Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ODYSSIA GLOBAL COMM. CORP NYC DOB building permits | 11 | Antenna · Installation of new VERIZON site on the roof. Install 4 sectors (12 antennas) with associated parts, 4 RRH units, 3 GPS antennas and 1 equipment platform with cabinets. Related conduits on the exterior. No product keyword matched | 4 | Nov 9, 2026 |
| B |
| 11 |
Foundation · This application is filed for the Foundation work associated with the townhouse enlargement. No product keyword matched |
| 7 |
| Nov 9, 2026 |
| B | THE SALVATION ARMY NYC DOB building permits | 11 | Plumbing · ALTERATION TYPE (PL) APPLICATION EXISTING TWO (2) HVAC UNITS TO BE REPLACEDWITH NEW ON EXISTING GAS ROUGHING.TO ADDRESS FDNY SUMMONS #014242875KNO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 9, 2026 |
| B | MICHAEL YOUNG REALTY INC NYC DOB building permits | 11 | Plumbing · GAS CONNECTION TO REPLACEMENT GAS/OIL BURNER FROM EXISTING VALVE. EXTEND GAS PIPING TO NEW GAS WATER HEATER. No product keyword matched | 1 | Nov 9, 2026 |
| B | CCM CONSULTANTS INC NYC DOB building permits | 11 | General Construction · Filing Alteration -CO application for the moderate renovation and modification of existing 2-family residence and to obtain an New Certificate of Occupancy. No product keyword matched | 3 | Nov 9, 2026 |
| B | ORBIT SPRINKLER CORP NYC DOB building permits | 11 | Sprinklers · INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON THE 4TH FLOOR. MODIFICATION OF EXISTING SPRINKLER SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 9 | Nov 9, 2026 |
| B | COBALT MECHANICAL INC NYC DOB building permits | 11 | Plumbing · Installation of New Plumbing fixtures in existing roughing, as per plans submitted herewith. No change in use, egress, or occupancy is involved. No product keyword matched | 4 | Nov 9, 2026 |
| B | GREYSTAR NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Nov 9, 2026 |
| B | MEA CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · RENOVATION OF 9E FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Nov 9, 2026 |
| B | CHAIT BUILDERS INC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 4 | Nov 9, 2026 |
| B | GROVE FLATS LLC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | RIGO MANAGEMENT USA INC NYC DOB building permits | 11 | General Construction · General construction work to install two wind screens on the short sides of the existing pergola on the PH9A terrace. No change in use, egress, or occupancy. No product keyword matched | 1 | Nov 9, 2026 |
| B | WDCO NYC MARTINIQUE HOTEL LLC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 9 | Nov 9, 2026 |
| B | STACK CONSTRUCTION NYC DOB building permits | 11 | Curb Cut · FILING FOR NEW CURB CUT, NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | GARAGE MANAGEMENT COMPANY NYC DOB building permits | 11 | General Construction · GARAGE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 2 | Nov 9, 2026 |
| B | Chelsea Hotel Owners LLC NYC DOB building permits | 11 | Plumbing · Plumbing work associated with installation of gas dryers in cellar as per plans. No change in use, egress or occupancy. No product keyword matched | 1 | Nov 9, 2026 |
| B | BELLA HAIR NEW YORK INC NYC DOB building permits | 11 | Plumbing · partial plumbing work, new building sewer as per DEP approved site connection. DOB inspection sewer steel sleeve through foundation wall. No product keyword matched | 2 | Nov 9, 2026 |
| B | HIGH LINE CONSTRUCTION GROUP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF THE SIDEWALK SHED FRONT OF THE BUILDING AT 17 EAST 77TH STREET No product keyword matched | 3 | Nov 9, 2026 |
| B | Touro University NYC DOB building permits | 11 | Plumbing · INSTALLATION OF NEW GAS PIPING FOR NEW DEDICATED OUTDOOR AIR UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | BROOKLYN HOME MANAGEMENT NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Nov 9, 2026 |
| B | LMC NYC DOB building permits | 11 | Plumbing · GAS CONNECTION TO GAS/OIL BURNER BEING REINSTALLED ON REPLACEMENT BOILER No product keyword matched | 6 | Nov 9, 2026 |
| B | C&W NYC DOB building permits | 11 | Mechanical Systems · NYU LANGONE - 981 8TH AVENUE OFFICE FIT-OUTS - EARLY INTERIOR DEMO FOR MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Nov 9, 2026 |
| B | EVEREST SCAFFOLDING INC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF No product keyword matched | 8 | Nov 9, 2026 |
| B | COMMERCIAL CONTRACTORS CO NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION OF THIRD FLOOR APARTMENT. NO CHANGE TO BULK OR USE. No product keyword matched | 1 | Nov 9, 2026 |
| B | FINALY GENL CONTR CORP NYC DOB building permits | 11 | General Construction · GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Nov 9, 2026 |
| B | GJUSHI CONSTR CO NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AND ENGINEER ENCLOSURE SYSTEM No product keyword matched | 13 | Nov 9, 2026 |
