Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AAA TOTAL PLUMBING, INC NYC DOB building permits | 10 | Plumbing · To file PL plumbing work in conjunction with DOB Now Build application job#B01186426. No change in use, egress or occupancy under this application. No product keyword matched | 2 | Sep 23, 2026 |
| B | TRANQUILO MEAT CORP |
| 10 |
Mechanical Systems · MECHANICAL WORK FOR THE EXISTING SUPERMARKET, COMMERCIAL KITCHEN TYPE1 HOOD AND HVAC/ NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched |
| 1 |
| Sep 23, 2026 |
| B | TRADITIONAL WATERPROOFING NYC DOB building permits | 10 | General Construction · PROPOSED FACADE REPAIRS AND ROOF REPLACEMENT AS SHOWN ON THE DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 11 | Sep 23, 2026 |
| B | CRF CONSTRUCTION, INC. NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF SHORING AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 23, 2026 |
| B | SBA NETWORK SERVICES LLC Austin issued construction permits, NYC DOB building permits | 10 | Building Permit · T-Mobile is modifying their equipment at this Rooftop wireless site. Swapping anetnnas radios cabinets. No product keyword matched | 2 | Sep 23, 2026 |
| B | 9443 HOLDING LLC NYC DOB building permits | 10 | Sprinklers · FILE PL & SP WORKTYPE IN CONJUNCTION WITH JOB#Q01223865 No product keyword matched | 1 | Sep 23, 2026 |
| B | ABLE PLBG CO RICHMOND INC NYC DOB building permits | 10 | Plumbing · APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH ALT 2 INTERIOR RENOVATION APPLICATION. No product keyword matched | 1 | Sep 23, 2026 |
| B | 355 REALTY COMPANY NYC DOB building permits | 10 | General Construction · New 20-story building. Building designed under 2022 code. No product keyword matched | 1 | Sep 23, 2026 |
| B | AYAAN RESTORATION INC NYC DOB building permits | 10 | General Construction · Filing for garage repairs work that includes repair of spalled concrete foundation walls, crack repairs, repair of slab wearing surface, etc. as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Sep 23, 2026 |
| B | ZCREW CONSTRUCTION CORP NYC DOB building permits | 10 | Structural · Renovation of a two family dwelling as shown in the plans. No product keyword matched | 4 | Sep 23, 2026 |
| B | A REAL GOOD PLUMBER INC NYC DOB building permits | 10 | Plumbing · FILING HEREWITH PLUMBING WORK FOR THE RENOVATION OF THE LOWER DUPLEX AT THE ADDRESS NOTED. No product keyword matched | 1 | Sep 23, 2026 |
| B | TUNNEL TO TOWERS FOUNDATION NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR EXTERIOR REPAIRS AS PER PLANS. NO CHANGE TO USE, OCCUPANY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 23, 2026 |
| B | HARLEY PLUMB & HEAT INC NYC DOB building permits | 10 | Plumbing · Replacement of existing sanitary, vent, water piping and valves as shown on plans. No change is use or egress. No product keyword matched | 3 | Sep 23, 2026 |
| B | GLOBAL DESIGN CONCEPT COR NYC DOB building permits | 10 | General Construction · NON-STRUCTURAL DEMOLITION & RENOVATION OF APARTMENT 37B ON 37TH FLOOR. GEN. CONSTRUCTION WORK INCLUDES KITCHEN, (2) BATHROOMS, 1 POWDER RM & LAUNDRY CL. MINOR PARTITION WORK AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 23, 2026 |
| B | RJ BRUNO INC NYC DOB building permits | 10 | Plumbing · PL WORK IN APT 12CD FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 23, 2026 |
| B | REAL DEAL DECORATION LLC NYC DOB building permits | 10 | General Construction · THE SCOPE OF WORK IS LIMITED TO INTERIOR FINISH AND FIXTURE UPGRADES IN ALL UNITS. THERE IS NO CHANGE TO EXISTING EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 23, 2026 |
