Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | JRD BROTHERS INC. NYC DOB building permits | 10 | General Construction · PROPOSED INTERIOR AND EXTERIOR RENOVATION TO EXISTING TWO-STORY, ATTIC, AND CELLAR. NO CHANGE TO BUILDING BULK, USE GROUP, EGRESS OR OCCUPANCY No product keyword matched | 3 | Sep 21, 2026 |
| B | SILVER STAR PROPERTIES CORP. |
| 10 |
General Construction · AT THE 3RD FL. APT# 3A, TO REMOVE AN ECB VIOLATION# 39135994R. IN THE HALWAY, TO REMOVE A CLOSET AND SMALL WOOD PARTITIONS. ALSO, TO INSTALL A VINYL FLOOR ON THE HALWAY. NO CHANGE OF USE, EGRESS AND/OR OCCUPANCY. No product keyword matched |
| 1 |
| Sep 21, 2026 |
| B | PERSPECTIVE GENERAL CONST NYC DOB building permits | 10 | General Construction · Obtain new c of o for the 1st floor from 1 commercial store and 1 family to 1 commercial store only. No product keyword matched | 3 | Sep 21, 2026 |
| B | MIDDLE VILLAGE CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · MINOR RENOVATION OF 1ST FLOOR COMMERCIAL SPACE. PROPOSED ICE CREAM SHOP. No product keyword matched | 2 | Sep 21, 2026 |
| B | PREMIER FIRE SPRNKLR CO NYC DOB building permits | 10 | Sprinklers · MSM SP N - SPRINKLER MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 21, 2026 |
| B | JUHUI SERVICES INC NYC DOB building permits | 10 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. No product keyword matched | 1 | Sep 21, 2026 |
| B | FOREST HILLS PROPERTY GROUP LTD NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Sep 21, 2026 |
| B | JUDSON REALTY LLC NYC DOB building permits | 10 | Mechanical Systems · Removal of existing 2-ton heat pump unit on roof. Relocation of existing ductwork as per plan. No change to occupancy, use, or egress. No product keyword matched | 1 | Sep 21, 2026 |
| B | ROD NEW YORK LLC NYC DOB building permits | 10 | Plumbing · SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH APPROVED GC # B01043157-I1 No product keyword matched | 1 | Sep 21, 2026 |
| B | ATLAS CONSTRUCTION GROUP NYC DOB building permits | 10 | General Construction · APPLICATION FILING FOR MINOR RENOVATION INCLUDING HORIZONTAL ENLARGEMENT 165 SF AS PER PLAN FOR EXISTING TWO FAMILY HOME AND EXISTING CO#B000141784 TO REMAIN. NO CHANGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 21, 2026 |
| B | NELSON MANAGEMENT GROUP LTD. NYC DOB building permits | 10 | Suspended Scaffold · Outriggers system installation for facade repairs, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 21, 2026 |
| B | VELOCITY PLBG&HTG LI INC NYC DOB building permits | 10 | Plumbing · Plumbing work filed in conjunction with apartment #4B renovation. No product keyword matched | 1 | Sep 21, 2026 |
| B | TRUE SERVICE NY, INC. NYC DOB building permits | 10 | General Construction · Structural Support of Existing Facade and Parapet Wall Associated with Roof Recover. No product keyword matched | 1 | Sep 21, 2026 |
| B | FIRST CNSTRCTION ZONE INC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work being filed for the installation of a commercial packaged roof top unit with associated ductwork and accessories. No change to egress, use occupancy. No product keyword matched | 2 | Sep 21, 2026 |
| B | NEW FIELD CONSTRUCTION IN NYC DOB building permits | 10 | Curb Cut · PROPOSING NEW CURB-CUT TO 18'-0 INCLUDING SPLAYS. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK. No product keyword matched | 1 | Sep 21, 2026 |
| B | SUPERIOR HVAC INC NYC DOB building permits | 10 | Mechanical Systems · PROPOSED INSTALLATION OF 4 NEW GAS FIRED COMBO FURNACES, 4 NEW CONDENSERS & ASSOCIATED EXHAUST VENTILATION AS PER PLANS. ASSOC GAS PIPING UNDER PL JOB# M01103187. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 21, 2026 |
| B | KLDNY INC NYC DOB building permits | 10 | General Construction · Renovation of an existing apartment. No change of use, occupancy or egress under this application. No product keyword matched | 4 | Sep 21, 2026 |
