Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | GREEN JJ MANAGEMENT INC NYC DOB building permits | 10 | Structural · TO ADD SECOND FLOOR ON TOP OF EXISTING ONE FAMILY DWELLING AS PER PLAN AND OBTAIN A NEW C. OF O. No product keyword matched | 1 | Sep 24, 2026 |
| B | FSR NYC DOB building permits | 10 |
Plumbing · Renovation of existing Apartment#10A. Installation of new bathroom and kitchen fixtures. No change of, use, egress or occupancy under this application. No product keyword matched |
| 1 |
| Sep 24, 2026 |
| B | RXR PO OWNER LLC NYC DOB building permits | 10 | General Construction · Interior demolition and installation of non-bearing partitions, doors and finishes related to tenant fit out. No change in use, egress or occupancy. No product keyword matched | 10 | Sep 24, 2026 |
| B | NGKF NYC DOB building permits | 10 | Structural · SIDEWALK VAULT REPAIR AS PER THE PLANS FILED HEREWITH. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 24, 2026 |
| B | 6907 REALTY LLC NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING ONE STORY GARAGE AT REAR YARD. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 24, 2026 |
| B | ARDE NYC INCORPORATED NYC DOB building permits | 10 | General Construction · INTERIOR, NON-STRUCTURAL DEMOLITION OF EXISTING 2-FAMILY DWELLING FILED IN CONJUNCTION WITH ALTCO JOB NO. B01001873 INCLUDING REMOVAL OF FENCE. NO CHANGE TO ZONING, USE, OR EGRESS No product keyword matched | 3 | Sep 24, 2026 |
| B | FIRST CLASS MANAGEMENT NYC DOB building permits | 10 | Mechanical Systems · Interior fitout and alteration of existing commercial unit to new office space. No product keyword matched | 1 | Sep 24, 2026 |
| B | CS RENOVATION INC NYC DOB building permits | 10 | Construction Fence · INSTALL 8' TEMPORARY CONSTRUCTION FENCE AT THE ABOVE ADDRESS No product keyword matched | 2 | Sep 24, 2026 |
| B | BABA CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · All work for the combination of apt 7K & 7L was done under ALT1 101485322. This application is superseding ALT1 101485322, as a refiling of an alt 2 as per TPPN 3/97 only. Note: PLUMBING was SIGNED OFF on 09/24/1997 under the ALT1 application. No product keyword matched | 3 | Sep 24, 2026 |
| B | A.R.L. PLUMBING & HTG LLC NYC DOB building permits | 10 | Plumbing · INSTALL WATER HEATER AND NEW GAS METER AND GAS PIPING. No product keyword matched | 1 | Sep 24, 2026 |
| B | MZS REALTY NYC DOB building permits | 10 | General Construction · APPLICATION FILED HEREWITH TO VERTICALLY ENLARGE EXISTING TWO STORY + BASEMENT & ATTIC RESIDENTIAL BUILDING. BUILDING TO BE CONVERTED INTO A FOUR STORY + PENTHOUSE TWELVE FAMILY BUILDING No product keyword matched | 4 | Sep 24, 2026 |
| B | JEFFERIES NYC DOB building permits | 10 | General Construction · RESIDENTIAL RENOVATION INCLUDING A HORIZONTAL AND VERTICAL ENLARGEMENT OF AN EXISTING FOUR FAMILY TOWNHOUSE INTO A SINGLE FAMILY TOWNHOUSE. NEW CO TO BE OBTAINED. No product keyword matched | 2 | Sep 24, 2026 |
| B | 315 HUDSON LLC NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FROM THE SOURCE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 24, 2026 |
| B | GS CONSTRUCTION GROUP INC NYC DOB building permits | 10 | General Construction · Herewith filing for hatch installation at both levels in roof bulkhead. No change to use, occupancy or egress. No product keyword matched | 5 | Sep 24, 2026 |
| B | COMPLETE PLBG SAFETY LLC NYC DOB building permits | 10 | Plumbing · Filling herewith plumbing modifications to the existing system as per plans. No change to use, egress or occupancy. No product keyword matched | 2 | Sep 24, 2026 |
| B | YOUNG MINDS IN MOTION USA, INC. NYC DOB building permits | 10 | General Construction · minor interior layout change on 1st floor 552, update language on certificate of occupancy No product keyword matched | 1 | Sep 24, 2026 |
