Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | BLAZE PLUMBING & HEATING NYC DOB building permits | 10 | Plumbing · RENOVATION OF AN APARTMENT WHICH INCLUDES THE REPLACEMENT OF FIXTURES, ASSOCIATEDPIPING, VALVES AND COMPONENTS. REFER TO PLUMBING FLOOR PLANS, RISER DIAGRAMS ANDARCHITECTURAL DRAWING SET FOR FURTHER INFORMATION IN REGARD TO THE SCOPE OF WORK. No product keyword matched | 4 | Sep 22, 2026 |
| B |
| RYOUN LLC NYC DOB building permits |
| 10 |
Structural · Structural Shoring and Bracing on the Cellar, 1st thru 4th floors and Roof. Filed in conjunction with application M00991192-I1. No product keyword matched |
| 2 |
| Sep 22, 2026 |
| B | 101 WEST END REIT LLC NYC DOB building permits | 10 | Structural · SUBSQUENT STRUCTURAL FILING FOR NEW STAIR OPENING BETWEEN 18TH AND 19TH FLOOR; INSTALLATION OF FRAMING SUPPORT NEW STAIR AND FLOOR SLAB. NO CHANGES TO EGRESS, OCCUPANCY OR USE. No product keyword matched | 3 | Sep 22, 2026 |
| B | MACE RENOVATIONS LLC NYC DOB building permits | 10 | General Construction · General construction of interior of Unit 31C. Includes removal and installation of partitions, installation of new washer & dryer, cabinetry, finish material, and plumbing fixtures as per per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | TARGET PIPING NY LLC NYC DOB building permits | 10 | Plumbing · PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01349788-I1 No product keyword matched | 10 | Sep 22, 2026 |
| B | VANDERBILT PROPERT MANAGMENT NYC DOB building permits | 10 | Plumbing · PLUMBING WORK RELATED TO THE INTERIOR RENOVATION AND COMBINATION OF APARTMENT UNITS 4C AND 4D. THIS WORK IS TO SUPERSEDE APPLICATION NUMBER 102455111. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Sep 22, 2026 |
| B | CORE RENOVATION LLC NYC DOB building permits | 10 | General Construction · Exterior Facade Repairs. No change to use, egress, or occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | ATTIC TO BASEMENT HOME NYC DOB building permits | 10 | General Construction · Apartment (#12N) renovation on the 12th floor. No change to use, egress or occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | Parkchester North Condominium NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION VIA INDUSTRIAL ROPE ACCESS No product keyword matched | 2 | Sep 22, 2026 |
| B | THE TRUMP CORPORATION NYC DOB building permits | 10 | Sprinklers · APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 3 | Sep 22, 2026 |
| B | ELEMENT TIMES SQUARE HOTEL NYC DOB building permits | 10 | Suspended Scaffold · MATERIAL HOIST. FOR MATERIAL ONLY. NO WORK FROM HOIST. No product keyword matched | 1 | Sep 22, 2026 |
| B | HM BUILD AND UPLIFT CORP NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR WORK COMPLETED W/O BENEFIT OF A PERMIT AT GARAGE, & FOR RESOLUTION OF DOB/ECB VIOLATIONS. garage renovation/enlargement No product keyword matched | 3 | Sep 22, 2026 |
| B | P & K CONTRACTING INC NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND FACADE INSPECTION AT 1865 UNIVERSITY AVENUE, BRONX, NY 10453 No product keyword matched | 3 | Sep 22, 2026 |
| B | EPIC LAFAYETTE LLC NYC DOB building permits | 10 | Mechanical Systems · Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 1 | Sep 22, 2026 |
| B | LIFETIME SK CONSTRUCTION NYC DOB building permits | 10 | General Construction · Legalize the existing bathroom in the cellar space and remove non-bearing wall partitions. No product keyword matched | 1 | Sep 22, 2026 |
| B | CONSTRUCTION USA INC NYC DOB building permits | 10 | Mechanical Systems · FILING FOR TWO NEW HVAC AND ERV MECHANICAL SYSTEMS IN CONJUNCTION WITH NB#Q00912114-I1. No product keyword matched | 1 | Sep 22, 2026 |
