Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | FANGZHENGCON NYC DOB building permits | 10 | Mechanical Systems · INTERIOR RENOVATION WITH REPAIRING PARTITION, CEILING. AND OVERLAY NEW FLOOR OVER EXIST. FLOORING. EXTERIOR WORK FOR NEW REAR DECK AND STAIR. AND MECHANICAL WORK FOR INSTALL AC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS. No product keyword matched | 1 | Oct 5, 2026 |
| B |
| CREPAS LLC NYC DOB building permits |
| 10 |
General Construction · Replace three (3) steel window lintels facing the street, and repoint facade cracks as necessary. No change in use, egress, or occupancy. No product keyword matched |
| 2 |
| Oct 5, 2026 |
| B | MALAYIL REALTY INC. NYC DOB building permits | 10 | Plumbing · New installation of new gas fired combo HWH & boiler for dwelling unit. New 2 piece bathroom and electric HWH in converted office. Relocate existing kitchen sink, dishwasher, gas stove along with relocating existing lavatory, toilet and bathtub. No product keyword matched | 1 | Oct 5, 2026 |
| B | DEGA CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · CONSTRUCT HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING HOUSE. CONVERT TO 2-FAMILY DWELLING. No product keyword matched | 1 | Oct 5, 2026 |
| B | BLUE DEER LLC NYC DOB building permits | 10 | Mechanical Systems · Mechanical units associated with renovation. No product keyword matched | 3 | Oct 5, 2026 |
| B | ADVANCE DIRECT US INC NYC DOB building permits | 10 | General Construction · PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 2 STORY & BASMENT 2 UNIT, INTO A 8 UNIT RESIDENTIAL BUILDING. NO CHANGE IN BULK, OR EGRESS. No product keyword matched | 1 | Oct 5, 2026 |
| B | COUNTRYWIDE HOME IMPROVEM NYC DOB building permits | 10 | General Construction · Renovation of cellar for accessory workshop to Jewelry store above. Install exhaust system to roof. No product keyword matched | 1 | Oct 5, 2026 |
| B | SIX BROTHERS REALTY CORP NYC DOB building permits | 10 | Plumbing · Replace existing burner in existing 787MBH imput boiler. Install 3LF new gas supply to the burner. No change to the BTU rating. No vessel work. Refiling of an approved job 321061934. No change in use, egreess or occupancy No product keyword matched | 1 | Oct 5, 2026 |
| B | QUALITY G BUILDERS INC NYC DOB building permits | 10 | General Construction · RENOVATE EXISTING RESTAURANT ON 1ST FLOOR AS PER CO# 100493. INSTALL MINOR PARTITIONS, BATHROOMS, KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, & HVAC SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | JY3S REALTY LLC. NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF OFFICE (UG 6) AT 1ST FLOOR. WORK INCLUDES REMOVAL/INSTALLATION OF NON-BEARING PARTITIONS, CEILING & LIGHTING, MISC. CARPENTRY WORK AND NEW A/C UNITS AS PER THE PLAN HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS JOB. No product keyword matched | 1 | Oct 5, 2026 |
| B | PRELA AUTO REPAIR LLC NYC DOB building permits | 10 | General Construction · Extend term of approved BSA variance (Cal. No. 724-56-BZIV) under ZR 11-411 and perform limited interior alterations and code-compliance work related to issuance of a new Certificate of Occupancy for an existing auto repair shop (UG 16B). No change to use No product keyword matched | 1 | Oct 5, 2026 |
| B | BROTHER K INC NYC DOB building permits | 10 | General Construction · Interior alterations to apt#4H. No change of use, egress or occupancy under this application. No product keyword matched | 1 | Oct 5, 2026 |
| B | RALPH AIEVOLI & SON INC. NYC DOB building permits | 10 | General Construction · Facade Repair No product keyword matched | 1 | Oct 5, 2026 |
| B | TRICE RESTORATION INC NYC DOB building permits | 10 | General Construction · Brick replacement, mortar repointing, and other related work at west elevation facade. No product keyword matched | 1 | Oct 5, 2026 |
