPRINKLER SYSTEM FLOOR BASEMENT, 1-2 AS INDICATED ON THE DRAWINGS No product keyword matched | 31 | Nov 9, 2026 |
| B | HILINE CONSTRUCTION & REN NYC DOB building permits | 11 | General Construction · INSTALLATION OF STUCCO AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY WITH THIS APPLICATION No product keyword matched | 2 | Nov 9, 2026 |
| B | AEH BUILDERS CORP NYC DOB building permits | 11 | Plumbing · i am doing the interior plumbing only No product keyword matched | 13 | Nov 9, 2026 |
| B | empire city construction service ll NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 14 | Nov 9, 2026 |
| B | 90-20 Elmhurst Avenue, LLC NYC DOB building permits | 11 | Foundation · Foundation Scope in conjunction with Alteration -CO Application to accommodate new Elevator Shaft, New Stairs for change in use and proposed new vertical enlargement No product keyword matched | 4 | Nov 9, 2026 |
| B | NONSTOP CONSTRUCTION INC NYC DOB building permits | 11 | Foundation · FOUNDATION WORK FOR ENLARGEMENT OF THE EXISTING BUILDING. No product keyword matched | 2 | Nov 9, 2026 |
| B | SELECT OR ENTER NYC DOB building permits | 11 | General Construction · DEMOLITION OF INTERIOR NON-LOADBEARING PARTITIONS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 2 | Nov 9, 2026 |
| B | RSJ CONTRACTING SERVICE LLC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Nov 9, 2026 |
| B | NORTHERN STAR TEXTILE CORP. NYC DOB building permits | 11 | Sign · ERECT NON-ILLUMINATED DOUBLE SIDED BLADE SIGN WORDING N.W. AS PER DRAWING FILE HEREWITH. No product keyword matched | 4 | Nov 9, 2026 |
| B | SRL PLUMBING AND HEATING INC NYC DOB building permits | 11 | Plumbing · NEW PLUMBING CONSTRUCTION 1.CELLAR PL - (RP) K.SINK, (RP) WASHER, (RP) SINK, (RP)TOILET, (RP) SHOWER ; NEW GAS WORK 1.CELLAR- (PRO) 2 NEW BOILER COMBI, (R) OIL BOILER, (R) W/H No product keyword matched | 5 | Nov 9, 2026 |
| B | JEANNE JUGAN RESIDENCE NYC DOB building permits | 11 | General Construction · HEREWITH FILING MASONRY AND ROOFING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | TOWER DEVELOP & BUILDERS NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL FILED HEREWITH IN CONJUNCTION WITH Q00612960-I1 No product keyword matched | 3 | Nov 9, 2026 |
| B | BLDG NYC DOB building permits | 11 | Sprinklers · Filing for sprinkler work at the 1st, 6th, and 7th floor. No change to use, egress, or occupancy No product keyword matched | 4 | Nov 9, 2026 |
| B | SKY TOUCH RENOVATION INC NYC DOB building permits | 11 | General Construction · Interior renovation of 2-bedroom apartment including minor non-structural partition demolition, new partitions, new flooring. No change to use, egress or occupancy. No product keyword matched | 2 | Nov 9, 2026 |