| B | PASHA USA CONSTRUCTION IN NYC DOB building permits | 11 | Construction Fence · NEW 8'-0 TEMPORARY CONSTRUCTION PLYWOOD FENCE No product keyword matched | 2 | Nov 9, 2026 |
| B | LTCI LTD NYC DOB building permits | 11 | General Construction · General construction modifications as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 1 | Nov 9, 2026 |
| B | A.N.C. CONTRACTING CO.,IN NYC DOB building permits | 11 | Mechanical Systems · APPLICATION IS FILED FOR DIRECT REPLACEMENT OF EXISTING SPLIT SYSTEM HVAC UNITS, WITH NEW UNITS AT SAME LOCATION, AS PER PLANS SUBMITED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY OF BUILDING DUE TO PROPOSED WORK. No product keyword matched | 5 | Nov 9, 2026 |
| B | 1390 Clove Properties Inc. NYC DOB building permits | 11 | Curb Cut · PROPOSED 10' CURB CUT FOR NEW DETACHED TWO FAMILY RESIDENCE No product keyword matched | 1 | Nov 9, 2026 |
| B | CARLITOS CONTRACTING CORP NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation of temporary site specific engineered enclosure system per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 5 | Nov 9, 2026 |
| B | 1Q BUILDERS INC NYC DOB building permits | 11 | General Construction · PROPOSED OF BRICK REPLACEMENT AND WINDOW LINTELS TO BE DONE AS NEEDED AS PER PLANS.NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Nov 9, 2026 |
| B | ROYAL HVAC SYSTEMS INC NYC DOB building permits | 11 | Mechanical Systems · PERFORM MECHANICAL WORK IN CONJUNCTION WITH APT #8A RENOVATION. INSTALL THRU-WALL HVAC UNITS AND REPLACE RADIATORS. MODIFIED/NEW EXTERIOR MASONRY OPENINGS FILED UNDER INITIAL APPLICATION. NO CHANGE TO USE, EGRESS, OCCUPANCY OR FIRE PROTECTION. No product keyword matched | 1 | Nov 9, 2026 |
| B | QUEENS DEVELOPMENT GROUP, LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 7 | Nov 9, 2026 |
| B | Citi NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF 3 TON ROOFTOP CONDENSING UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 11 | Nov 9, 2026 |
| B | CITY STONE WORLD INC NYC DOB building permits | 11 | General Construction · Proposed a temporary freestanding shed in the rear yard to address the HRP request for corrective action associated with complain #4A46853. No change to the use, egress or occupancy. No product keyword matched | 1 | Nov 9, 2026 |
| B | TAINO TOWERS NYC DOB building permits | 11 | Suspended Scaffold · TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Edip Ramadani No product keyword matched | 4 | Nov 9, 2026 |
| B | AR PROPERTIES GROUP LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF NEW PLUMBING FIIXTURES FOR PROPOSED NEW TOILET AND NON-RESIDENTIAL SINKS IN CONJUNCTIAN WITH INITAL ARCHITECTURAL APPLICATION. No product keyword matched | 8 | Nov 9, 2026 |
| B | RICHMOND PLBG & HEATING NYC DOB building permits | 11 | Plumbing · APPLICATION FILED FOR PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE, AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 9, 2026 |
| B | VBGO PENN PLAZA LLC NYC DOB building permits | 11 | General Construction · Minor demolition, installation of partitions, doors & ceilings on the 4th floor (TPG Office Reconfiguration) as per plans. No change to use, egress or occupancy. No product keyword matched | 3 | Nov 9, 2026 |
| B | Hudson View Gardens NYC DOB building permits | 11 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 7 | Nov 9, 2026 |
| B | MAXWELLKATES NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 6 | Nov 9, 2026 |
| B | AMERICAN STANDARD PLUMBING NYC DOB building permits | 11 | Sprinklers · Application is filed for PL/SP work at the subject premises. In conjunction with application #B01347385-I1 No product keyword matched | 12 | Nov 9, 2026 |
| B | LOEWS REGENCY HOTEL NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Nov 9, 2026 |
| B | Parentschoice Daycare LLC 2 NYC DOB building permits | 11 | Plumbing · PLUMBING WORK ON CELLAR & 1ST FLOOR, IN CONJUNCTION WITH ALT-1Q01168072-I1. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | 345 PAS HOLDING, LLC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR MINOR INTERIOR GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 9, 2026 |
| B | 4511 193 ST LLC NYC DOB building permits | 11 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 14 | Nov 9, 2026 |
| B | CITY FRAMERS INC NYC DOB building permits | 11 | Plumbing · Plumbing worktype hereby filed subsequent to the Alt-CO application: X01397534-I1. No product keyword matched | 5 | Nov 9, 2026 |
| B | TOWER 53 CONDO NYC DOB building permits | 11 | Structural · GARAGE REPAIRS AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | CASINO DEVELOPMENT GROUP NYC DOB building permits | 11 | General Construction · THIS IS A INTERIOR DEMOLITION OF MEZZANINE ON 1 STORY C.M.U. & STEEL WITH CONCRETE BUILDING LOCATED AT 55-06 43rd STREET IN QUEENS N.Y.2. INTERIOR DEMOLITION OF PORTION OF THE MEZZANINE WILL BE PERFORMED USING HAND TOOLS ONLY. No product keyword matched | 1 | Nov 9, 2026 |