| B | WALKER RIDGE CONST NY LLC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING RETAIL SPACE AS SHOWN ON PLANS FILED HEREWITH, RELATING TO REMOVAL OF EXISTING CONCRETE STEP AND SUPPORT OF PROPOSED HANGING MECHANICAL UNITS. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 3 | Sep 23, 2026 |
| B | WAYFINDER PM LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF PLYWOOD FENCE ENCLOSURE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 4 | Sep 23, 2026 |
| B | FORCE CONSTRUCTION LLC NYC DOB building permits | 10 | Mechanical Systems · interior renovation installation of 4 national comfort condensing units (through wall type)30000 BTU each, and 4 30000 BTU air handlers and related ductwork and plumbing No product keyword matched | 2 | Sep 23, 2026 |
| B | 7TH AND 23RD ASSOCIATES, L.P. NYC DOB building permits | 10 | Mechanical Systems · Interior alteration No product keyword matched | 3 | Sep 23, 2026 |
| B | STORAGE POST NYC DOB building permits | 10 | General Construction · IT IS PROPOSED TO ENLARGE EXISTING BUILDING (HORIZONTAL) BY 20,600 OF EXISTING STORAGE FACILITY. No product keyword matched | 9 | Sep 23, 2026 |
| B | EBEN - EZER FRENCH S.D.A. CHURCH NYC DOB building permits | 10 | Sprinklers · INSTALL NEW SPRINKLER SYSTEM FOR NEW HORIZONTAL ENLARGEMENT 2-STORY COMMERCIAL CHURCH BUILDING SUBSEQUENT WITH A1 JOB#B00997381.NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SPRINKLER DESIGN IS BASED ON THE HYDRAULIC CALCULATION. No product keyword matched | 1 | Sep 23, 2026 |
| B | IOAN SITA NYC DOB building permits | 10 | Plumbing · Herewith filing for plumbing systems for proposed 4-Story, 8-family residential building. Filed in conjunction with new building #321600077. No product keyword matched | 3 | Sep 23, 2026 |
| B | 625 MAD REALTY LLC NYC DOB building permits | 10 | Support of Excavation · SUPPORT OF EXCAVATION FOR THE CONSTRUCTION OF A NEW BUILDING AS PER PLANS FILED HEREWITH. No product keyword matched | 2 | Sep 23, 2026 |
| B | 551 39TH STREET LLC NYC DOB building permits | 10 | Mechanical Systems · Renovation and enlargement of existing single-family residence on floors CEL, 001, and 002. Mechanical work. No product keyword matched | 4 | Sep 23, 2026 |
| B | TOKA HOME, LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. Chipotle; space 0176 No product keyword matched | 2 | Sep 23, 2026 |
| B | KDL CONSTRUCTION & DEVELO NYC DOB building permits | 10 | Mechanical Systems · FILING FOR OBTAINING CERTIFICATE OF COMPLIANCE OF EXISTING A/C. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING No product keyword matched | 1 | Sep 23, 2026 |
| B | D.H. EAGLE PLUMBING, LLC NYC DOB building permits | 10 | Plumbing · Modifications to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Sep 23, 2026 |
| B | PAUL QUINN PLBG & HTG INC NYC DOB building permits | 10 | Plumbing · Plumbing work for a one-family residential building. No change in use, egress, or occupancy. No product keyword matched | 3 | Sep 23, 2026 |
| B | COGEN ELECTRICAL SERVICES INC. NYC DOB building permits | 10 | General Construction · ERECT NEW PREFABRICATED STEEL ACCESSORY SHED ON EXISTING CONCRETE SLAB FILED UNDER X00833026. NO INCREASE TO F.A.R. NO MECHANICAL, PLUMBING, OR ELECTRICAL UTILITIES TO BE ADDED TO SHED. NO FLAMMABLE MATERIALS TO BE STORED IN SHED. No product keyword matched | 1 | Sep 23, 2026 |
| B | 235 EAST 49 STREET TENANTS CORP. NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 23, 2026 |