| B | GOLDSTAR CONSTR & DEV NYC DOB building permits | 10 | General Construction · FILING FOR MINOR INTERIOR RENOVATION LEGALIZE CELLAR THREE (3) PIECE BATHROOM. REMOVE CELLAR ILLEGAL PARTITIONS TO RESOLVE ECB VIOLATION 34641141P. NEW STORAGE PARTITION WALLS, NEW FINISH FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | SREP 10TH AVENUE PARTNERS LLC NYC DOB building permits | 10 | General Construction · Divide existing commercial space into two tenant spaces, alter storefront to provide entrance to newly demised tenant space. No product keyword matched | 1 | Oct 5, 2026 |
| B | NEW BASIC CONSTRUCTION NYC DOB building permits | 10 | General Construction · FILE APPLICATION TO REMOVE ILLEGAL DWELLING UNIT IN CELLAR AND RESTORE TO PRIOR LEGAL CONDITION IN ORDER TO CURE ECB VIOLATION #39195080P, #39195082Z, AND #39195083K. PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 5, 2026 |
| B | ONE HUNDRED GRAND INC NYC DOB building permits | 10 | General Construction · INTERIOR ALTERATION OF EXISTING RETAIL SPACE No product keyword matched | 1 | Oct 5, 2026 |
| B | 174 MOTT OWNER LLC NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY SIGN ON EXISTING MARQUEE - 368 ALLEYCORP 368. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | TREETOP DEVEOPMENT, LLC NYC DOB building permits | 10 | General Construction · PARKING GARAGE REPAIR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 5, 2026 |
| B | NY Property Holdings I LLC NYC DOB building permits | 10 | Construction Fence · Propose construction fence around property line perimeter. No product keyword matched | 1 | Oct 5, 2026 |
| B | Prpenterprisesinc@gmail.com NYC DOB building permits | 10 | Solar · FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | UNITED COMMUNITY BAPTIST CHURCH NYC DOB building permits | 10 | General Construction · Replace interior water damage walls. Replace kitchen equipment. No product keyword matched | 1 | Oct 5, 2026 |
| B | GOLDEN WORKS CORP NYC DOB building permits | 10 | General Construction · interior renovation and combination of apartments per TPPN 03/97. No change to use, egress, or occupancy No product keyword matched | 1 | Oct 5, 2026 |
| B | S P Q R TINARELLI LLC NYC DOB building permits | 10 | Construction Fence · Proposed construction fence filed in conjunction with alteration no. Q00970024 No product keyword matched | 1 | Oct 5, 2026 |
| B | EASTERN AIR INC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work in conjunction with NB # M01128646 No product keyword matched | 1 | Oct 5, 2026 |
| B | JAMAICA STATE REALTY LLC NYC DOB building permits | 10 | Construction Fence · Proposing a construction fence 3 feet away from the facade of the building. No product keyword matched | 1 | Oct 5, 2026 |
| B | AJT PROPERTIES NYC DOB building permits | 10 | Mechanical Systems · Installation of (23) condensing units mounted on masonry parapet wall at 1st story Roof level. No product keyword matched | 1 | Oct 5, 2026 |
| B | Gateway Properties L.P. NYC DOB building permits | 10 | General Construction · Filing for minor partition work at existing office space. No change in use,egress or occupancy. No product keyword matched | 1 | Oct 5, 2026 |
| B | ETHELIND COBLIN ARCHITECT NYC DOB building permits | 10 | General Construction · INTERIOR WORK AT 2ND FLR DWELLING. REPLACE NONLOAD BEARING WALLS BY STAIR WITH CURB/SCREEN WALL. REMOVE FINISHES IN BATH. PARTITION WORK FOR RECONFIGURATION. REMOVE ENTRY CANOPY/POSTS &REPLACE W NEW CANOPY ANCHORED TO FACADE. REPLACE DRIVEWAY&ENTRY PAVERS No product keyword matched | 1 | Oct 5, 2026 |
| B | NEUTECH CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · TO LEGALIZE STRUCTURAL ALTERATION OF BASEMENT ENTRY. NEW WALL BUILT FORWARD OF OLD ENTRY DOOR, MADE FLUSH WITH FRONT FACADE. DOWNWARD PITCHED DRIVEWAY NOW FLAT WITH STAIRS DOWN TO ENTRY DOOR. No product keyword matched | 1 | Oct 5, 2026 |
