Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | WEBSTER ASSOCIATES NYC DOB building permits | 10 | Sprinklers · Installation of 64 new sprinkler heads in proposed McDonalds Restaurant. No change in use, egress or occupancy. No product keyword matched | 2 | Sep 8, 2026 |
| B | T&I CONSTRUCTION INC NYC DOB building permits |
| 10 |
General Construction · New 3 story mix-used building, commercial store, community office and 5 dwelling units. obtain new c of o. No product keyword matched |
| 11 |
| Sep 8, 2026 |
| B | WINDSOR HOTEL NYC DOB building permits | 10 | Plumbing · REMOVE GAS PIPING FROM THE DEMOLISHED GAS FIRE ABSORPTION CHILLERS AND PROVIDE NEW GAS PIPING FOR NEW GAS FIRE BOILERS. NO CHANGE OF USE, EGRESS AND OCCUPANCY No product keyword matched | 2 | Sep 8, 2026 |
| B | ESHCO REAL ESTATE & MANAGEMENT NYC DOB building permits | 10 | Plumbing · INTERIOR RENOVATION IN EXISTING APARTMENT UNIT 34 No product keyword matched | 1 | Sep 8, 2026 |
| B | 3826 LIC LLC NYC DOB building permits | 10 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE WORK AT OSP. OUTSIDE 5 FEET OF FRONT PROPERTY LINE. AND INSTALL ON SIDE AND REAR PROPERTY LINE AS PLAN. IN CONJUNCTION WITH NB APPLICATION #Q00713167-I1. No product keyword matched | 1 | Sep 8, 2026 |
| B | J&M PLUMBING OF WESTCHEST NYC DOB building permits | 10 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS CONSTRUCTION# M01375162-i1.OF APT 7H AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. GENERAL No product keyword matched | 1 | Sep 8, 2026 |
| B | SAJID CONTRACTING CORP NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 8, 2026 |
| B | Federal Realty NYC DOB building permits | 10 | General Construction · NO CHANGE IN USE, OCCUPANCY AND OR EGRESS UNDER THIS APPLICATION. SCOPE OF WORK TO INCLUDE REMOVAL OF INTERIOR FINISHES, REPLACEMENT OF INTERIOR PARTITIONS WITH NEW AND INSTALLATION OF NEW FINISHES THROUGHOUT No product keyword matched | 1 | Sep 8, 2026 |
| B | 163 west 165 LLC NYC DOB building permits | 10 | Standpipe · Application herewith filed for standpipe in conjunction with Sprinkler job number X01263390-S6 No product keyword matched | 1 | Sep 8, 2026 |
| B | 2278 MOTT AVE LLC NYC DOB building permits | 10 | Boiler Equipment · HEREWITH FILE ALTERATION TYPE 2 IN ORDER TO DO A BOILER WORK TYPE FOR A PROPOSED THREE STORY TWELVE FAMILY MULTIPLE DWELLING, AND OBTAIN NEW CERTIFICATE OF OCCUPANCY . INSTALLATION OF 13 NEW BOILERS AT ROOF MECHANICAL ROOM No product keyword matched | 2 | Sep 8, 2026 |
| B | CBS BROADCASTING INC. NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 8, 2026 |
| B | JASON REAL ESTATE NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH GC#Q01297277-I1 No product keyword matched | 1 | Sep 8, 2026 |
| B | NYC Health + Hospitals / Elmhurst NYC DOB building permits | 10 | General Construction · Elmhurst Hospital Center Roof repairs as per the plans filed including: Removal/ replacement / repairs of existing roof membrane & flashings, existing roof drains and metal coating. Masonry repointing. Install guard rails, gutters and downspouts. No product keyword matched | 1 | Sep 8, 2026 |
| B | ELLIOTT DEVELOPMENT CORP NYC DOB building permits | 10 | Construction Fence · Construction Fence No product keyword matched | 1 | Sep 8, 2026 |
| B | THEGARDENBOND NYC DOB building permits | 10 | Protection and Mechanical Methods · Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 8, 2026 |
| B | MINOS CONSTRUCTION CORP NYC DOB building permits | 10 | Structural · NEW OPENING IN FACADE WALL FOR HVAC UNIT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 8, 2026 |
| B | THBD 2064 LLC NYC DOB building permits | 10 | Standpipe · PROPOSE INSTALLATION OF MANUAL TEMPORARY DRY STANDPIPE SYSTEM TO BE USED DURING CONSTRUCTION OPERATIONS FILED IN CONJUNCTION WITH NB #210179983 No product keyword matched | 1 | Sep 8, 2026 |
