Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ECHOSTAR CONSTRUCTION INC NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND INSPECTION AT 801 EAST 14 STREET, MANHATTAN, NY 10009. No product keyword matched | 1 | Sep 9, 2026 |
| B | DONE RIGHT KITCHEN EXHAUS |
| 10 |
Mechanical Systems · filing for kitchen exhaust system which include hood and exhaust fan in exiting commercial space . no change in use, egress or occupancy in this application. No product keyword matched |
| 1 |
| Sep 9, 2026 |
| B | IOLA'S LYCEUM NYC DOB building permits | 10 | Sign · NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - THE NORTHSTAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Sep 9, 2026 |
| B | DOUG'S PLUMBING & HEATING NYC DOB building permits | 10 | General Construction · Internal Rehabilitation of existing restaurant on First floor. Plumbing work as per X01392922-I1. Existing Fire suppression system modification shall to be filed with FDNY by others. No change in use, occupancy, or egress. No product keyword matched | 1 | Sep 9, 2026 |
| B | A.R.E. CONTRACTING NYC CO NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING CELLAR IN AN EXISTING SINGLE-FAMILY HOUSE. NO CHANGE TO OCCUPANCY OR EGRESS. No product keyword matched | 3 | Sep 9, 2026 |
| B | REIDBUILD CONSULTANCY LLC NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. No product keyword matched | 1 | Sep 9, 2026 |
| B | B N J CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · interior renovations on the 19h floor in unit#19 G as per plans submitted-plumbing work in conjunction under application # M01440853-S1 no change to use, egress or occupancy. No product keyword matched | 1 | Sep 9, 2026 |
| B | CRM MANAGEMENT SERVICES NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Sep 9, 2026 |
| B | KAISHENG REALTY EIGHT LLC NYC DOB building permits | 10 | Mechanical Systems · 1. PROPOSE MECHANICAL SYSTEM FOR 3-STORY MIXED-USE BUILDING. 2. INSTALLATION 4 AC AT OUTDOOR SPACE, 8 VENT IN BATHROOM, 2 EXHAUST IN KITCHEN. there are 14 in total. 3. FILE MECHANICAL WORK IN CONJUNCTION WITH JOB#Q00889276-I1 No product keyword matched | 2 | Sep 9, 2026 |
| B | LC LEMLE REAL ESTATE GROUP LLC NYC DOB building permits | 10 | Plumbing · ADDITION OF NATURAL GAS FOR EXISTING DUAL-FUEL BOILER WITH NEW GAS METER & GAS PIPING DISTRIBUTION, EXISTING #2 FUEL OIL TANK TO REMAIN. NO CHANGE IN OCCUPANCY, USE OR EGRESS OF THE SPACE. No product keyword matched | 1 | Sep 9, 2026 |
| B | NEXTGEN PHARMACEUTICALS NYC DOB building permits | 10 | Foundation · Foundation and Excavation required for the Proposed vertical and horizontal enlargement of an existing two (2) story building; converting to a three (3) story + cellar one family building No product keyword matched | 1 | Sep 9, 2026 |
| B | EMPIRE PROP PARTNERS LLC* NYC DOB building permits | 10 | Structural · PROVIDE A NEW CONVIENANCE STAIR FROM 5TH FLOOR TO PENTHOUSE LEVEL No product keyword matched | 2 | Sep 9, 2026 |
| B | CITY VIEW HOMES CORP NYC DOB building permits | 10 | General Construction · PLANS AND DOCUMENTS FILED HEREWITH FOR MINOR INTERIOR RENOVATIONS OF A 1-STORY COMMERCIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, CONSTRUCTION CLASS OR MEANS OF EGRESS. No product keyword matched | 1 | Sep 9, 2026 |
| B | ROBK & ROSA GROUP INC NYC DOB building permits | 10 | General Construction · Townhouse renovation project, per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 9, 2026 |
| B | ANNADALE ROAD DEVELOPMENT LLC NYC DOB building permits | 10 | General Construction · Construct a two-family attached residence with built-in one car garage No product keyword matched | 4 | Sep 9, 2026 |
| B | PLATINUM PLBG & HTG INC NYC DOB building permits | 10 | Plumbing · APARTMENT 10D PLUMBING RENOVATE BATHROOMS- REPLACE, RELOCATE AND NEW FIXTURES AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 9, 2026 |
