Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SNG BRICK AND STONE INC NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF TEMPORARY EASY SCALE PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 2, 2026 |
| B | BUILDING DESIGN &CONSULTANCY INC NYC DOB building permits |
| 10 |
General Construction · Interior renovations to the first floor, including the replacement of all window lintels with new ones. Minor facade work.. See attached Certificate of Occupancy Under Application # 2302218 No product keyword matched |
| 1 |
| Oct 2, 2026 |
| B | VALVERDE LLC NYC DOB building permits | 10 | Plumbing · APPLICATION TO INSTALL SPRINKLER SYSTEM FOR EXISTING RESIDENTIAL BUILDING. No product keyword matched | 1 | Oct 2, 2026 |
| B | Z J CONTRACTING & RESTORA NYC DOB building permits | 10 | General Construction · Exterior repair of the front wall. Install missing panel and secure panel for entire wall. No change in use, egress and occupancy. No product keyword matched | 1 | Oct 2, 2026 |
| B | FISHER INSTALLATIONS INC NYC DOB building permits | 10 | Construction Fence · New 8' high plywood temporary construction fence located so as to fully enclose the area of work - inside property lines. No product keyword matched | 1 | Oct 2, 2026 |
| B | AGI SEWER & DRAINS, INC NYC DOB building permits | 10 | Plumbing · Installation of new Commercial Gas Cooking equipment and Hand wash sink No product keyword matched | 1 | Oct 2, 2026 |
| B | U-CONTROL ENERGY SOLUTION NYC DOB building permits | 10 | Mechanical Systems · Propose mechanical modifications at existing 001 floor commercial space all as per plans herewith filed. No product keyword matched | 1 | Oct 2, 2026 |
| B | Saul Development LLC NYC DOB building permits | 10 | General Construction · NEW 4 STORY BUILDING WITH CELLAR AND PENTHOUSE FOR 8 RESIDENTIAL DWELLING UNITS. No product keyword matched | 1 | Oct 2, 2026 |
| B | F A M BUILDERS LLC NYC DOB building permits | 10 | General Construction · MINOR INTERIOR RENOVATION ONLY ( PARTITIONS, DOORS, RELOCATING & ADDING PLUBMING FIXTURES ). No product keyword matched | 4 | Oct 2, 2026 |
| B | CAFE Y ALGO MAS NYC DOB building permits | 10 | Plumbing · A.INSTALL GAS ON EXISTING SERVICE FOR THE NEW KITCHEN EQUIPMENT & FURNACE ON FIRST FLOOR, AND HW TANK ON CELLAR. REMOVE EXISTING BATHROOM NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 2, 2026 |
| B | SUNNYHILL NYC DOB building permits | 10 | General Construction · Facade and leak repairs as per plans; no change in egress, use, or occupancy. No product keyword matched | 3 | Oct 2, 2026 |
| B | 1757 TJM FOOD CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION ON EXISTING SUPERMARKET TO REMEDY OPEN VIOLATION #34432861M. RELOCATED EXISTING KITCHEN AREA & EXISTING S/S HOOD & EXHAUST DUCT; REMOVED EXISTING CMU WALL; CREATE NEW FISH MARKET AND THREE NEW WALKING BOX.NO OTHER WORK TO BE DONE. No product keyword matched | 2 | Oct 2, 2026 |
| B | SKYVIEW DEVELOPERS GROUP NYC DOB building permits | 10 | General Construction · Exterior repairs project to comply with LL11/98. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 2, 2026 |
| B | ALNAYA BUILDERS INC NYC DOB building permits | 10 | General Construction · PROPOSED NEW 3-STORY PLUS BASEMENT 2-DWELLING UNIT BUILDING No product keyword matched | 2 | Oct 2, 2026 |
| B | VERTCON BUILDERS LLC NYC DOB building permits | 10 | Support of Excavation · Support of Excavation (SOE) work as per plans filed No product keyword matched | 1 | Oct 2, 2026 |
| B | Chhaya Community Development Corpor NYC DOB building permits | 10 | Plumbing · RELATED PLUMBING WORK OF THE CONVERSION OF EXISTING 3-STORY & CELLAR MIXED-USE BUILDING(COMMUNITY FACILITY AND RESIDENTIAL)INTO A SINGLE-TENANT COMMUNITY FACILITY USE. PERFORM INTERIOR RENOVATIONS AS PER PLAN. OBTAINNEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 6 | Oct 2, 2026 |
| B | MORNINGSIDE PARK CONDO, NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold for inspection & work. No product keyword matched | 1 | Oct 2, 2026 |