| B | Lincoln Guild Housing Corp. NYC DOB building permits | 10 | General Construction · Work includes per the filed plans remove/replace roof membrane, flashing, replace roof drains, repair/replace selected guard rails, remove/replace cracked masonry units, masonry repointing, repair spalled concrete, install brick cavity wall pinning No product keyword matched | 1 | Sep 8, 2026 |
| B | BEACWAY OPERATING, LLC. NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 8, 2026 |
| B | ESSENTIAL REMODELING INC NYC DOB building permits | 10 | Mechanical Systems · EXISTING 1-FAMILY RESIDENCE. INSTALL NEW HEAT PUMP HEATING AND COOLING SYSTEM INCLUDING EXTERIOR CONDENSER, INTERIOR AIR HANDLERS, AND ASSOCIATED PIPING. RELOCATE ELECTRICAL PANEL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 8, 2026 |
| B | AFFORDABLELIVINGNY NYC DOB building permits | 10 | General Construction · APPLICATION FILED FOR NEW 8-STORY BUILDING AS PER FILED HEREWITH. No product keyword matched | 2 | Sep 8, 2026 |
| B | WC 28 REALTY, LLC NYC DOB building permits | 10 | Sprinklers · Proposed: modification to the existing sprinkler system to include installation of 23 new sprinkler heads. No change of use, egress or occupancy. No product keyword matched | 1 | Sep 8, 2026 |
| B | DA PROJECT MANAGEMENT LLC NYC DOB building permits | 10 | Plumbing · FILING FOR PLUMBING WORK AS PER PLANS No product keyword matched | 1 | Sep 8, 2026 |
| B | 2160 Broadway, LLC NYC DOB building permits | 10 | Support of Excavation · PROPOSED SUPPORT OF EXCAVATION WORK FILING #M01220215-S1 IN CONJUNCTION WITH G/C FILING #M01220215-I1 No product keyword matched | 4 | Sep 8, 2026 |
| B | AC HOTEL TIMES SQUARE NYC DOB building permits | 10 | Sign · Installation of 410 sf of window decal on west windows. No product keyword matched | 1 | Sep 8, 2026 |
| B | FIVE TOWN NEON SIGN CO IN NYC DOB building permits | 10 | Sign · INSTALL EXTERIOR ILLUMINATED SIGN ON THE CANOPY ( NYU LANGONE HEALTH) No product keyword matched | 2 | Sep 8, 2026 |
| B | JIT CONSTR COMPANY CORP NYC DOB building permits | 10 | Mechanical Systems · ALT-II FILING RENOVATION OF CONVENIENCE STORE ONLY No product keyword matched | 3 | Sep 8, 2026 |
| B | 157 CHAMBERS RETAIL LLC NYC DOB building permits | 10 | Plumbing · RELOCATION OF (1) TOILET ROOM AND ADDITION OF (1) TOILET ROOM. PLUMBING SANITARY, VENT & WATER. No product keyword matched | 1 | Sep 8, 2026 |
| B | THE UP STUDIO NYC DOB building permits | 10 | Sprinklers · Sprinkler work associated with the renovation and vertical extension of the building as per plans filed herewith. No change to occupancy, use or egress under this application. No product keyword matched | 2 | Sep 8, 2026 |
| B | IA CONSTRUCTION MGMT, INC NYC DOB building permits | 10 | General Construction · Single-family residence. No change of occupancy, egress, or building area. No product keyword matched | 3 | Sep 8, 2026 |
| B | MDMB LLC NYC DOB building permits | 10 | Plumbing · Plumbing work in conjunction with the NB application #X01360064-I1 No product keyword matched | 1 | Sep 8, 2026 |
| B | 2027 LLC NYC DOB building permits | 10 | Structural · Filing to resolve OATH/ECB Violation # 39542165H and for general construction & structural work for a front & rear enlargement at second floor. No product keyword matched | 2 | Sep 8, 2026 |
| B | SUNRISE SPRING (NYC) LLC NYC DOB building permits | 10 | Structural · PARTIAL DEMOLITION FILING FOR THE ENGINEERED REMOVAL SEQUENCE OF EXISTING ROOF DECKING, CURB, FRAMING AND CURRENTLY SUPPORTING COLUMNS. TO BE REPLACED BY MEMBERSPROPOSED ON ST-FILING. No product keyword matched | 1 | Sep 8, 2026 |
| B | 21-23 East 7th LLC NYC DOB building permits | 10 | Plumbing · RENOVATION OF APARTMENT 4 IN EXISTING BUILDING AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS No product keyword matched | 1 | Sep 8, 2026 |