| B | TRINITY STEWART Managemnt Assoc LLC NYC DOB building permits | 10 | Mechanical Systems · Modification of exist flue on the roof as per plans filed herewith. No change in use, egress and occupancy. No product keyword matched | 1 | Sep 21, 2026 |
| B | MANAS LLC NYC DOB building permits | 10 | General Construction · Application file for facade repair work as per plan and removal NYC DOB issued ECB violation #39200204L. No product keyword matched | 1 | Sep 21, 2026 |
| B | SUMMIT INTERIORS, INC. DBA SUMMIT C NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 21, 2026 |
| B | 5216 ROOSEVELT AVE LLC NYC DOB building permits | 10 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE WORK AT OSP.IN CONJUNCTION WITH NB APPLICATION #321954364. No product keyword matched | 3 | Sep 21, 2026 |
| B | DUBAI DEVELOPMENT GR CORP NYC DOB building permits | 10 | Structural · NEW ONE CAR GARAGE No product keyword matched | 1 | Sep 21, 2026 |
| B | ANGELINAS RISTORANTE NYC DOB building permits | 10 | Mechanical Systems · APPLICATION IS FILED FOR THE INSTALLATION OF (1) ONE ROOF TOP UNIT AT ROOF ON COVERED PORCH OF EXISTING COMMERCIAL BUILDING. NO CHANGE IN USE, OR OCCUPANCY UNDER THIS APPLICATION. ALL WORK AS PER PLANS SUBMITTED HEREWITH. No product keyword matched | 1 | Sep 21, 2026 |
| B | Davis Realty NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 21, 2026 |
| B | LYNCH STREET ESTATES LLC NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM No product keyword matched | 6 | Sep 21, 2026 |
| B | KORK INC NYC DOB building permits | 10 | Structural · Structural work in conjunction with full gut renovation: partial demolition; new/reinforced floor and roof framing, beams, posts, stair openings, rear facade framing/openings, bulkhead roof framing, and associated temporary bracing. No product keyword matched | 3 | Sep 21, 2026 |
| B | 21029 26 AVE LLC NYC DOB building permits | 10 | Plumbing · UNDERGROUND PLUMBING IN CONJUNCTION WITH THE NB Q01230197-I1 No product keyword matched | 2 | Sep 21, 2026 |
| B | 2138 E 26 TH LLC NYC DOB building permits | 10 | Plumbing · Propose plumbing work of existing residential building in conjunction with ACO#B01396323-I1 as per plan. No change in use, egress, or occupancy. No product keyword matched | 2 | Sep 21, 2026 |
| B | AMBROSINO CONSTRUCTION CORP NYC DOB building permits | 10 | Sprinklers · MODIFY SPRINKLER SYSTEM FOR EXISTING 2-STORY BUILDING SUBSEQUENT WITH DOB NOW#B01425982,NO CHANGE IN USE,EGRESS AND OCCUPANCY. No product keyword matched | 2 | Sep 21, 2026 |
| B | MJ GENERAL MECHANICAL LLC NYC DOB building permits | 10 | Boiler Equipment · INSTALL REPLACEMENT BOILER/BURNER UNIT AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 21, 2026 |
| B | A.E. CONSTRUCTION, LLC NYC DOB building permits | 10 | General Construction · Exterior renovation of rear deck as per plans filed herewith, to resolve violations. No product keyword matched | 2 | Sep 21, 2026 |
| B | PRADA USA CORP NYC DOB building permits | 10 | Structural · Modification of existing rooftop equipment dunnage framing and new steel beams to existing on dunnage level to support new replacement chillers and associated pumps as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 21, 2026 |
| B | ALL STATE 12 GENERAL CONT NYC DOB building permits | 10 | General Construction · Existing cinder block shed to be removed. Resolving violation # 34869925Y. No change in use, egress, or occupancy. No product keyword matched | 1 | Sep 21, 2026 |
| B | VARIANT SERVICES, INC. NYC DOB building permits | 10 | General Construction · INTERIOR FIT OUT OF AN EXISTING OFFICE SPACE. ADDITION OF NON LOAD BEARING PARTITION, RELATED CONSTRUCTION AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 21, 2026 |