| B | J&H ELECTRICAL CONT INC NYC DOB electrical permits | 10 | Electrical Temp Permit No product keyword matched | 5 | Oct 5, 2026 |
| B | BLAZE ELECTRIC INC. NYC DOB electrical permits | 10 | Install wiring for two HVAC units outside. One unit located on the roof. Cellar and Outside No product keyword matched | 4 | Oct 5, 2026 |
| B | SAMMY ELECTRICAL CORP NYC DOB electrical permits | 10 | Partial re-wire first floor only. No product keyword matched | 1 | Oct 5, 2026 |
| B | JEMCO ELECT. CONTRS INC NYC DOB electrical permits | 10 | Red Hook West Bldg. 25 - CCTV No product keyword matched | 16 | Oct 5, 2026 |
| B | ORPHEOUS ELECTRICAL INC NYC DOB electrical permits | 10 | Reinstate BIS electrical application B289127 to inspect and close out permitted whole-building rewireing at the basement and first floor, including service work, feeder conductors, a single-phase panel, and one-for-one meter replacement. Scope and quantiies are subject to filed verification. No additional dwelling unit or increase in the total number of utlility meters is proposed. No product keyword matched | 1 | Oct 5, 2026 |
| B | DIANE ELECTRIC INC. NYC DOB electrical permits | 10 | Sprinkler Coverage 14th Floor Mech Rm and Roof Penthouse No product keyword matched | 2 | Oct 5, 2026 |
| B | TIMES SQUARE ELECTRIC INC NYC DOB electrical permits | 10 | General Wiring - One AC split unit violation # 39194453Y No product keyword matched | 3 | Oct 5, 2026 |
| B | Dally Electrical Contracting Corp NYC DOB electrical permits | 10 | Minor work, add (1) receptacle on existing circuit. No product keyword matched | 1 | Oct 5, 2026 |
| B | UL ELECTRICAL CORP. NYC DOB electrical permits | 10 | GENERAL WIRING AND METER WORK No product keyword matched | 10 | Oct 4, 2026 |
| B | NGM ELECTRIC INC NYC DOB electrical permits | 10 | Temporary lighting in the common areas of the building No product keyword matched | 4 | Oct 4, 2026 |
| B | JTE ELECTRICAL SERVICES NYC DOB electrical permits | 10 | Temporary Panel Install No product keyword matched | 9 | Oct 4, 2026 |
| B | JUN SAFETY ELECTRICAL INC NYC DOB electrical permits | 10 | install 3 meter and general wiring No product keyword matched | 1 | Oct 3, 2026 |
| B | PCS ELECTRICAL SVCS INC NYC DOB electrical permits | 10 | Combining apartments 1-K and 1-L, general wiring No product keyword matched | 2 | Oct 3, 2026 |
| B | F & L GENERAL ELEC. CORP NYC DOB electrical permits | 10 | Removal of Control # B292150 dated 06/11/2007, ABANDONED status 08/22/2025, disposition: issue to owner No product keyword matched | 2 | Oct 3, 2026 |
| B | MONARCH PLUMB & HTG LLC NYC DOB building permits | 10 | Plumbing · REPLACE EXISTING BATHROOM FIXTURES, REMOVE GAS STOVE AND METER, REPLACE AND RELOCATE KITCHEN SINK AND DISHWASHER, RELOCATE EXISTING WASHER. PROPOSED WORK INVOLVES NO CHANGE IN BUILDING BULK, USE, OCCUPANCY, OR EGRESS. No product keyword matched | 4 | Oct 2, 2026 |
| B | East River Housing Corporation NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGER SYSTEM INSTALLTION , MATERIAL HOIST AND INSPECTION FOR FACADE REPAIRS. No product keyword matched | 2 | Oct 2, 2026 |
| B | MARSAL MAINTENANCE CORP. NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL equipment for 27 apartments and stores No product keyword matched | 3 | Oct 2, 2026 |
| B | THREE STAR CONSTRUCTION GROUP, LLC NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF NEW SIDEWALK SHED WITH PIPE SCAFFOLD AT 1735 CATON AVENUE, BROOKLYN AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 2, 2026 |
| B | ASPECT PLBNG&HTNG CO LLC NYC DOB building permits | 10 | Plumbing · Renovation of apartment #16. Relocation of existing kitchen; including sink, dishwasher, refrigerator, and oven. New bathroom with shower, lavatory, and water closet. Relocation of existing washer/dryer. No change to egress, use, or occupancy. No product keyword matched | 9 | Oct 2, 2026 |