| B | TOUCHSTONE RENOVATIONS LL NYC DOB building permits | 10 | Structural · HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANC No product keyword matched | 1 | Sep 8, 2026 |
| B | 184694 NYC DOB building permits | 10 | General Construction · Convert 1 family to a 2 family residence- add 1 story extension to rear; add second floor; new finishes as per the plans filed herewith No product keyword matched | 1 | Sep 8, 2026 |
| B | POWER COOLING INC NYC DOB building permits | 10 | General Construction · THE SCOPE INCLUDES RENOVATION OF THE BASE BUILDING CHILLER PLANT TO INCLUDE THE REMOVAL OF EXISTING ABSORPTION CHILLERS AND SYSTEM COMPONENTS IN ACCORDANCE WITH DE-CARBONIZATION AND MODERNIZATION EFFORTS FOR FUTURE REPLACEMENT WITH ELECTRICAL EQUIPMENT. No product keyword matched | 1 | Sep 8, 2026 |
| B | Institute of Chunghwa Buddhist C NYC DOB building permits | 10 | Plumbing · FILE EXTERIOR PLUMBING WORK FOR PROPOSED SEWER DRAINAGE CONNECTION. No product keyword matched | 1 | Sep 8, 2026 |
| B | The Pierre Hotel NYC DOB building permits | 10 | Protection and Mechanical Methods · Proposed temporary installation of contractor shed/ shanty as per BC 3303.16 to be used as temporary office during construction of # M01244073-I1. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Sep 8, 2026 |
| B | THE CARLYLE NYC DOB building permits | 10 | Sprinklers · Sprinkler modifications associated with interior renovation No product keyword matched | 10 | Sep 8, 2026 |
| B | The Luxury Collection Hotel Manhatt NYC DOB building permits | 10 | Suspended Scaffold · Facade Inspection via Industrial Rope Access as shown on plans No product keyword matched | 1 | Sep 8, 2026 |
| B | LIPPMANN FAMILY NYC DOB building permits | 10 | Sprinklers · Sprinkler system filed in conjunction with the renovation of three story residential Building and change to 3 family No product keyword matched | 1 | Sep 8, 2026 |
| B | STARCOM CONSTRUCTION CO NYC DOB building permits | 10 | General Construction · Combine Room 2 and Room 3 in to 1 unit. No product keyword matched | 1 | Sep 8, 2026 |
| B | 285 LAFAYETTE CONDO NYC DOB building permits | 10 | Boiler Equipment · INSTALL REPLACEMENT GAS-FIRED BOILER/BURNER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Sep 8, 2026 |
| B | 3402 QUEENS BLVD ASSOCIATES LLC NYC DOB building permits | 10 | General Construction · ROOF REPLACEMENT AND GUTTER LEADER REPLACEMENT AT BULKHEAD ROOF ON NORTH SIDE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 8, 2026 |
| B | ASPRO PLUMBING INC NYC DOB building permits | 10 | Sprinklers · Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupanc No product keyword matched | 1 | Sep 8, 2026 |
| B | 712 southern llc NYC DOB building permits | 10 | Plumbing · INSTALLATION OF PLUMBING FIXTURES & ELECTRIC HOT WATER HEATER IN CONJUNCTION WITH GC #X01331790-I1 AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 1 | Sep 8, 2026 |
| B | MK CUSTOM BUILDERS CORP NYC DOB building permits | 10 | Construction Fence · PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE No product keyword matched | 1 | Sep 8, 2026 |
| B | PH REALTY CAPITAL LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APTS APTS 1B, 11, 24, 32, 33, 41, 55, 66, 67, AS PER PLANS FILED HEREWITH. REPAIR/REPLACEMENT OF ALL INTERIOR FINISHES. NO CHANGE TO LAYOUT. ADDING APARTMENTS 25, 27, 34, 35, 36, 37, 44, 45, 53, 57, 65. No product keyword matched | 1 | Sep 8, 2026 |
| B | PYRAMID RESTORATION NYLLC NYC DOB building permits | 10 | Structural · STRUCTURAL ANCHORAGE FOR FACADE ELEMENTS AND WEST ELEVATION STRUCTURAL REPAIRS TO BALCONY STEEL. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. NO CHANGE TOSTRUCTURAL DESIGN CRITERIA OR LOADING. No product keyword matched | 2 | Sep 8, 2026 |