Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | M&M PLUMBING & HEATING IN NYC DOB building permits | 10 | Plumbing · REPLACEMENT OF PLUMBING FIXTURES WITHIN EXISTING APARTMENT IN ORDER TO SUPERSEDE & SIGNOFF WORK FILED UNDER JOB #110010684. ALL WORK COMPLETED. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 22, 2026 |
| B | E. TUNNEY INTERIOR CONTRA |
| 10 |
General Construction · Filing for interior demo and general construction of a Class A apartment, unit 4D. No change of use, egress or occupancy. No product keyword matched |
| 2 |
| Sep 22, 2026 |
| B | CRISTINA MICHAELS CONST* NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK UNDER JOB#M01169191-I1-GC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | VECTRA CONSTRUCTION CORP NYC DOB building permits | 10 | Mechanical Systems · PROPOSED NEW INSTALLATION OF SPLIT DX COOLING SYSTEM, TOILET & LAUNDRY EXHAUST FANS AND RELATED DUCT AND PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO OCCUPANCY USE OR EGRESS. No product keyword matched | 1 | Sep 22, 2026 |
| B | PROJECT EYE CONSULTANTS I NYC DOB building permits | 10 | General Construction · REPAIR/REPLACE DAMAGED/BROKEN MASONRY BLOCK AND MORTAR AT EXISTING GARAGE. FILING IN ORDER TO RESOLVE FAILURE TO MAINTAIN VIOLATION #348596. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 2 | Sep 22, 2026 |
| B | NATIONAL ENVIROMENTAL SAF NYC DOB building permits | 10 | General Construction · Interior removals of partitions, ceilings and finishes No product keyword matched | 1 | Sep 22, 2026 |
| B | Vincent Anzalone NYC DOB building permits | 10 | Plumbing · NEW 2 GAS SERVICE SERVICING IN OSP CONNECTED TO EXISTING BOILER, INSTALLATION OF NEW WATER HEATER, AND (2) EXISTING GAS METERS IN CEL AS PER PLANS. No product keyword matched | 1 | Sep 22, 2026 |
| B | SWEET PROSPECT REALTY LLC NYC DOB building permits | 10 | Standpipe · INSTALL TEMPORARY DRY STANDPIPE SYSTEM DURING CONSTRUCTION AS PER PLANS FILED IN CONJUNCTION WITH NB JOB# 321183287.NO CHANGE IN USE,EGRESS AND OCCUPANCY. No product keyword matched | 3 | Sep 22, 2026 |
| B | THE JOYCE THEATER NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33. No product keyword matched | 1 | Sep 22, 2026 |
| B | LOPOPOLO IRON WORKS INC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING FILING No product keyword matched | 5 | Sep 22, 2026 |
| B | CRESCENT ACCOUNTING & TAX SERVICE NYC DOB building permits | 10 | Support of Excavation · Support of excavation design for 2-story new building with cellar No product keyword matched | 4 | Sep 22, 2026 |
| B | BEBE ASSOCIATE INC NYC DOB building permits | 10 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 22, 2026 |
| B | ILG MECH SERVICES, INC NYC DOB building permits | 10 | Sprinklers · THE FIRE PROTECTION DRAWINGS REPRESENTS WORK ASSOCIATED WITH FULL DEMOLITION # M01310305-I1 OF AN EXISTING BUILDING. SIGNIFICANT ITEMS RELATING TO THIS SCOPE OF WORK ARE AS FOLLOWS: DEMOLITION OF FIRE SPRINKLER SYSTEMS IN THE BUILDING IN ITS ENTIRETY: No product keyword matched | 2 | Sep 22, 2026 |
| B | VISION 21 INC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF WATER COOLED HEAT PUMP , CONDENSATE PUMP, AND ASSOCIATED PIPING IN EXISTING IT ROOM ON 30TH FL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | BARGAIN PLUMBING INC NYC DOB building permits | 10 | Plumbing · Plumbing work related to the renovation of apartment 12C on the 12th floor. No product keyword matched | 1 | Sep 22, 2026 |
| B | 7 HANOVER FEE OWNER CO LLC NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for Facade Restoration as Shown Plans No product keyword matched | 1 | Sep 22, 2026 |
