Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | PLANET - GREEN BUILDING SERVICES NYC DOB building permits | 10 | General Construction · DIRECT REPLACEMENT OF EXISTING STOREFRONT WITH NEW IN THE SAME LOCATION. NO CHANGE TO USE,OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 10, 2026 |
| B | ETNOP CONTRACTING LLC |
| 10 |
General Construction · CONSTRUCT A NEW BOILER ROOM ENCLOSURE IN CELLAR. No product keyword matched |
| 2 |
| Sep 10, 2026 |
| B | RUSK RENOVATIONS, INC NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 5 | Sep 10, 2026 |
| B | THE COOPER UNION FOR THE ADVANCEMEN NYC DOB building permits | 10 | Mechanical Systems · Mechanical work in conjunction with (-I1 ) application for renovation of existing school at the 2nd fl, MS Equipment, related duct and piping work as shown on plan set filed herewith. No change in use, egress, or occupancy under this application. No product keyword matched | 1 | Sep 10, 2026 |
| B | D&A HOME IMPROVEMENT NYC NYC DOB building permits | 10 | General Construction · IN UNITS 4A AND 4B ON FLOOR 4, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AND COMBINE UNITS PER TPPN 3/1997, AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | SAG 233 LLC. NYC DOB building permits | 10 | General Construction · FACADE REPAIRS AT EXPOSURE 2 (WEST ELEVATION). REPAIR DETERIORATED STUCCO, MASONRY AT EXISTING CHIMNEY, PARAPET/ROOF-EDGE AND WATERPROOFING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 10, 2026 |
| B | 337 MANAGMENT, LLC. NYC DOB building permits | 10 | Structural · Temporary shoring and miscellaneous garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Sep 10, 2026 |
| B | UNIVERSAL CONTRACTING NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | MOSES WEISBERG NYC DOB building permits | 10 | Structural · Structural framing and work as per plans filed No product keyword matched | 3 | Sep 10, 2026 |
| B | GRECO INDUSTRIES LLC NYC DOB building permits | 10 | Plumbing · Exterior storm pipe No product keyword matched | 1 | Sep 10, 2026 |
| B | FUNG TAI CONSTRUCTION INC NYC DOB building permits | 10 | Mechanical Systems · SUBSEQUENT FILING OF MECHANICAL WORK FROM GROUND FLOOR TO ROOF AS PER PLANS IN CONJUNCTION WITH NB JOB #B01012866. No product keyword matched | 3 | Sep 10, 2026 |
| B | SKYLINE BUILDERS GROUP LL NYC DOB building permits | 10 | Structural · Garage Restoration as per plans. No product keyword matched | 3 | Sep 10, 2026 |
| B | FULTON PLBG & HTG CORP NYC DOB building permits | 10 | Sprinklers · APPLICATION FILED FOR THE INSTALLATION OF A NEW SPRINKLER SYSTEM TO AN EXISTING (3) FAMILY BUILDING IN CONJUNCTION WITH HORIZONTAL ENLARGEMENT & GUT/REHAB FILED UNDER ALT-1 JOB# B00930112-I1. No product keyword matched | 1 | Sep 10, 2026 |
| B | SHERMAN REAL ESTATE INVESTMENTS NYC DOB building permits | 10 | Mechanical Systems · REPLACE (2) HVAC ROOFTOP CONDENSERS AND (2) AIR HANDLER UNITS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 10, 2026 |
| B | J PRO INTERIORS CORP NYC DOB building permits | 10 | General Construction · PERFORM MINOR INTERIOR PARTITION DEMO AND CONSTRUCTION TO COMBINE APARTMENT 3E AND 3CD AS PER TPPN#3/97 NO CHANGE IN USE, EGRESS OR OCCUPANCY......FILING PAA TO ELIMINATE REDUNDANT APARTMENT ENTRY DOOR No product keyword matched | 6 | Sep 10, 2026 |
| B | DORIA, INC NYC DOB building permits | 10 | Protection and Mechanical Methods · Application of the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy. No product keyword matched | 2 | Sep 10, 2026 |
| B | STEINBERG& POKOIK MANAGEMENT CORP NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION. No product keyword matched | 1 | Sep 10, 2026 |
| B | RIGGING CONSULTANTS INC NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans No product keyword matched | 1 | Sep 10, 2026 |
| B | RUSH MANAGEMENT CO NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Sep 10, 2026 |
| B | EJP CONTRACTING CORP NYC DOB building permits | 10 | General Construction · PROPOSED REPLACEMENT OF STAIR AND REINSTALLATION OF CORRIDOR WALLS WITHIN EXISTING BUILDING FROM 2ND FLOOR TO 5TH FLOOR. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY. No product keyword matched | 2 | Sep 10, 2026 |
| B | BL BUILDEX LLC NYC DOB building permits | 10 | General Construction · Interior General Construction work at Basement level; kitchen and bath remodel, relocation of non-load bearing partitions. No product keyword matched | 1 | Sep 10, 2026 |
| B | PILHOF REALTY ASSOCIATES, LP NYC DOB building permits | 10 | Sign · NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - GREEN ROOM CANNABIS DISPENSARY. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 10, 2026 |
| B | ARC HI TECT ASSOCIATE INC NYC DOB building permits | 10 | General Construction · REPLACE FRONT-FACED BRICK MATCHING WITH EXISTING ONE; ALSO REPAIR COPPING STONE AS NECESSARY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | FABCO SHOES NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - MODERNMD. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 10, 2026 |