| B | Dorchester Heights Condominium NYC DOB building permits | 10 | Structural · HEREBY FILING FOR PARAPET REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 21, 2026 |
| B | HYLAN ESTATES LLC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM No product keyword matched | 4 | Sep 21, 2026 |
| B | A&A PRO GENERAL CONTR NYC DOB building permits | 10 | General Construction · Interior renovation of existing commercial space into bakery store. No change in use, egress or occupancy. No product keyword matched | 3 | Sep 21, 2026 |
| B | EJM DEVELOPMENT NYC DOB building permits | 10 | Full Demolition · FULL DEMOLITION OF A 2-STORY HOUSE No product keyword matched | 2 | Sep 21, 2026 |
| B | 11114 101 Ave Corp NYC DOB building permits | 10 | General Construction · CONVERSION OF EXISTING CHURCH (PREVIOUSLY ONE FAMILY DWELLING) ON FIRST FLOOR TO RETAIL STORE AND ONE FAMILY DWELLING UNIT RENOVATION ON SECOND FLOOR. No product keyword matched | 2 | Sep 21, 2026 |
| B | POLAR CONTRACTING INC NYC DOB building permits | 10 | Full Demolition · Proposed full demolition of two family residential fully detached building. No product keyword matched | 4 | Sep 21, 2026 |
| B | TRIGON 52 L.L.C. NYC DOB building permits | 10 | Plumbing · Furnish and install new plumbing fixtures, piping and equipment where indicated on the contract drawings, connect to existing stacks and risers, filed in conjunction with Doc I1. Alteration of sprinkler system based on filed plans. No product keyword matched | 2 | Sep 21, 2026 |
| B | ORCHARD LODGING LLC NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL SYSYTEMS FOR A 6-STORY MIXED USE BUILDING IN CONJUNCTION WITH ALT1 JOB # Q00725448 No product keyword matched | 1 | Sep 21, 2026 |
| B | REBALANCE SPA INC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK ON 1ST FLOOR BEAUTY SALON AND CELLAR OF EXISTING 2-STORY BUILDING AS PER PLANS FILED HEREWITH, RELATED GENERAL CONSTRUCTION WORK HAS BEEN FILED INITIALLY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Sep 21, 2026 |
| B | SJ SHAMIE REALTY LLC. NYC DOB building permits | 10 | Mechanical Systems · Mechanical filing to obtain Equipment Use Permits (COC) for existing AC units on the roof as indicated on drawings to comply with FDNY summons 014165612M & 014259875L No product keyword matched | 4 | Sep 21, 2026 |
| B | MAC MAINTENANCE & REPAIR NYC DOB building permits | 10 | Structural · Structural wort filed in conjunction with the renovation of residence. Framing for rear porch and dunnage for roof condensers. No product keyword matched | 3 | Sep 21, 2026 |
| B | LWS CONSTRUCTION INC NYC DOB building permits | 10 | Foundation · Horizontal extension: single family dwelling. New addition at first floor and second floor for family room, kitchen, 2 bedrooms and 2 bathrooms. No product keyword matched | 2 | Sep 21, 2026 |
| B | Havem LLC NYC DOB building permits | 10 | Plumbing · PLUMBING AND SPRINKLER ALTERATIONS FOR NEW BAKERY INTERIOR ALTERATIONS ON 1ST FL. WORK SCOPE INCLUDES NEW PLUMBING FIXTURES, KITCHEN EQUIPMENT, AND SPRINKLER HEAD REPLACEMENTS. NO CHANGE IN USE, OCCUPANCY, EGRESS AND STRUCTURE UNDER THIS APPLICATION. No product keyword matched | 4 | Sep 21, 2026 |
| B | 7-ELEVEN NYC DOB building permits | 10 | General Construction · INTERIOR ALTERATIONS OF EXISTING GROUND FLOOR COMMERCIAL TENANT SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 5 | Sep 21, 2026 |
| B | XINYE CONSTRUCTION INC NYC DOB building permits | 10 | Construction Fence · INSTALL A TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Sep 21, 2026 |
| B | BINART NYC DOB building permits | 10 | General Construction · RESOLUTION OF ECB VIOLATION 39186760Y, RENOVATION OF FRONT PORCH & YARDS ASSOCIATED WITH 1-FAMILY DWELLING, NO CHANGE IN USE/EGRESS/OCCUPANCY/YARDS OR BULK PROPOSED UNDER THIS APPLICATION No product keyword matched | 2 | Sep 21, 2026 |