| B | Veterans Road West LLC NYC DOB building permits | 10 | Plumbing · Exterior storm pipe No product keyword matched | 2 | Sep 9, 2026 |
| B | 19 Dutch NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW WATER SOURCE HEAT PUMP AIR CONDITIONING UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 9, 2026 |
| B | AG STONE NYC DOB building permits | 10 | General Construction · Installing a 6 feet wide doorway doorway in the back cellar wall with a ramp to the back yard. removal of chimney in the back wall of the house. No change in use, bulk, occupancy and egress. Filing to clear violation # 39041383K. No product keyword matched | 1 | Sep 9, 2026 |
| B | Faztec Industries Inc NYC DOB building permits | 10 | Sign · INSTALL INDIRECTLY ILLUMINATED NON-ADVERTISING SIGN ON WALL STRUCTURE FILED UNDER SEPARATE APPLICATION # S01442784. (FAZTEC INDUSTRIES) No product keyword matched | 2 | Sep 9, 2026 |
| B | LINCO USA INC NYC DOB building permits | 10 | General Construction · RENOVATION OF EXIST. RESIDENTIAL HOUSE, REPAIR/REPLACE DOOR, CELING, FLOOR, PAINTING IN THE CELLAR 1ST.FL. 2ND.FL. 3RD FL, NO CHANGE IN USE, OCCUPANCY & MEANS OF EGRESS. No product keyword matched | 2 | Sep 9, 2026 |
| B | FIRE ZONE VENTILATION & S NYC DOB building permits | 10 | Mechanical Systems · filing for installing type 1 and type 2 hood and kitchen exhaust system in commercial space No product keyword matched | 1 | Sep 9, 2026 |
| B | MARTIN PLG & HTG INC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW PLUMBING FIXTURES AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 1 | Sep 9, 2026 |
| B | COSTCO WHOLESALE #318 BROOKLYN, NY NYC DOB building permits | 10 | Plumbing · PROPOSE TO CAP & REMOVE GAS PIPING TO CHILLER AND INSTALL NEW GAS PIPING TO BOILER AS PER PLANS SUBMITTED HERWTIH. No product keyword matched | 2 | Sep 9, 2026 |
| B | WALLACK MGMT NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 9, 2026 |
| B | VMR BUILDERS CORP NYC DOB building permits | 10 | General Construction · LEGALIZATION OF THE REMOVAL OF EXISTING CONTAINERS AND STRUCTURES BUILT WITHOUT A PERMIT ON LOT TO REMEDY VIOLATIONS # 34624020Y & 34624021X. No product keyword matched | 1 | Sep 9, 2026 |
| B | ALLTECH CONSTRUCTION GROUP INC NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLD FOR INSULATING AN EXTERIOR PIPE AT REAR OF BUILDING. AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. AREA WILL BE CLOSED OFF FROM THE PUBLIC. No product keyword matched | 2 | Sep 9, 2026 |
| B | R & R HOME REPAIRS INC NYC DOB building permits | 10 | General Construction · Removal of interior non-bearing partitions, millwork, and lighting. Installation of new interior non-bearing partitions, millwork, ceilings, and lighting. No change to use, egress, or occupancy. No product keyword matched | 2 | Sep 9, 2026 |
| B | BLUE WATER BUILDERS LLC NYC DOB building permits | 10 | General Construction · FILING FOR APPROVED PLAN WITH MINOR INTERIOR RENOVATION IN COMMERCIAL SPACE @ 1ST FLOOR IN ORDER TO REMEDIATE VIOLATION #35646733H No product keyword matched | 1 | Sep 9, 2026 |
| B | NEW YORK REMODELING INC NYC DOB building permits | 10 | Mechanical Systems · Partial interior renovation of apartment unit including windows and PTAC units' replacement. No product keyword matched | 1 | Sep 9, 2026 |
| B | ACSRX Pharma, Inc. NYC DOB building permits | 10 | Plumbing · NEW PLUMBING WORK FOR PHAMACY. No product keyword matched | 1 | Sep 9, 2026 |
| B | PRO CA-SA CONTRACTOR CORP NYC DOB building permits | 10 | Plumbing · Plumbing application to remove all existing plumbing fixtures, cut and cap all existing sanitary and gas lines. Install new sanitary and gas lines as shown in proposed plumbing plans. No change in use, occupancy or egress. No product keyword matched | 2 | Sep 9, 2026 |
| B | 291 BIG STREET LLC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION & ADDITION TO EXISTING MIXED USE BUILDING. RE-FRAME EXISTING BUILDING AS NOTED ON DRAWINGS. NEW STRUCTURAL FRAMING FOR NEW HORIZONTAL AND VERTICAL BUILDING ADDITIONS. FOUND FILED SUPSEQUENT APP B00943392-S3. No product keyword matched | 4 | Sep 9, 2026 |