| B | OCEAN BAY RAD LLC NYC DOB building permits | 10 | General Construction · Partial reinforced concrete ceiling deck replacement in Apt. #D. to address the ECB Violation (39196289K). General repairs in Apt. #D & Apt. #1E for the direct results of the partial ceiling collapse. No change in egress, use or occupancy. No product keyword matched | 1 | Sep 22, 2026 |
| B | SLC RESTORATION CORP NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF SPLIT HVAC SYSTEMS ALONG WITH ASSOCIATED DUCTWORK & PIPING AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 1 | Sep 22, 2026 |
| B | NYC DESIGN & RENO LLC NYC DOB building permits | 10 | General Construction · Demolition and construction of non-load bearing partitions as per filed plans. No change in occupancy, use, or egress. No product keyword matched | 4 | Sep 22, 2026 |
| B | HOBO CONSTRUCTION CO, INC NYC DOB building permits | 10 | General Construction · PROPOSE TO PERFORM FACADE REPAIR WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRERSS OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | BK BUILD VENTURES,LLC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK, REAR FACADE WALL, PARTIAL RECONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | AMERICAN SRIL ANKA BUDDHIST ASSC NYC DOB building permits | 10 | General Construction · APPLICATION FILED TO REPAIR EXTERIOR SIDING TO LEFT SIDE OF BUILDING CAUSED BY FIRE DAMAGE. THE REST OF THE BUILDING IS BEING CONSTRUCTED UNDEDR NEW BUILDING APPICATION NUMBER 520360546 No product keyword matched | 1 | Sep 22, 2026 |
| B | RANBROS CONSTRUCTION LLC NYC DOB building permits | 10 | General Construction · PROPOSED INTERIOR RENOVATION OF AN EXISTING 1-FAMILY DWELLING, PARTITION WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | HARD REALTY NYC DOB building permits | 10 | Plumbing · PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01274535-I1 No product keyword matched | 2 | Sep 22, 2026 |
| B | KIRI CONSTRUCTION CORP. NYC DOB building permits | 10 | Plumbing · Provide new sprinkler and plumbing system in conjunction with NB X01130512 No product keyword matched | 2 | Sep 22, 2026 |
| B | ALL CON CONTRACTING CORP NYC DOB building permits | 10 | General Construction · Interior renovation of existing apartment on the 20th floor, Apartment PHT. No change in use, occupancy or egress. No product keyword matched | 1 | Sep 22, 2026 |
| B | RAF GENERAL CONTRACTING CORP. NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME No product keyword matched | 3 | Sep 22, 2026 |
| B | SKYLINE WILLOUGHBY LLC NYC DOB building permits | 10 | General Construction · THE PURPOSE OF THIS FILING IS TO REPAIR EXISTING WOOD JOISTS AT CELLAR CELLER CEILING (REAR) DUE TO FIRE AND RESTORE FIRE RESISTANT RATED ASSEMBLIES AT CEILING. ALSO FILING TO COMPLY WITH ECB VIOLATIONS 39178466N & 39178467P. No product keyword matched | 1 | Sep 22, 2026 |
| B | 117 Food Corp NYC DOB building permits | 10 | General Construction · Proposed alteration to existing retail store and storage space to create new supermarket with commercial kitchen, deli, meat, poultry and fish sells and preparation walk-in cooler and freezers and storage on Cellar & 1st floor. No product keyword matched | 1 | Sep 22, 2026 |
| B | REGAL CONSTRUCTION GROUP NYC DOB building permits | 10 | General Construction · Repair parapet wall and partial facade on exposure 2. No product keyword matched | 1 | Sep 22, 2026 |
| B | 11 GREENE ST LLC NYC DOB building permits | 10 | Construction Fence · filing for a temporary construction fence No product keyword matched | 1 | Sep 22, 2026 |
| B | F.S. WORKS INC NYC DOB building permits | 10 | Sprinklers · Sprinkler work filed in conjunction to nb application No product keyword matched | 3 | Sep 22, 2026 |
