Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SSY Tea LLC NYC DOB building permits | 10 | General Construction · AT 1ST FLOOR -INTERIOR RENOVATION, REMOVAL OF NON-BEARING PARTITIONS &RELATED ELECTRICAL WORK. No Change in use, egress or occupancy No product keyword matched | 1 | Sep 15, 2026 |
| B | RARE BREED RESTORATION IN |
| 10 |
General Construction · APPLICATION IS FILED FOR INTERIOR RENOVATION CAP/REMOVE PLUMBING FIXTURES &INSTALL PARTITIONS AND NEW PLUMBING AS PER PLANS. NO CHANGE IN USE, EGRESS OROCCUPANCY No product keyword matched |
| 1 |
| Sep 15, 2026 |
| B | Sunrun NYC DOB building permits | 10 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | CASUR MANAGEMENT AND MAINTENCE INC NYC DOB building permits | 10 | Structural · RENOVATE EXISTING PUBLIC HALL . NO CHANGE TO USE OR BULK. No product keyword matched | 6 | Sep 15, 2026 |
| B | Canvas NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW SPLIT HVAC SYSTEM ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 2 | Sep 15, 2026 |
| B | HARTMANN DOHERTY NYC DOB building permits | 10 | Plumbing · Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | People's Forum, Inc. NYC DOB building permits | 10 | Foundation · Herewith filing for underpinning work in conjunction with Alteration CO # M01217953-I1 No product keyword matched | 5 | Sep 15, 2026 |
| B | TZ LASH & NAILS NYC DOB building permits | 10 | Sign · INSTALLATION OF A NON-ILLUMINATED SIGN FACING FOR THE 1ST FLOOR COMMERCIAL SPACE OF A MIXED BUILDING AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | TUSCANA RENOVATION LLC NYC DOB building permits | 10 | General Construction · REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. REFURBISH APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | BATON PRIVATE LLC NYC DOB building permits | 10 | Plumbing · Replacement of a roof drain at the second floor terrace. No product keyword matched | 1 | Sep 15, 2026 |
| B | YCK DEVELOPERS LLC NYC DOB building permits | 10 | Earth Work · FOUNDATION AND EARTHWORK SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION #B01099717-I1. No product keyword matched | 5 | Sep 15, 2026 |
| B | OUT OF SQUARE DESIGNS LLC NYC DOB building permits | 10 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK FOR THE LOWER DUPLEX AT THE ADDRESS NOTED. INCLUDES NEW SPLIT SYSTEM A/C. No product keyword matched | 7 | Sep 15, 2026 |
| B | Nico Management Solution NYC DOB building permits | 10 | General Construction · Proposed installation of partition walls as per plans, no change in use, egress or occupancy No product keyword matched | 2 | Sep 15, 2026 |
| B | Deegan Management NYC DOB building permits | 10 | Sign · ERECT HALO LIT ILLUMINATED ACCESSORY BUSINESS WALL SIGN READING KIEHL'S No product keyword matched | 2 | Sep 15, 2026 |
| B | MARPOL CONST CORP NYC DOB building permits | 10 | General Construction · Main Roof & Bulkhead roofs replacement. No change in occupancy, use or egress. No product keyword matched | 2 | Sep 15, 2026 |
| B | RAGHUBAR CONSTRUCTION INC NYC DOB building permits | 10 | Construction Fence · SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #:S01258917-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 15, 2026 |
| B | ROSE CONTRACTOR NY, INC NYC DOB building permits | 10 | Supported Scaffold · SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 15, 2026 |
| B | GWB 179 REALTY LLC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Sep 15, 2026 |
| B | INTOWN CONSULTANTS INC NYC DOB building permits | 10 | General Construction · Interior renovation of a 2-story building. No product keyword matched | 2 | Sep 15, 2026 |
| B | WHARTON SMITH CONST NY * NYC DOB building permits | 10 | Mechanical Systems · SUBSEQUENT FILING FOR MECHANICAL WORK FOR INTERIOR FIT OUT OF EXISTING OFFICE SPACE ON 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY No product keyword matched | 2 | Sep 15, 2026 |
| B | nomis contracting corp NYC DOB building permits | 10 | Construction Fence · Temporary Construction Fence to secure property (272.00lf). Construction Fence filed in conjunction with GC #X08029467 & FD #X01341891. No product keyword matched | 2 | Sep 15, 2026 |
| B | KD ONE CONSTRUCTION INC NYC DOB building permits | 10 | Mechanical Systems · PROPOSED MECHANICAL (HVAC, BATHROOM AND KITCHEN EXHAUST AND FAI) No product keyword matched | 2 | Sep 15, 2026 |
| B | ARTISTIC LICENSE INC NYC DOB building permits | 10 | General Construction · DOB ALT-2 INTERIOR RENOVATION WITH SELECTIVE NON-STRUCTURAL DEMOLITION; NEW KITCHEN, BATHS, CLOSETS, LAUNDRY; NEW MILLWORK, FINISHES, LIGHTING, MEP UPGRADES; MINOR STAIR/GUARDRAIL CHANGES; SPRINKLER REMAINS; NO CHANGE IN OCCUPANCY, EGRESS, OR STRUCTURE. No product keyword matched | 1 | Sep 15, 2026 |
| B | JACOB NYC DOB building permits | 10 | Boiler Equipment · REPLACE 3 REG. BOILERS INSTALLED PER 321024681 BUT NOT INSPECTED WITH NONJURISDICTIONAL BOILERS FOR APARTMENTS 2L,3L & 4L THE REMAINING 5 APARTMENTS TO BE HEATED ELECTRICALLY. THIS APPL. IS TO CORRECT 7 CONSECUTIVE OATH VIO # 32055458Z THRU 32055464P No product keyword matched | 2 | Sep 15, 2026 |