| B | TEC BUILDING CONSULTANTS INC NYC DOB building permits | 10 | General Construction · RENOVATION WORK LOBBY STOREFRONT AND INTERIOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 2, 2026 |
| B | Super 8 Painting Inc NYC DOB building permits | 10 | Plumbing · Plumbing work to address ECB violations on the existing one family house. (VIOLATION NUMBERS:39155829L, 39155828J, 39155827H, AND 39155826X). No change in use, occupancy, or egress is involved under this application. No product keyword matched | 2 | Oct 2, 2026 |
| B | NEWTOWN GASTROENTEROLOGY PC NYC DOB building permits | 10 | Mechanical Systems · ROPOSED MECHANICAL WORK TYPE FOR NEW MEDICAL OFFICE, LOCATED AT 3RD FLOOR UNIT A. NO CHANGE IN USE, OCCUPANCY AND EGRESS No product keyword matched | 3 | Oct 2, 2026 |
| B | C AND A PROPERTIES LLC NYC DOB building permits | 10 | Structural · Structural work related to the renovation/conversion of existing residential building to a 1 family residence. No product keyword matched | 2 | Oct 2, 2026 |
| B | KYMECH INDUSTRIES INC. NYC DOB building permits | 10 | Plumbing · Filing plumbing and sprinkler work as per plans No product keyword matched | 4 | Oct 2, 2026 |
| B | HOK SAN REALTY CORP. NYC DOB building permits | 10 | Plumbing · FILED HEREWITH FOR PLUMBING WORK TYPE FOR EXISTING GONGCHA REMODEL. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 2 | Oct 2, 2026 |
| B | HARTY BUILT, LLC NYC DOB building permits | 10 | General Construction · APPLICATION IS FILED FOR INTERIOR ALTERATION TO EXISTING APARTMENT ON THE 2ND FLOOR. WORK INCLUDES REMOVAL AND REPLACEMENT OF INTERIOR FINISHES AND PARTITIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 2, 2026 |
| B | PC RICHARD AND SON NYC DOB building permits | 10 | Sprinklers · MODIFY EXISTING SPRINKLER SYSTEM IN CELLAR AND FIRST FLOOR AS PER PLANS. REFILING OF DOB# 420476210, AS INSTRUCTED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 2, 2026 |
| B | TBI SOLUTIONS LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION 1ST FLOOR COMMERCIAL SPACE NEW PARTITIONS, REPLACE MRI EQUIPMENT, AND REPLACE AND RELOCATE BATHROOM PLUMBING FIXTURES. NO CHANGE TO USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 2, 2026 |
| B | Aurora capital NYC DOB building permits | 10 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN REPLACING PERMITTED JOB X00007663. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 2, 2026 |
| B | albert einstein college of medicine NYC DOB building permits | 10 | Solar · Installation of solar panels, rooftop, grid tied, railed, 8 modules, 3.28 KW No product keyword matched | 1 | Oct 2, 2026 |
| B | COMBUSTION THEORY LLC NYC DOB building permits | 10 | Mechanical Systems · PROVIDE NEW MECHANICAL SYSTEM FOR 4-STORY BUILDING No product keyword matched | 1 | Oct 2, 2026 |
| B | 9111 CHURCH LLC NYC DOB building permits | 10 | General Construction · FILING FOR FACADE REPAIR FOR FLOORS 001-004 AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 1 | Oct 2, 2026 |
| B | OHR AVNER FOUNDATION INC NYC DOB building permits | 10 | Mechanical Systems · Filing herewith for installation of HVAC equipment No product keyword matched | 1 | Oct 2, 2026 |
| B | PRESTIGIOUS MAINTENANCE I NYC DOB building permits | 10 | Mechanical Systems · Filing application for kitchen exhaust system installed on south facade and roof. Work on facade is partly over air space of 913 Broadway. Associated application also being filed at 913 Broadway for installation of these mechanical flues (M01197412-I1) No product keyword matched | 1 | Oct 2, 2026 |
| B | TITAN RESTORATION INC NYC DOB building permits | 10 | Structural · emergency temporary shoring to cracked stone column at building portico entrance as per plans filed herewith. no change to use, egress or occupancy. No product keyword matched | 1 | Oct 2, 2026 |
| B | 102-01 NYC DOB building permits | 10 | General Construction · MINOR INTERIOR WORK TO RENOVATE EXISTING COMMERCIAL SPACE TO PROPOSE A DELI & GROCERY STORE @ 1ST FL CORNER SPACE; WORK TO INCLUDE THE INSTALLATION OF A COMMERCIAL HOOD, MILLWORK, AND INTERIOR FINISHES THROUGHOUT THE SPACE ONLY AS PER PLANS. No product keyword matched | 1 | Oct 2, 2026 |