| B | LEGUME CG LLC NYC DOB building permits | 10 | General Construction · Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition. No product keyword matched | 1 | Sep 10, 2026 |
| B | SCS UNION REALTY CO LLC NYC DOB building permits | 10 | Structural · INTERIOR RENOVATION OF APARTMENT 7. PARTITION CHANGES AS PER PLANS. NEW ENLARGED WINDOW AND LINTEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 10, 2026 |
| B | ADIL CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR A RENOVATION OFTHE FRONT FACADE BY ADDING A PATIODOOR. NO CHANGE IN USE, OCCUPANCYOR EGRESS. No product keyword matched | 2 | Sep 10, 2026 |
| B | 73-15 190 ST LLC NYC DOB building permits | 10 | Foundation · FOUNDATION DESIGN ON ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING No product keyword matched | 1 | Sep 10, 2026 |
| B | OAKWOOD CENTER LLC NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - SHASHLIK HOUSE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | CONEY ISLAND USA NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 10, 2026 |
| B | SATGUR CONSTRUCTION INC. NYC DOB building permits | 10 | Earth Work · NEW TWO STORY AND CELLAR, TWO FAMILY BUILDING. No product keyword matched | 2 | Sep 10, 2026 |
| B | PARK TERRACE GARDENS INC. NYC DOB building permits | 10 | General Construction · Facade Repair Project as per plans. No change to use, egress, or occupancy. No product keyword matched | 1 | Sep 10, 2026 |
| B | JBMA NYC DOB building permits | 10 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 10, 2026 |
| B | 130 William Street Associates LLC NYC DOB building permits | 10 | General Construction · FIT-OUT TO EXISTING SHELL SPACE FOR A NEW IMAGING CENTER. No product keyword matched | 3 | Sep 10, 2026 |
| B | J&P METRO DEV GROUP INC NYC DOB building permits | 10 | General Construction · UNDERPINNING OF THE REAR WALL AND FOUNDATION WORK FOR COLUMNS IN THE CELLAR. No product keyword matched | 1 | Sep 10, 2026 |
| B | PRIMAVERA PIZZERIA NYC DOB building permits | 10 | General Construction · REMOVAL OF PARTITIONS TO PROVIDE MORE SPACE AT EXISTING PIZZERIA. NO OTHER WORK PROPOSED. NO CHANGE IN JSE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | ENVIRONMENTAL PRO MECH NYC DOB building permits | 10 | Boiler Equipment · INSTALLATION OF BOILER , OIL BURNER AND OIL TANK ON MOBILE TRAILER # 20 . No product keyword matched | 1 | Sep 10, 2026 |
| B | DRILL CONSTRUCTION CO INC NYC DOB building permits | 10 | Mechanical Systems · FILING MECHANICAL MODIFICATIONS FOR BREAD AHEAD RESTAURANT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 10, 2026 |
| B | Arismy LLC NYC DOB building permits | 10 | Full Demolition · PROPOSED NON-MECHANICAL FULL DEMOLITION OF EXISTING GARAGE. No product keyword matched | 2 | Sep 10, 2026 |
| B | AC UNIVERSAL SUPPLY INC NYC DOB building permits | 10 | Mechanical Systems · 1)INSTALLATION OF SPLIT-SYSTEM HEAT PUMPS FOR HEATING AND COOLING.2)INSTALLATION OF BOILER FOR RADIANT FLOOR HEATING.INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION. No product keyword matched | 1 | Sep 10, 2026 |
| B | 9 WEST 20TH CONDOMINIUM NYC DOB building permits | 10 | General Construction · Limited exterior Repairs, north, south, east and west facades No product keyword matched | 1 | Sep 10, 2026 |
| B | UNDER PRESSURE COFFEE NYC DOB building permits | 10 | General Construction · INSTALL A NEW HANDICAP BATHROOM & EXTEND CAFE SEATING INTO THE MARKET AREA . TO INCLUDE REMOVAL OF MARKET DISPLAYS, SHELVING AND EQUIPMENT, & INSTALL MINOR INTERIOR PARTITIONS. MINOR PL WORK FILED SUBSEQUENTLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 10, 2026 |
| B | Morton Square NYC DOB building permits | 10 | Plumbing · Modification to existing powder room, bathroom and laundry room. No change to use , egress or occupancy. No product keyword matched | 2 | Sep 10, 2026 |
| B | WNW & SONS PLUMBING & HTG NYC DOB building permits | 10 | Sprinklers · Sprinkler work file in conjunction with apartment combination and renovation . No product keyword matched | 2 | Sep 10, 2026 |
| B | GMC PROPERTY MANAGEMENT NYC DOB building permits | 10 | Boiler Equipment · HEREWITH FILING TO REPLACE EXISTING GAS BOILER AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 10, 2026 |
| B | HENGXING LLC NYC DOB building permits | 10 | Construction Fence · CONSTRUCTION FENCE IN CONJUNCTION WITH NB APPLICATION # Q00683000-I1 No product keyword matched | 2 | Sep 10, 2026 |
| B | BS New York Properties LLC NYC DOB building permits | 10 | Full Demolition · Full demolition to a three story house No product keyword matched | 4 | Sep 10, 2026 |
| B | NAVAC BUILDERS INC NYC DOB building permits | 10 | Support of Excavation · PROPOSED SUPPORT OF EXCVATION PLANS FILED HEREWITH. No product keyword matched | 6 | Sep 10, 2026 |
| B | STACEY MANAGEMENT NYC DOB building permits | 10 | General Construction · Non-structural replacement of existing canopy fascia. No change in use, egress or occupancy. No product keyword matched | 4 | Sep 10, 2026 |
| B | Chromatic NYC DOB building permits | 10 | Plumbing · Plumbing work for commercial space. No change of use, egress or occupancy. No product keyword matched | 3 | Sep 10, 2026 |