| B | PMZ CONSTRUCTION CORP NYC DOB building permits | 10 | Structural · Application is filed for interior/ exterior renovation to two family home including new roof terrace per plans submitted herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | 45 CHRISTOPHER 2E LLC NYC DOB building permits | 10 | General Construction · Filing for interior demolition and general construction of an apartment unit. No change of use, egress of occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | BRICK TECH RESTORATION CO NYC DOB building permits | 10 | General Construction · REPLACEMENT OF PARAPET WALL AND DAMAGED BRICK EXTERIOR WALL WITH BRICK POINTING WORK TO INCLUDE REPLACEMENT OF BRICKFACE AT FRONT. NO CHANGE OF USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | A & D GENERAL CONTR INC NYC DOB building permits | 10 | General Construction · Facade Repair. Addressing Violations # V 050125C25-00700 & 39149729N. No change to use, egress or occupancy. No product keyword matched | 2 | Sep 22, 2026 |
| B | NEUE GALERIE NEW YORK NYC DOB building permits | 10 | Boiler Equipment · Installation of the new electrical boiler as per submitted plans. No change in use , occupancy or egress. No product keyword matched | 1 | Sep 22, 2026 |
| B | KAITO MANAGEMENT NYC DOB building permits | 10 | General Construction · EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | URBAN MASONRY&CONCRETE CO NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Sep 22, 2026 |
| B | MALTA BUILDERS CORP NYC DOB building permits | 10 | Plumbing · APPLICATION FILED TO CAP AND REMOVE EXISTING PLUMBING FIXTURES IN CELLAR TO RESOLVE ECB VIOLATIONS, INSTALL NEW COMBINATION BOILERS AND PLUMBING FIXTURES ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Sep 22, 2026 |
| B | PROPERTY NYC DOB building permits | 10 | General Construction · INSTALLATION OF FIXED ACCESSORY BUSINESS AWNINGS ON THE WEST FACADE OF THE EXISTING BUILDING AS PER THE DRAWING FILED HEREIN. No product keyword matched | 1 | Sep 22, 2026 |
| B | NEW CASTLE DELI GRILL NYC DOB building permits | 10 | Plumbing · THE PURPOSE OF THIS FILING IS TO PROVIDE PLUMBING WORK IN COMPLIANCE WITH ECB VIOLATION #39196835Z. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | CITI FIELD NYC DOB building permits | 10 | General Construction · Temporary Installations to be used on a temporary event YES CHEF. All the Installations are to be removed upon completion of the event. No product keyword matched | 1 | Sep 22, 2026 |
| B | Alef Realty NYC DOB building permits | 10 | Boiler Equipment · REPLACE TWO GAS FIRED BOILERS. No product keyword matched | 2 | Sep 22, 2026 |
| B | ANDRES URENA NYC DOB building permits | 10 | Sprinklers · PROPOSE LEGALIZATION OF SPRINKLER SYSTEM AND PLUMBING FIXTURES ORIGINALLY FILED AND PERMITTED ON CELLAR FNS FIRST FLOOR ONLY UNDER APPLICATION# 400850860 AS PER PLANS FILED HEREWITH. No product keyword matched | 2 | Sep 22, 2026 |
| B | VIVID HOME FINISHES LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APT 2C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 22, 2026 |
| B | The Heights Casino NYC DOB building permits | 10 | General Construction · Propose an Alt-2 renovation of the 2nd Floor and Mezzanine at 2nd Floor of an existing Old-Code, 3 story, Community Center Building with general construction and fit-in enlargement of the mezzanine level. No change in occupancy, use or egress. No product keyword matched | 1 | Sep 22, 2026 |
| B | ASD Legacy LLC NYC DOB building permits | 10 | Construction Fence · THE PURPOSE OF THIS FILING IS TO PROVIDE A CONSTRUCTION FENCE FOR PROPOSED STOREFRONT REPLACEMENT IN CONJUNCTION WITH DOB NOW APPLICATION # B01457117-I1. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | COMPLETE RENOVATION & CON NYC DOB building permits | 10 | Foundation · STRUCTURAL & FOUNDATION WORK FOR THE ADDITION OF A 2-STORY EXTENSION AT REAR OF EXISTING 3-STORY BUILDING WITH BASEMENT & CELLAR AS PER PLANS FILED HEREWITH. NO CHANGES TO EGRESS, USE OR OCCUPANCY No product keyword matched | 1 | Sep 22, 2026 |
