Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CM AND ASSOCIATES CONST NYC DOB building permits | 10 | General Construction · HEREWITH FILING NEW MIXED-USE BUILDING AS PER PLANS. No product keyword matched | 1 | Sep 2, 2026 |
| B | NYFF EVENTS LLC NYC DOB building permits | 10 |
General Construction · Install of temp Truss structure, prod equip, no alt to exist structures for GAP NYFW Pop-Up Activation. TPA not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event complete No product keyword matched |
| 1 |
| Sep 2, 2026 |
| B | TCS CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · in the cellar of a mixed use building, create walls around an existing boiler to create an enclosed boiler room. no change in use, egress or occupancy. No product keyword matched | 1 | Sep 2, 2026 |
| B | MS GC NY LLC NYC DOB building permits | 10 | Support of Excavation · APPLICATION HEREBY FILED FOR FOUNDATION WORK AND SPECIFICATIONS IN CONJUNCTION WITH DOB BIS APPLICATION NO. 321389403 No product keyword matched | 4 | Sep 2, 2026 |
| B | CORLEAR MANAGEMENT LLC NYC DOB building permits | 10 | Mechanical Systems · PROPOSE SUBSEQUENT MECHANICAL SYSTEM WORKS AS PER PLAN IN CONJUNCTION WITH NB #X01038411-I1. No product keyword matched | 2 | Sep 2, 2026 |
| B | 304 MULBERRY STREET OPERATING COMPA NYC DOB building permits | 10 | General Construction · Herewith filing for facade repair as per the drawings. No change in use, egress or occupancy No product keyword matched | 2 | Sep 2, 2026 |
| B | POWERHOUSE ARTS NYC DOB building permits | 10 | General Construction · Temporary Installations to be used on a temporary event Williamsburg Store Opening Event. All the Installations are to be removed upon completion of the event. No product keyword matched | 1 | Sep 2, 2026 |
| B | 1150 52 llc NYC DOB building permits | 10 | Sprinklers · SPRINKLER PLANS FILED HEREWITH IN CONJUNCTION WITH B01239477-I1 No product keyword matched | 1 | Sep 2, 2026 |
| B | GREENWOOD MONITORING LLC NYC DOB building permits | 10 | Support of Excavation · SOE WORK No product keyword matched | 3 | Sep 2, 2026 |
| B | 69-40 Austin Street Partner LLC Rec NYC DOB building permits | 10 | Structural · STRUCTURAL WORK ASSOCIATED WITH ALTERATION AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Sep 2, 2026 |
| B | 111 EAST 56TH STREET, INC. NYC DOB building permits | 10 | Plumbing · RECONNECT EXISTING LOW PRESSURE GAS LINE. (2) NEW GAS TRAINS. (1) NEW HOT WATER HEATER WITH (2) NEW STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY. No product keyword matched | 3 | Sep 2, 2026 |
| B | PAL-MAR PLBG & HTG INC NYC DOB building permits | 10 | Plumbing · Replace plumbing for kitchens and bathrooms back to the risers. No change to use, occupancy or egress. No product keyword matched | 7 | Sep 2, 2026 |
| B | ATCO PROPERTIES & MGMT NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 2, 2026 |
| B | GM 88 DEVELOPMENT CORP NYC DOB building permits | 10 | General Construction · HEREWITH FILE ALT CO FOR TO ADD A SECOND STORY TO AN EXISTING 1 STORY COMMERICAL BUILDING, IN ORDER TO DO VERTICAL ENLARGEMENT, AND TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 3 | Sep 2, 2026 |
| B | 182 HESTER ST LLC NYC DOB building permits | 10 | General Construction · MINOR INTERIOR PARTITION WORK WITH PATCH, PAINT AND REPAIR AS NECESSARY AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 2, 2026 |
| B | A.M.K. CONTRACTING CORP NYC DOB building permits | 10 | Foundation · FOUNDATION WORK FILED IN CONJUNCTION WITH EXISTING BUILDING ALTERATION APPLICATION. No product keyword matched | 1 | Sep 2, 2026 |
| B | GREEN ROCK MANAGEMENT NYC DOB building permits | 10 | Plumbing · Plumbing work for tenant fit-out of Jersey Mike's restaurant at this location. No change in use, egress, or occupancy under this application. No product keyword matched | 1 | Sep 2, 2026 |