| B | BROOKLYN NORTH CAPITAL NYC DOB building permits | 10 | General Construction · proposed 4 story 4 dwelling new building with cellar No product keyword matched | 11 | Sep 24, 2026 |
| B | ARCHLINK DESIGN CORP NYC DOB building permits | 10 | Mechanical Systems · HEREWITH TO PROPOSE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS INCLUDING AIR HANDLING UNITS, CONDENSING UNITS. ASSOCIATED DUCTWORK ,PIPING AND EXHAUST SYSTEMS No product keyword matched | 4 | Sep 24, 2026 |
| B | ODYSSIA GLOBAL COMMUNICATIONS, CORP NYC DOB building permits | 10 | Structural · Structural work in conjunction with architectural design Q00627252-I1 No product keyword matched | 6 | Sep 24, 2026 |
| B | BUILDING CODE PARTNERS IN NYC DOB building permits | 10 | Mechanical Systems · Filing Mechanical modifications to apartment 15C associated with interior renovations as per plans. Related Architectural #M01366576-I1 and plumbing #M01366576-S2. No product keyword matched | 5 | Sep 24, 2026 |
| B | FIREQUEST CORP NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF SPRINKLER COVERAGE FOR THIRD FLOOR, AND STAIRWAY FOR 1,2,3,4 AND 5 FLOORS. FILING RELATED TO THE CHANGE OF USE IN THE THIRD FLOOR FROM OFFICE TO RESIDENTIAL. No product keyword matched | 3 | Sep 24, 2026 |
| B | TOP BUILD CONTRACTORS INC NYC DOB building permits | 10 | General Construction · INTERIOR DEMOLITION ON EXISTING ONE STORY FACTORY AND INDUSTRIAL BUILDING WITH CELLAR.NO CHANGE OF BUILDING BULK,OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 24, 2026 |
| B | THE BURROWNYC LLC NYC DOB building permits | 10 | Foundation · STRUCTURAL WORK INCLUDING: MODIFICATIONS TO CHIMNEY BREASTS AND HEARTHS, CONSTRUCTION OF NEW STAIR BULKHEAD, PENTHOUSE AND MEZZANINE LOFT AREA. NEW ROOF DECK FOR EXISTING MAIN ROOF LEVEL. NEW STEEL DECK AT 1ST FLOOR, ENLARGE MASONRY OPENINGS. No product keyword matched | 1 | Sep 24, 2026 |
| B | GROVE PAD TRUST NYC DOB building permits | 10 | Sprinklers · Plumbing and sprinkler work in conjunction with renovation of one-family dwelling. New plumbing fixtures & sprinklers throughout building. No product keyword matched | 1 | Sep 24, 2026 |
| B | CONKLIN HMES LLC NYC DOB building permits | 10 | Plumbing · Plumbing application for Q01172295-I1 No product keyword matched | 2 | Sep 24, 2026 |
| B | NADINE FOOD CORP NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE. THIS APPLICATION IS FILED IN CONJUNCTION WITH JOB # 400487488. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 24, 2026 |
| B | OCEAN WAY 3 NYC DOB building permits | 10 | Plumbing · FILING HEREWITH UNDERGROUND PLUMBING WORK AS PER PLANS IN CONJUNCTION WITH NEW BUILDING. No product keyword matched | 1 | Sep 24, 2026 |
| B | J S REMODELING NY INC NYC DOB building permits | 10 | Structural · INSTALL NEW STEEL BEAM AND COLUMNS WITH ASSOCIATED FOOTINGS TO REINFORCE THE EXISTING 1ST FLOOR WOOD FRAMING. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 5 | Sep 24, 2026 |
| B | SOFIA CONDOMINIUM NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Sep 24, 2026 |
| B | NEHMER NYC DOB building permits | 10 | Plumbing · PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF THE HOTEL. No product keyword matched | 3 | Sep 24, 2026 |
| B | MDJ REALTY GROUP, LLC NYC DOB building permits | 10 | Suspended Scaffold · Temporary equipment, roof top outriggers and suspended rigid scaffold platform (rope block and tackle) therefrom, as worker access for scope to paint building street facing facade. No product keyword matched | 1 | Sep 24, 2026 |
| B | SEAFARERS INTERNATIONAL HOUSE NYC DOB building permits | 10 | General Construction · JOB ACCEPTED TO CDU ON 5/7/25. FILING FOR CHANGE OF OCCUPANCY FROM J-3 RECTORY TO J-1 (R-1) ROOMING UNITS AS PERMITTED BY HMC 27-2077. INTERIOR RENOVATIONS ON FLOORS SUB, CEL, MEZ, 01-05, ROF. NO CHANGE TO USE, BULK OR EGRESS. No product keyword matched | 2 | Sep 24, 2026 |