| B | UBS BUILDERS, LLC NYC DOB building permits | 10 | Mechanical Systems · Renovation of an existing duplex apartment on the 3rd and 4th floors. Work includes non-structural demolition, general construction and minor mechanical modification as per plans filed herewith. no change to use egress or occupancy. No product keyword matched | 5 | Sep 22, 2026 |
| B | GUSTAV RESTORATION LLC NYC DOB building permits | 10 | Protection and Mechanical Methods · Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 22, 2026 |
| B | MILLENIUM RESTORATION COR NYC DOB building permits | 10 | Structural · Facade repairs as per plans. No change to use, occupancy, or egress. No product keyword matched | 4 | Sep 22, 2026 |
| B | YU HUA CONSTRUCTION CORP NYC DOB building permits | 10 | Curb Cut · SUBSEQUENTFILING FOR CURE CUT WORK TYPE IN CONJUNCTION WITH NB APPLICATION #B00991102. No product keyword matched | 1 | Sep 22, 2026 |
| B | TRADITIONAL WATER AND RES NYC DOB building permits | 10 | Suspended Scaffold · suspended scaffold for inspection and work, adding new 1 and 2 meter work cage platform for tight spaces. everything remains the same. No product keyword matched | 3 | Sep 22, 2026 |
| B | 2468 LLC NYC DOB building permits | 10 | Sprinklers · INSTALL NEW PLUMBING SPRINKLER SYSTEM FOR NEW 6-STORY RESIDENTIAL BUILDING SUBSEQUENT WITH NB JOB#Q01076570.NO CHANGE IN USE,EGRESS AND OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | 76 HOYT STREET, LLC NYC DOB building permits | 10 | Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | ASG CONSTRUCTION GROUP IN NYC DOB building permits | 10 | General Construction · HEREBY FILING FOR RENOVATION OF UNIT 2BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 22, 2026 |
| B | MENON INVESTMENTS LLC NYC DOB building permits | 10 | General Construction · SPOT MASONRY REPLACEMENT, LINTEL REPLACEMENT, WINDOW SILL REPLACEMENT, TERRA COTTA REPAIR, FIRE ESCAPE REFURBISHMENT, INSTALLATION OF GUARDRAILS, JOINT SEALANT REPLACEMENT AND STUCCO REPAIR. NO CHANGES TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | LENOX HILL HOSPTIAL NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 22, 2026 |
| B | EMMUT PROPERTIES CORP NYC DOB building permits | 10 | General Construction · REPAIR BALCONY DUE TO EXPOSED STEEL REINFORCEMENT AT APT. 2B ON THE 3RD FLOOR, EXPOSURE #3. FILED TO RESOLVE ECB VIOLATION #39188670J AND 35729654N. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Sep 22, 2026 |
| B | BERNSTEIN REAL ESTATE NYC DOB building permits | 10 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 11TH FLOOR (SUITE 1104/1107) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Sep 22, 2026 |
| B | TARGET CORPORATION NYC DOB building permits | 10 | Plumbing · PLUMBING WORK RELATED TO THE LIKE FOR LIKE REPLACEMENT OF (19) EXISTING ROOF TOP UNITS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 22, 2026 |
| B | 711 FIFTH AVENUE PRINCIPAL OWNER NYC DOB building permits | 10 | Sign · INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (OMEGA) No product keyword matched | 5 | Sep 22, 2026 |
| B | CORRIGAN SERVICE CORP NYC DOB building permits | 10 | General Construction · APPLICATION FILED TO COMBINE APTS #616 & #617 TO CREATE LARGER RESIDENTIAL UNIT. REMOVAL OF PARTITION BETWEEN UNTS AND CONVERSION OF #617 KITCHEN TO A WET BAR (NO COOKING). NO CHANGE TO CO REQUIRED PER TPPN #03/97 No product keyword matched | 1 | Sep 22, 2026 |
| B | AMC BUILDERS LLC NYC DOB building permits | 10 | Support of Excavation · SOE WORK AS SHOWN ON PLANS. No product keyword matched | 3 | Sep 22, 2026 |
| B | PRE-SCHOOL NYC DOB building permits | 10 | Plumbing · Exterior Storm Piping No product keyword matched | 2 | Sep 22, 2026 |
| B | ST VINCENTE DEPAUL NURSING HOME NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR 2ND FLR INTERIOR RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 4 | Sep 22, 2026 |