Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Mythily NYC LLC NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF PLUMBING FIXTURES, GAS COOKING EQUIPMENT AND MODIFICATION TO EXISTING SPRINKLER SYSTEM No product keyword matched | 1 | Sep 17, 2026 |
| B | APPROVED PLUMBING AND FIR NYC DOB building permits |
| 10 |
Plumbing · Plumbing work filed in conjunction with interior reonovtion with cel, bas, 001,002 and 003 floor as per plans filed. No change in use, egress or occupancy. No product keyword matched |
| 1 |
| Sep 17, 2026 |
| B | BOUSKILA FAMILY TRUST LLC NYC DOB building permits | 10 | Foundation · FOUNDATION FOR DESIGN 2 1/2 STORY HORIZONTAL EXTENSION WOOD FRAMING BUILDING. FOUNDATION WORK IN CONJUNCTION WITH GV B00776663-I1. No product keyword matched | 1 | Sep 17, 2026 |
| B | MANHATTAN CONTRACTING COR NYC DOB building permits | 10 | General Construction · FACADE REPAIRS NO CHANGE IN USE EGREES OR OCCUPANCY No product keyword matched | 1 | Sep 17, 2026 |
| B | WILLIAM STANISLAWCZYK NYC DOB building permits | 10 | Mechanical Systems · This Alteration application is being filed for the mechanical work at the subject premises as per plans submitted herewith. There are no change in use, egress or occupancy under this application. No product keyword matched | 1 | Sep 17, 2026 |
| B | 245 EAST 80TH ST, LLC NYC DOB building permits | 10 | Plumbing · PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING STORE RENOVATION. No product keyword matched | 2 | Sep 17, 2026 |
| B | THE TOWER NYC DOB building permits | 10 | General Construction · Proposed fifteen (15) story + cellar commercial building. No product keyword matched | 4 | Sep 17, 2026 |
| B | DIB MANAGEMENT CO, INC NYC DOB building permits | 10 | General Construction · INTERIOR NON-BEARING WALLS AND FLOOR FINISHES No product keyword matched | 1 | Sep 17, 2026 |
| B | 120 KING LLC NYC DOB building permits | 10 | General Construction · INSTALL STOREFRONT AWNING WITH MAX. 12 HEIGHT & MAX. 12 SQ.FT. OF LETTERING 122-02 ON 1ST FLOOR EXTERIOR WALL. NO CHANGES IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 17, 2026 |
| B | 113 SOUTH OXFORD ST LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH APARTMENT RENOVATION. INSTALL KITCHEN PLUMBING FIXTURES AND ASSOCIATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 17, 2026 |
| B | SUPREME RENOVATION A2Z IN NYC DOB building permits | 10 | Mechanical Systems · WORK TO EXISTING 1-FAMILY 2 STORY BUILDING PLUS BASEMENT. INTERIOR WORK TO ADD NEW TOILET ROOM TO 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 17, 2026 |
| B | MJDAQUIAL CONSTR CORP NYC DOB building permits | 10 | Construction Fence · FILING FOR CONSTRUCTION FENCE No product keyword matched | 1 | Sep 17, 2026 |
| B | Greater Ridgewood Historical Societ NYC DOB building permits | 10 | Structural · Strengthen existing first-floor wood joists, as shown on drawings. No product keyword matched | 1 | Sep 17, 2026 |
| B | 1250 BROADWAY ASSOCIATES LLC NYC DOB building permits | 10 | Plumbing · AT 27TH FLOOR NORTH TENANT SPACE, INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 13 | Sep 17, 2026 |
| B | HIGH FIVE DAYCARE NYC DOB building permits | 10 | Plumbing · JOB FILED EXISTING COMMERCIAL SPACE TO INSTALL NEW PLUMBING FIXTURES FOR A NEW DAYCARE FACILITY ON THE FIRST FLOOR AS PER PLANS.NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 17, 2026 |
| B | 232 32ND STREET LLC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 17, 2026 |
| B | LIBERTY STAR MANAGEMENT LLC NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION, NEW NON-BEARING PARTITIONS AS PER PLANS HEREWITH FILED. No product keyword matched | 2 | Sep 17, 2026 |
| B | CONG. LUBAVITCH OF EF NYC DOB building permits | 10 | General Construction · THIS APPLICATION IS BEING FILED FOR GENERAL CONSTRUCTION, STRUCTURAL & FOUNDATION WORK TO ESTABLISH USE OF HOUSE OF WORSHIP AT THE CELLAR & OBTAIN NEW CERTIFICATE. No product keyword matched | 1 | Sep 17, 2026 |