| B | 64-20 68TH AVENUE LLC NYC DOB building permits | 10 | Plumbing · THIS APPLICATION IS FILED FOR ALL THE PLUMBING, & SPRINKLERS WORK IN CONJ WITH ALT-1 APPLICATION # Q01172346, NEW PLUMBING FIXTURES FOR 3 NEW KITCHENS & BATHROOMS, No CHANGE OF USE EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 2, 2026 |
| B | xxx-xx-xxxx NYC DOB building permits | 10 | Structural · PROPOSED REPLACING SLAB ON GRADE AND NEW CELLAR PLST AND NEW BASEMENT GIRDER.PROPOSED STRUCTURAL WORK IN CONJUNCTION WITH DOB NOW JOB#B01459034-I1.NO CHANGE IN USE,MEANS OF EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Sep 2, 2026 |
| B | MELROSE, LLC NYC DOB building permits | 10 | Sprinklers · SP APPLICATION HEREBY FILED IN CONJUCTION TO JOB #B01263135 No product keyword matched | 1 | Sep 2, 2026 |
| B | VARDARO CONSTRUCTION CORP NYC DOB building permits | 10 | Structural · Filing structural and foundation plans related to the proposed addition of a new exterior walk-in freezer at rear of building. No change to use, egress, or occupancy. No product keyword matched | 1 | Sep 2, 2026 |
| B | TOMEK BUILDERS CORP NYC DOB building permits | 10 | Structural · Filing herewith to build 563 sqft cold form steel rooftop addition above existing two story single family residential building. Remove & replace existing roof parapet walls and existing roof structure to support new rooftop addition. No product keyword matched | 1 | Sep 2, 2026 |
| B | staten Island NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW HVAC AND ERV SYSTEMS FOR THE HEATING, COOLING, AND VENTILATION OF EACH DWELLING UNIT IN THE BUILDING No product keyword matched | 1 | Sep 2, 2026 |
| B | SKINNER PLMNG & HTG CORP NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF SPECIAL FIRE BOOSTER PUMP AND JOCKEY PUMP INSTALLATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Sep 2, 2026 |
| B | DIMAGGIO REALTY MANAGEMENT LLC NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION TO RENOVATE DOCTOR'S OFFICE ON THE 1ST FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 1 | Sep 2, 2026 |
| B | NORDIC CUSTOM BUILDERS IN NYC DOB building permits | 10 | Mechanical Systems · Filing for new mechanical work at apt 1/2B at the 1st and 2nd floor. No change to use, egress, or occupancy. No product keyword matched | 2 | Sep 2, 2026 |
| B | LYC?E FRAN?AIS DE NEW YORK NYC DOB building permits | 10 | Mechanical Systems · HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Sep 2, 2026 |
| B | LAKEWOOD GROUP CORP NYC DOB building permits | 10 | Construction Fence · Fence will be installed to protect site during full demolition No product keyword matched | 2 | Sep 2, 2026 |
| B | BLUEBUILD MGMT INC NYC DOB building permits | 10 | General Construction · Interior build-out at cellar for restaurant, first floor for market and second floor for community social club. No work to 3rd or 4th floors to this existing 4 story building. No product keyword matched | 1 | Sep 2, 2026 |
| B | TEN TALENTS MANAGEMENT NYC DOB building permits | 10 | General Construction · PROPOSE A NEW 6-STORY WITH MEZZANINE RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O. No product keyword matched | 1 | Sep 2, 2026 |
| B | STEVE IKE REALTY NYC DOB building permits | 10 | Structural · Herewith filing an application for structural support for the HVAC unit at the roof level, as per the plans. No change of use, egress or occupancy. No product keyword matched | 1 | Sep 2, 2026 |
| B | L TREE REALTY LLC NYC DOB building permits | 10 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 1 | Sep 2, 2026 |
| B | F4 Development Group LLC NYC DOB building permits | 10 | Foundation · Herewith filing for underpinning work in conjunction with Alteration CO # B01234238-I1 No product keyword matched | 1 | Sep 2, 2026 |