| B | ANBAU ENTERPRISES NYC DOB building permits | 10 | General Construction · Demolition permit for the interior of the building cellar, basement and floors 1,2,3,4. removal of all non-load-bearing partition walls, cap and remove all plumbing and gas lines, no change to use or egress No product keyword matched | 2 | Sep 9, 2026 |
| B | 295 BIG STREET LLC NYC DOB building permits | 10 | Earth Work · REMOVE EXISTING CELLAR SLAB. EXCAVATE AND CONSTRUCT NEW CELLAR SLAB ON GRADE. CONSTRUCT NEW CONCRETE CURB AT PERIMTETER OF FOUNDATION WALLS. NO UNDERPINNING REQUIRED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 9, 2026 |
| B | LXS AIR INC NYC DOB building permits | 10 | Mechanical Systems · FILING HEREWITH DRAWINGS TO INSTALL NEW EXHAUST DUCTS FOR PROPOSED GAS DRYERS. THIS APPLICATION DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 9, 2026 |
| B | Blue Fin Equities NYC DOB building permits | 10 | Mechanical Systems · Mechanical work as shown on the plans. No product keyword matched | 3 | Sep 9, 2026 |
| B | PETERBURGH ESTATES LLC NYC DOB building permits | 10 | Structural · TWO FAMILY RESIDENCE WITH ACCESSORY OFF STREET PARKING FOR TWO CARS. No product keyword matched | 2 | Sep 9, 2026 |
| B | PARADISE CONSTRUCTION NYC NYC DOB building permits | 10 | General Construction · HEREWITH FILING INTERIOR RENOVATIONS IN APT 2D PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 9, 2026 |
| B | Shore Parkway Owner LLC NYC DOB building permits | 10 | Sign · INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (REGAL) No product keyword matched | 1 | Sep 9, 2026 |
| B | METROPOLITAN ELECTRIC OF NEW YORK I NYC DOB building permits | 10 | General Construction · PROPOSED ONE STORY NEW BUILDING GARAGE. No product keyword matched | 2 | Sep 9, 2026 |
| B | PRINCIPAL BUILDERS SOLUTI NYC DOB building permits | 10 | Mechanical Systems · Kurt Geiger-- Existing mechanical system to remain. Minor modification to existing ductwork are proposed, including removal and addition/relocation of linear supply diffusers. No new HVAC equipment is proposed. No product keyword matched | 2 | Sep 9, 2026 |
| B | BLUESHORE ENGINEERING LLC NYC DOB building permits | 10 | Structural · Proposed vertical and horizontal enlargement for existing one family house. Get new certificate of occupancy. No product keyword matched | 4 | Sep 9, 2026 |
| B | 212 BUILDERS INC NYC DOB building permits | 10 | Mechanical Systems · INTERIOR RENOVATION OF EXISTING ONE FAMILY DWELLING WITH INSTALLTION OF MECHANICAL SYSTEM AS PER DRAWINGS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 9, 2026 |
| B | PAIK CONSTRUCTION INC NYC DOB building permits | 10 | Solar · Installation of solar electric generation system for utility interconnection. No changes being made to use, occupancy, egress, or anything not marked on the planset and supporting documents No product keyword matched | 1 | Sep 9, 2026 |
| B | Wild Real Property LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF 8' HIGH WOOD CONSTRUCTION FENCE No product keyword matched | 1 | Sep 9, 2026 |
| B | NB CONTRACTING INC NYC DOB building permits | 10 | General Construction · Interior renovation of an existing condo unit. Construct new GWB soffit. No change to use, occupancy, or egress. No product keyword matched | 1 | Sep 9, 2026 |
| B | Sitex Group NYC DOB building permits | 10 | General Construction · CONSTRUCTION OF PAVED LOT FOR OUTDOOR STORAGE OF VEHICLES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 9, 2026 |
| B | Healthcare Realty NYC DOB building permits | 10 | Sign · ERECT ACCESSORY BUSINESS WALL SIGN FOR ADVANTAGE CARE PHYSICIANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 9, 2026 |
| B | BCM NOSTRAND AVE LLC NYC DOB building permits | 10 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 9, 2026 |