| B | CLOUD NY LLC NYC DOB building permits | 10 | Structural · SUBSEQUESNT FILING FOR STRUCTURAL WORK No product keyword matched | 3 | Sep 17, 2026 |
| B | MADISON 841 GROUP LLC NYC DOB building permits | 10 | Plumbing · Propose deli kitchen , gas valve and cooking equipment (stove, grill, fryer) . 3 non residential sink, 2 pc bathroom, 6 floor drain, 1 mop sink, 2 grease trap, 1 dish washer. New HWH in cellar. No product keyword matched | 1 | Sep 17, 2026 |
| B | THE MORGAN LIBRARY & MUSEUM NYC DOB building permits | 10 | Mechanical Systems · Replace existing chillers with new modular water-cooled chillers and associated piping, ductwork, and controls. No change in occupancy, use or egress. No product keyword matched | 2 | Sep 17, 2026 |
| B | ARX CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APT 1C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 17, 2026 |
| B | 71-18 Myrtle Avenue LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW HVAC UNITS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 17, 2026 |
| B | FIVE POINTS 262 PROJECT LLC NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. No product keyword matched | 3 | Sep 17, 2026 |
| B | NEIMAR GROUP INC NYC DOB building permits | 10 | General Construction · Apat. #13D renovation incl. minor interior layout modifications, conversion of one bathroom into a powder room, relocation of the laundry closet door, replacement of existing through AC units and sleeves with new PTACS, refinishing wd floor & paint. No product keyword matched | 1 | Sep 17, 2026 |
| B | CALVERT VAUX CONDOMINIUM NYC DOB building permits | 10 | Plumbing · PERFORM PLUMBING MODIFICATION WORK INCONJUNCTION WITH UNIT#2/3E RENOVATION. INSTALL, RELOCATE, REMOVE & REPLACE PLUMBING FIXTURES. GENERAL CONSTRUCTION WORK FILED UNDER INITIAL FILING. NO CHANGE TO USE, EGRESS, OCCUPANCY AND FIRE PROTECTION. No product keyword matched | 1 | Sep 17, 2026 |
| B | BLUE JAY CONTRACTING INC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND SCAFFOLD AS PER PLANS. SIDEWALK SHED AND SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 17, 2026 |
| B | NYC DEPT. OF EDUCATION NYC DOB building permits | 10 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON ROOF INCLUING ALLRELATED STRUCTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY. No product keyword matched | 8 | Sep 17, 2026 |
| B | CANARSIE CHURCH OF CHRIST INC. NYC DOB building permits | 10 | General Construction · 1. REPLACE SHEET ROCK CEILING IN THE 1ST FLOOR.2. REPLACE SHEET ROCK IN THE ALL WALLS AND CEILING IN THE 2ND FLOOR.3. REPLACE FLOOR TILES IN THE 2ND FLOOR4. REPLACE EXISTING DOOR =4 NOS5. REPLACE EXISTING WINDOWS =5 NOS No product keyword matched | 5 | Sep 17, 2026 |
| B | 1 Park Row NYC DOB building permits | 10 | Plumbing · Plumbing renovation of the 1st floor for office build out. No change in use, egress or occupancy No product keyword matched | 3 | Sep 17, 2026 |
| B | 63RD REALTY INC NYC DOB building permits | 10 | Plumbing · FILED HEREWITH FOR PLUMBING WORKTYPE OF AN EXISTING EATING AND DRINKING ESTABLISHMENT IN CONJUNCTION TO B01444804-I1. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Sep 17, 2026 |
| B | CAPITOL CONTRACTING LLC NYC DOB building permits | 10 | General Construction · interior renovation of existing commercial space on the 3rd Floor. architectural/ Construction No product keyword matched | 4 | Sep 17, 2026 |
| B | 160 West 77th Owners Corp NYC DOB building permits | 10 | Plumbing · Plumbing work proposed in existing unit #6D on the 6th floor. Initial general construction application to be filed. All per submitted plans. No changes to use, egress or occupancy under this application. No product keyword matched | 2 | Sep 17, 2026 |
| B | MODERN SMILES DENTAL CARE NYC DOB building permits | 10 | Plumbing · INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: NEW PLUMBING FIXTURES AND PIPING ROUTES PER NEW DENTAL OFFICE LAYOUT. NEW PLUMBING FIXTURE CALCULATION. NEW RESTROOM PROVIDED. NO CHANGE TO OCCUPANCY, EGRESS OR USE. No product keyword matched | 3 | Sep 17, 2026 |