| B | CAIN MANAGEMENT II, INC. NYC DOB building permits | 10 | General Construction · RENO. OF EXT'G DUNKIN'/BASKIN ROBINS STORE. INSTALL NEW NON-LOAD-BEARING PARTITION. REPLACE EXT'G WALL FINISHES, AS NEEDED. UPDATE LIT'G FIX'T W/ NEW AS NEEDED. INSTALL NEW TYPE-II HOOD ABOVE SANDWICH STATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 2, 2026 |
| B | ATTILIO DEVELOPERS CORP NYC DOB building permits | 10 | General Construction · APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATIONS TO APARTMENT 6A TO INSTALL NON-LOAD BEARING PARTITIONS AND ENLARGE EXISTING KITCHEN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 2, 2026 |
| B | GRD CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING TWO FAMILY HOME, INCLUDING PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 2, 2026 |
| B | DROM REALTY LLC NYC DOB building permits | 10 | Sprinklers · PROPOSED SPRINKLER ENTIRE BUILDING. FILED IN CONJUNCTION WITH ALT 1 APPLICATION# 321595412. No product keyword matched | 2 | Sep 2, 2026 |
| B | NY MARKET REAL ESTATE NYC DOB building permits | 10 | General Construction · Rehab/ reconstruct (6) apt interiors #7-27-37-47-57-67 (after water + smoke remediation ) plus corridor work, interior finishes , non load bearing partitions , kitchen and bathrooms. Respond to Violation #V 053024C24-0. no change in use, egress, occupancy No product keyword matched | 1 | Sep 2, 2026 |
| B | HAPPY HK CONSTRUCTION INC NYC DOB building permits | 10 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING BUILDING CONVERSION AND ENLARGMENT FILED UNDER APPLICATION M01041376. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 2, 2026 |
| B | FOUR STAR AIR CON'D CO LL NYC DOB building permits | 10 | Mechanical Systems · Installation of 5 Heat Pump Systems as shown on submitted plans. No change in occupancy, use or egress. No product keyword matched | 1 | Sep 2, 2026 |
| B | RAGNAROK CONSULTING SERVICES, LLC. NYC DOB building permits | 10 | Construction Fence · Hereby filing for erecting of temporary construction force as per plans submitted herewith. No product keyword matched | 1 | Sep 2, 2026 |
| B | JOHN HLAD PLUMBING & HEAT NYC DOB building permits | 10 | Plumbing · SITE & INTERIOR PLUMBING WORK ASSOCIATED W/ALTERATION/ENLARGEMENT OF/TO EXISTING DETACHED RESIDENCE (S01361967-I1). No product keyword matched | 2 | Sep 2, 2026 |
| B | LJG CONSTRUCTION LLC NYC DOB building permits | 10 | General Construction · Minor partition interior partition changes and finishes on the 1st floor and new balcony and exterior stair. No product keyword matched | 1 | Sep 2, 2026 |
| B | Roebling Management LLC NYC DOB building permits | 10 | Sign · ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING LAUNDRY LEOPARD No product keyword matched | 4 | Sep 2, 2026 |
| B | Bowery presents NYC DOB building permits | 10 | General Construction · Temporary platforms for the Best In Show event. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 2 | Sep 2, 2026 |
| B | 63 65 & 67 W 107 ST. CONDOMINIUM NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 2, 2026 |
| B | ANS3 CORP NYC DOB building permits | 10 | Plumbing · PLUMBING WORK FOR PROPOSED SINGLE FAMILY DWELLING, NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Sep 2, 2026 |
| B | R B MECHANICAL, LLC NYC DOB building permits | 10 | Plumbing · INSTALL GAS FIREPLACE WITHIN CONSTRUCTION ALREADY CREATED UNDER APPLICATION #500232358 No product keyword matched | 1 | Sep 2, 2026 |
| B | ABC MADISON BUILDERS INC NYC DOB building permits | 10 | General Construction · Facade repairs as shown on plans. No change in use, occupancy or egress. No product keyword matched | 3 | Sep 2, 2026 |
| B | GREEN RENOVATION NY INC NYC DOB building permits | 10 | General Construction · APPLICATION FILE TO EXTERIOR FACADE REPAIR AS BROWN STONE STEP REPAIR AND FACADE REPAIR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 2, 2026 |