| B | URBAN GREEN NYC DOB building permits | 10 | Solar · Installation of PV System on existing roof top. No changes to the use egress or occupancy. No product keyword matched | 1 | Sep 24, 2026 |
| B | IVENKO INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION IN 5B FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Sep 24, 2026 |
| B | NYC HHC NYC DOB building permits | 10 | General Construction · Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress. No product keyword matched | 3 | Sep 24, 2026 |
| B | ELITE QUALITY CONSTRUCTIO NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS. No product keyword matched | 1 | Sep 24, 2026 |
| B | Bealin Groups Corp NYC DOB building permits | 10 | General Construction · FILE TO PROPOSED NEW 1 -CAR PARKING GARAGE AT REAR YARD OF AN EXISTING 1-FAMILY DWELLING UNIT BUILDING, OBTAIN NEW C OF O. No product keyword matched | 1 | Sep 24, 2026 |
| B | RESIDENZA483 NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 24, 2026 |
| B | OWNER REPRESENTATIVE NYC DOB building permits | 10 | Plumbing · Relocated plumbing fixtures for existing kitchen. No product keyword matched | 2 | Sep 24, 2026 |
| B | CROWN 286 4TH AVENUE LLC NYC DOB building permits | 10 | General Construction · Proposed four (4) story + cellar residential use building. No product keyword matched | 4 | Sep 24, 2026 |
| B | Centurion Realty LLC NYC DOB building permits | 10 | Plumbing · MODIFICATION TO THE EXISTING PLUMBING SYSTEM ON THE 4TH FLOOR. NO CHANGE IN OCCUPANCY, USE R EGRESS. No product keyword matched | 2 | Sep 24, 2026 |
| B | Bez Equities NYC DOB building permits | 10 | General Construction · PROPOSED NEW FIVE STORY RESIDENTIAL BUILDING. No product keyword matched | 1 | Sep 24, 2026 |
| B | 207-217 WEST 110 PORTFOLIO OWNER LL NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER DRAWINGS. No product keyword matched | 2 | Sep 24, 2026 |
| B | BROOKLYN COMMUNITY SERVICES NYC DOB building permits | 10 | General Construction · interior renovation of existing retail B space at 1611 Surf Avenue Brooklyn NY, installation of new acoustical tile drop ceiling, misc. gypsum board soffits lighting and electrical as per plans. no change in egress occupancy or use under this application No product keyword matched | 1 | Sep 24, 2026 |
| B | CENTERS HEALTH CARE NYC DOB building permits | 10 | General Construction · INSTALL OXYGEN MANIFOLD AT LOADING DOCK AND PIPED OXYGEN TO RESIDENT ROOM HEADWALLS ON THE SECOND FLOOR.NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Sep 24, 2026 |
| B | STENCO CONSTRUCTION INC NYC DOB building permits | 10 | Construction Fence · TEMPORARY CONSTRUCTION FENCE FOR THE FULL DEMOLITION No product keyword matched | 2 | Sep 24, 2026 |
| B | HAKIMIAN NYC DOB building permits | 10 | General Construction · BATHROOM FIT-OUT OF THE 1ST FLOOR COMMERCIAL SPACE SHOWN ON THE FLOOR PLANS. OCCUPANCY LOAD AND EGRESS TRAVEL IS REFLECTED/ FIELD UNDER THE NB APPLICATION #420666283. NO CHANGE TO OCCUPANCY, USE, AND EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 24, 2026 |
| B | E-GROUP INC NYC DOB building permits | 10 | Mechanical Systems · NEW MECHANICAL UNITS INSTALLED AT EXISTING FIRST FLOOR ROOF FOR FUTURE TENANT FIT-OUT OFFIRST FLOOR RETAIL SPACE. NO CAHNGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 24, 2026 |
| B | RXR 590 MADISON OWNER LLC NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK TAKING PLACE ON THE 30TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Sep 24, 2026 |
| B | NIKPRELA CONSTRUCTION COR NYC DOB building permits | 10 | General Construction · ALTERATION - INTERIOR RENOVATION OF A ONE BEDROOM, TWO BATHROOM DWELLING UNIT TO CREATE A TWO BEDROOM, THREE BATHROOM DWELLING UNIT. NO CHANGE TO OCCUPANCY, OR EGRESS REQUIRED. No product keyword matched | 1 | Sep 24, 2026 |