| B | St. Ann's Warehouse NYC DOB building permits | 10 | General Construction · Temporary platform for Return of The Buffalo adjacent to Bowling Green. Removed at the end of the programing. No changes to existing structures, use or egress.NYC Parks permit number is 947467. No product keyword matched | 1 | Sep 17, 2026 |
| B | WASTE MANAGEMENT NYC DOB building permits | 10 | General Construction · Removal of 3-story structure located within building and reinforcing of associated existing columns No product keyword matched | 1 | Sep 17, 2026 |
| B | KITCHEN EXHAUST SOLUTION NYC DOB building permits | 10 | General Construction · Construction of new mechanical enclosure around mechanical equipment on existing roof. Aluminum enclosure with louvered openings for ventilation with green roof. All construction to occur only on 1st floor ROF setback. No change to use, egress, occupancy No product keyword matched | 1 | Sep 17, 2026 |
| B | KRAUS RESTORATION INC NYC DOB building permits | 10 | General Construction · Repair Stucco on the exterior backwall as per plan No product keyword matched | 1 | Sep 17, 2026 |
| B | CORE CONTINENTAL MANAGEMENT NYC DOB building permits | 10 | Structural · Selective Repair of Brick Replacement, Repointing , Stone and Concrete patching , Lintel refurbishment , Increasing Hight of Parapet and brick Pining No product keyword matched | 1 | Sep 17, 2026 |
| B | A1 FANTASTIC CONSTRUCTION NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown on Plans No product keyword matched | 1 | Sep 17, 2026 |
| B | DEZAIO PRODUCTIONS, INC NYC DOB building permits | 10 | Structural · Utilize,repair, or modify existing reusable connection points on the bldg for temp decorative holiday displays as shown on plans. Pursuant to 28-105.4.5, #6 AC,these points may be reused perpetually for such displays.No change in use, egress or occupancy No product keyword matched | 1 | Sep 17, 2026 |
| B | NEW YORK CITY ECONOMIC DEVELOPMENT NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 17, 2026 |
| B | THE GREEN-WOOD CEMETERY NYC DOB building permits | 10 | Solar · INSTALL SOLAR PV ON [3] EXISTING BUILDING ROOFTOPS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. FEE EXEMPT. No product keyword matched | 1 | Sep 17, 2026 |
| B | EAST 224TH REALTY LLC NYC DOB building permits | 10 | Construction Fence · FILING TO INSTALL A CONSTRUCTION FENCE FOR DEMOLITION PURPOSES No product keyword matched | 1 | Sep 17, 2026 |
| B | The Boardr NYC DOB building permits | 10 | General Construction · Temporary and portable structures for a Red Bull Origins event at Gotham Park. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 1 | Sep 17, 2026 |
| B | The Union Club NYC DOB building permits | 10 | Mechanical Systems · REPLACEMENT OF EXISTING ROOFTOP UNITS AND INSTALLATION OF NEW CURB ADAPTERS ON EXISTING ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 17, 2026 |
| B | STRUCTURE TECH WATERPROOF NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF KITCHEN AND BATHROOM IN APARTMENT 6A AS PER PLANS FILED HEREWITH. NO CHANGE IN USE , EGRESS, OR OCCUPANCY. PL TO BE FILED SEPERATELLY No product keyword matched | 1 | Sep 17, 2026 |
| B | ESTATE OF SIXTO ULLOA NYC DOB building permits | 10 | Boiler Equipment · BL WORK TYPE IS HEREWITH FILED TO REPLACE EXISTING BOILER. No product keyword matched | 1 | Sep 17, 2026 |
| B | CHRISTINE CHENG, RA NYC DOB building permits | 10 | Mechanical Systems · Mechanical work filed in conjunction with the renovation of an existing two family dwelling. Mechanical work as per plans. No change of use, occupancy or egress. No product keyword matched | 1 | Sep 17, 2026 |
| B | Statwood Home Improvements NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY DOUBLE-FACE PROJECTING ACCESSORY SIGN - STATWOOD. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 17, 2026 |