| B | JCS REALTY NYC DOB building permits | 10 | Full Demolition · Full demolition of the existing building. No product keyword matched | 10 | Sep 23, 2026 |
| B | VENUS CONSTRUCTION NY INC NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION No product keyword matched | 2 | Sep 23, 2026 |
| B | HERTLER NADILE PLBG & HTG NYC DOB building permits | 10 | Construction Fence · ERECT A TEMPORARY WOOD CONSTRUCTION FENCE ON MYRTLE AVENUE & 71st PLACE No product keyword matched | 1 | Sep 23, 2026 |
| B | DIV GRAND MASPETH, LLC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 23, 2026 |
| B | THE KEW-FOREST SCHOOL NYC DOB building permits | 10 | Boiler Equipment · INSTALL TWO GAS FIRED BOILERS. ORIGINALLY FILED UNER Q00634619-S8 WHICH IS TO BE WITHDRAWN. No product keyword matched | 1 | Sep 23, 2026 |
| B | 50 WEST 47TH STREET CONDOMINIUM NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Sep 23, 2026 |
| B | LA MESA VERDE APARTMENTS, LLC NYC DOB building permits | 10 | Structural · Masonry replacement on existing elevator bulkhead. Remove all existing bricks down to the main roof deck and rebuild new masonry as per provide drawings. No change to use, egress, or occupancy. No product keyword matched | 1 | Sep 23, 2026 |
| B | MITCH CONSTRUCTION CORP NYC DOB building permits | 10 | Full Demolition · Full demolition of existing 1-story structure. No product keyword matched | 2 | Sep 23, 2026 |
| B | Teachers College NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 9 | Sep 23, 2026 |
| B | DM80 SOLUTIONS LLC NYC DOB building permits | 10 | General Construction · Interior demolition of existing church and parish house. No product keyword matched | 3 | Sep 23, 2026 |
| B | MHR LALIA CONSTRUCTION CORPARTION NYC DOB building permits | 10 | Mechanical Systems · NEW SEMI-DETACHED 2 STORIES 2-FAMILY RESIDENCE WITH CELLAR No product keyword matched | 1 | Sep 23, 2026 |
| B | ROBINSON INVESTMENT GROUP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION ON APARTMENT 4E ON 4TH FLOOR INCLUDING NON-STRUCTURAL DEMOLITION AND INSTALLATION OF INTERIOR WALLS AND FINISHES AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Sep 23, 2026 |
| B | YABOO FENCE CO., INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 1 | Sep 23, 2026 |
| B | SEASONED HOME IMPROVEMEN* NYC DOB building permits | 10 | General Construction · new bathroom on the first floor No product keyword matched | 2 | Sep 23, 2026 |
| B | Avison Young NYC DOB building permits | 10 | Sprinklers · HEREWITH FILING MODIFICATION TO EXISTING SPRINKLER SYSTEM FILED IN CONJUNCTION WITH INTERIOR DEMO OF RETAIL /COMMERCIAL SPACE, AS SHOWN ON PLANS FILED.TO INCLUDE DEMO OF EXISTING, RELOCATION, NEW INSTALLATION OF SPRINKLER HEADS ON ASSOCIATED PIPING No product keyword matched | 1 | Sep 23, 2026 |
| B | ORCHID HOMES INC NYC DOB building permits | 10 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE FOR ALT-2 JOB FILED UNDER DOB # B01306775-I1 No product keyword matched | 4 | Sep 23, 2026 |
| B | AHTRAM SERVICES CORP NYC DOB building permits | 10 | General Construction · Propose to renovate existing residence as per plans filed herewith. No change in use egress or occupancy is proposed under this application. No product keyword matched | 1 | Sep 23, 2026 |
| B | THE COSMOPOLITAN CLUB NYC DOB building permits | 10 | Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 23, 2026 |
| B | MESEROLE STUDIOS LLC NYC DOB building permits | 10 | Mechanical Systems · Design Changes due to new layout No product keyword matched | 1 | Sep 23, 2026 |