| B | HARRIS WTR MAIN & SWR CON NYC DOB building permits | 10 | Plumbing · MODIFICATION FOR STORM WATER PIPING RUNNING THRU PARKING LOT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 15, 2026 |
| B | 71 CLINTON ST LLC NYC DOB building permits | 10 | Plumbing · Installation of new plumbing fixtures in existing restaurant space. No product keyword matched | 1 | Sep 15, 2026 |
| B | UP RITE CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · Demolition and installation of interior partitions, patch and repair walls as required. No product keyword matched | 1 | Sep 15, 2026 |
| B | PHOENIKX NY INC NYC DOB building permits | 10 | General Construction · Interior single-family renovation as per plans filed herewith. No change to use, egress, or occupancy under this application. No product keyword matched | 1 | Sep 15, 2026 |
| B | RK NYC REMODELING INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 15, 2026 |
| B | ZIL LLC NYC DOB building permits | 10 | Plumbing · APPLICATION FILED FOR PLUMBING WORK IN CONJUNCTION WITH DOB#210179563 No product keyword matched | 1 | Sep 15, 2026 |
| B | THE 38-40 LLC NYC DOB building permits | 10 | General Construction · FILED HEREWITH TO REPAIR/REPLACE PARTIAL ROOF OF EXISTING WAREHOUSE AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 15, 2026 |
| B | Lam Generation NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION No product keyword matched | 1 | Sep 15, 2026 |
| B | 63RD STREET BLDG. LLC (CONGREGATION NYC DOB building permits | 10 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION # 140984317 No product keyword matched | 1 | Sep 15, 2026 |
| B | MOLINELLI ARCHITECTS NYC DOB building permits | 10 | Mechanical Systems · Mechanical Work associated with conversion of an existing two (2) family house to a one (1) family as shown in plans. No product keyword matched | 1 | Sep 15, 2026 |
| B | Carne Services Inc NYC DOB building permits | 10 | General Construction · Repair existing steel deck at the rear yard connecting between the house and garage. No product keyword matched | 1 | Sep 15, 2026 |
| B | CITY DIMENSIONS CONSTRUCT NYC DOB building permits | 10 | General Construction · PROPOSE TO ESTABLISH A FOOD & SANDWICH SHOP DELI ESTABLISHMENT ON AN EXISTING EMPTY COMMERCIAL SPACE, PREVIOUSLY OCCUPIED AS A DELI, AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS. No product keyword matched | 1 | Sep 15, 2026 |
| B | HAMPTON INN GRAND CENTRAL NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Sep 15, 2026 |
| B | CPS CONTRACTING CO. INC. NYC DOB building permits | 10 | Construction Fence · Installation of temporary 8 ft construction fence in conjunction with Alt-CO S01440787-I1. No product keyword matched | 1 | Sep 15, 2026 |
| B | NAMRON, INC NYC DOB building permits | 10 | Mechanical Systems · Installation of air conditioning system at ground floor apartment B. There is no change in use, egress or occupancy under this application No product keyword matched | 1 | Sep 15, 2026 |
| B | MALIBU REAL ESTATE HOLDING NYC DOB building permits | 10 | Mechanical Systems · REPLACE EXISTING ROOFTOP HVAC UNIT IN-KIND ON EXISTING DUNNAGE AT ORIGINAL LOCATION AS PER PLANS. NO CHANGE IN EGRESS, BULK, USE OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 1 | Sep 15, 2026 |
| B | 175 EEG LLC NYC DOB building permits | 10 | Mechanical Systems · FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | PG PROPERTIES OF QUEENS LLC NYC DOB building permits | 10 | Sign · Erect illuminated non advertising sign on wall. Dunkin'- No change of use egress or occupancy No product keyword matched | 1 | Sep 15, 2026 |
| B | GENERAL PROPERTY MANAGEMENT ASSOCIA NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS . SIDEWALK SHED FILED UNDER APPLICATION . No product keyword matched | 1 | Sep 15, 2026 |
| B | TFP1, INC. NYC DOB building permits | 10 | Plumbing · INSTALL 4 HVAC ON EXISTING 1ST FLOOR ROOF. PLUMBING WORK AS PERPLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | THE LEOPOLD GROUP NYC DOB building permits | 10 | General Construction · THIS APPLICATION IS BEING FILED FOR GENERAL CONSTRUCTION WORK ONLY FOR INTERIOR DEMOLITION OF ALLNON LOAD BEARING PARTITIONS AT FIRST FLOOR ONLY No product keyword matched | 1 | Sep 15, 2026 |
| B | 322 MIDWOOD NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF CELLAR TO USE AS ACCESSORY No product keyword matched | 1 | Sep 15, 2026 |
| B | GEFIN REAL ESTATE USA, INC. C/O FUN NYC DOB building permits | 10 | Plumbing · To legalize gas riser from Cellar to Roof. No product keyword matched | 1 | Sep 15, 2026 |
| B | Millies of Staten Island NYC DOB building permits | 10 | Mechanical Systems · installation of split system heat pump for new dining area per I1 application No product keyword matched | 2 | Sep 15, 2026 |
| B | SPIVAK ARCHITECTS P.C. NYC DOB building permits | 10 | General Construction · REMOVE ALL LOOSE BROWNSTONE AND CEMENT PATCHES. PATCH ALL BROWNSTONE WITH JAHN CUSTOM COLOR M70 AS PER MANUFACTURERS SPECIFICATION. No product keyword matched | 1 | Sep 15, 2026 |
| B | ROBIN SYSTEM INC NYC DOB building permits | 10 | General Construction · To reconfigure existing greenhouse at the roof area, To relocate existing roof deck. All work as per plans No product keyword matched | 1 | Sep 15, 2026 |