| B | JJ INNOVATIVE CORP NYC DOB building permits | 10 | General Construction · NEW TENANT FIT-OUT AT RETAIL SPACE (NAIL SHOP) AT 1ST FLOOR. WORK INCLUDES INSTALLATION OF NON-BEARING PARTITONS FOR NEW SERVICE AREA (MANICAUE & PEDICURE) AND VENTILATION SYSTEM AS PER THE PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCUPANCY UNDER JOB. No product keyword matched | 1 | Oct 2, 2026 |
| B | TROPICAL AIRE LLC NYC DOB building permits | 10 | Mechanical Systems · HVAC Mini Split system on office space suite# 1B. No product keyword matched | 1 | Oct 2, 2026 |
| B | Jackmill construction co NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION EXIST. 2-STORY, 1-FAMILY BUILDING. WORK TO COMPLETE INTERIOR REMOVALS & NEW LAYOUT, INSTALL NEW PARTITIONS, FINISHES, PLUMBING, MECHANICAL, & ELECTRICAL SYSTEMS AS PER PLANS FILED HEREWITH, NO CHANGE OF EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 2, 2026 |
| B | 33-01 HUNTERSPOINT ASSOCIATES LLC NYC DOB building permits | 10 | General Construction · INSTALLATION OF NEW SPLIT HVAC SYSTEM AS SHOWN ON PLANS. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 1 | Oct 2, 2026 |
| B | GOTHAM COMMUNICATIONS LLC NYC DOB building permits | 10 | Antenna · T-Mobile modification - Replace 2 antennas on the facade. Remove 2 RRU's and install 3 RRU's in equipment room in basement. Remove 2 existing cabinets in equipment room in basement. Replace 1 rack in equipment room in basement. No product keyword matched | 1 | Oct 2, 2026 |
| B | NOCHES DE BRASIL RESTAURANT NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION IN EXISTING STORE (U.G.6) FOR NEW EATING & DRINKING ESTABLISHMENT. NO CHANGE OF USE OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 2, 2026 |
| B | PERRONE LLC NYC DOB building permits | 10 | Mechanical Systems · Renovation of existing commercial space to install new hood system and new ductwork system, etc. No product keyword matched | 2 | Oct 2, 2026 |
| B | VICTORY MANOR LLC NYC DOB building permits | 10 | Mechanical Systems · APPLICATION IS FILED FOR THE ADDITION OF THREE MECHANICAL UNITS TO AN EXISTING COMMERCIAL SPACE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION. NO NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Oct 2, 2026 |
| B | BallroomBarks Inc -Bargo Properties NYC DOB building permits | 10 | General Construction · REPLACEMENT OF THE CHIMNEY AT THE ROOF LEVEL ONLY INCLUDING MINOR MASONRY WORK, LINER REPLACEMENT, WITH ASSOCIATED MECHANICAL AND STRUCTURAL WORK. THE EXISTING MEMBRANE ON THE ROOF FLOOR IS TO REMAIN. NO CHANGE TO THE USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 2, 2026 |
| B | ALL AMERICAN STONEWORK * NYC DOB building permits | 10 | General Construction · INSTALL ON-SITE STORMWATER RETENTION SYSTEM ANDSTORMWATER INFRASTRUCTURE No product keyword matched | 1 | Oct 2, 2026 |
| B | CITYONE ELECTRICAL CORP NYC DOB electrical permits | 10 | Wiring for power, light with new panels, sub feeds as per plans No product keyword matched | 2 | Oct 2, 2026 |
| B | E-J ELEC. INSTALLATION CO NYC DOB electrical permits | 10 | 260378 - Electrical Fit Out of Con Ed Storage Building - DA No product keyword matched | 5 | Oct 2, 2026 |
| B | OHM'S ELECTRICAL CORP NYC DOB electrical permits | 10 | Electrical Work in Apartment 9D No product keyword matched | 1 | Oct 2, 2026 |
| B | USIS ELECTRIC INC NYC DOB electrical permits | 10 | Replace light fixtures inside dining area and bathrooms of restaurant. Relocate menu boards No product keyword matched | 3 | Oct 2, 2026 |
| B | RAMDEEN'S ELEC. CONTR.COR NYC DOB electrical permits | 10 | Additional Branch Wiring- This Permits is to Supersede and close Previous Permit #M00430942-I1-EL No product keyword matched | 1 | Oct 2, 2026 |
| B | ENLIGHTED ELECTRICAL SERV NYC DOB electrical permits | 10 | Closing abandoned work permit A205534. No product keyword matched | 2 | Oct 2, 2026 |