| B | Town Tennis Member Club NYC DOB building permits | 10 | Mechanical Systems · Scope is to indicate all existing cooking equipment and mechanical infrastructure for record and reference only. Mechanical plans are reference only in reference to plumbing filing M01393105-S1. No product keyword matched | 1 | Sep 22, 2026 |
| B | 10818 QB LLC NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT. No product keyword matched | 1 | Sep 22, 2026 |
| B | 101 Greenwich GC LLC NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. TEMPORARY PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 22, 2026 |
| B | GENSLER NYC DOB building permits | 10 | General Construction · Throggs Neck 07, Exterior Roof repairs: Removal/replacement/repairs of existing roof membrane, cracked masonry units, parapet, roof deck, drains, bulkhead door & window, spalled concrete. Install guard rail and Masonry chimney height reduction. No product keyword matched | 2 | Sep 22, 2026 |
| B | Gettleson, Witzer & O'Connor NYC DOB building permits | 10 | General Construction · This Alteration is being filed for the interior renovation and combination of existing apartments #18GK, 18EF located on 18th floor. There are no change in use, egress or occupancy. No product keyword matched | 3 | Sep 22, 2026 |
| B | FLS CHINA UNITED METHODIST CHURCH NYC DOB building permits | 10 | Plumbing · INSTALLATION OF WATER CLOSET, LAVATORY AND URINAL No product keyword matched | 2 | Sep 22, 2026 |
| B | Diana’s Nails Boutique NYC DOB building permits | 10 | Plumbing · PLUMBING WORK No product keyword matched | 3 | Sep 22, 2026 |
| B | GC LAUNCHPAD LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATIONS AS INDICATED ON THE DRAWINGS. No product keyword matched | 2 | Sep 22, 2026 |
| B | QUEENS JADE INC NYC DOB building permits | 10 | General Construction · Interior remodeling of 2nd Floor apartment #1 and #2 to address ECB summons 39104053N and restore both apartments to their previous legal condition by replacing the wall and its firestopping. No change of use, egress, or occupancy. No product keyword matched | 2 | Sep 22, 2026 |
| B | Actinium Pharma NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF A VENTILATION SYSTEM TO CREATE A CLEANROOM ON THE 12TH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | JENKINS PROPERTY HOLDINGS NYC DOB building permits | 10 | Mechanical Systems · New Split system Heat Pump @ roof with new condensing units @ cellar No product keyword matched | 2 | Sep 22, 2026 |
| B | New Generation Daycare NYC DOB building permits | 10 | Plumbing · SPRINKLER INSTALLATION FOR PARTIAL BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | Chelsea W 26 LLC NYC DOB building permits | 10 | General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST FLOOR LOBBY AND CELLAR. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 22, 2026 |
| B | DOUBLE R CONTRACTING INC NYC DOB building permits | 10 | Mechanical Systems · CH Endo: Modification of HVAC equipment and ductwork to accommodate new storage room accessory to the existing medical office as per plans. No change to use, egress or occupancy. No product keyword matched | 2 | Sep 22, 2026 |
| B | 234 MID 14TH APT CORP NYC DOB building permits | 10 | Structural · PARTIAL SIDEWALK VAULT REPAIRS AS SHOWN ON PLANS No product keyword matched | 1 | Sep 22, 2026 |
| B | BARBARA MILLER LLC FARKOUHFURMAN&FA NYC DOB building permits | 10 | General Construction · FILING OF FACADE REPOINTING AND PAINTING AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE No product keyword matched | 1 | Sep 22, 2026 |
| B | Q UTOPIA Ilc NYC DOB building permits | 10 | Solar · Installation of Solar panels on existing roof structure, No change in use, egress or occupancy. No product keyword matched | 1 | Sep 22, 2026 |