Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | 72 SECOND PLACE CORP NYC DOB building permits | 7 | General Construction · Minor partition alterations at interior of Basement apartment. Replace rear window. No change to Occupancy, Use, or Egress No product keyword matched | 0 | Jan 27, 2026 |
| C | FullSteam Project Management LLC |
| 7 |
Structural · INTERIOR RENOVATION OF THE LOBBY, SECOND FLOOR MEETING ROOMS, AND CLUB LOUNGE LOCATED ON THE 20TH CONSTRUCTION FLOOR (21ST MARKETED FLOOR) AND RELATED FINISHES (PUBLIC AREAS). THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched |
| 0 |
| Jan 27, 2026 |
| C | DAVID NUSS NYC DOB building permits | 7 | General Construction · MINOR ALTERATION OF EXISTING 1 STORY BUILDING TO INCLUDE THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FIXUTRES, EQUIPMENT, WINDOWS, DOORS, AND SKYLIGHTS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Jan 27, 2026 |
| C | The lyric joint ventures llc NYC DOB building permits | 7 | Mechanical Systems · REPLACEMENT OF ROOFTOP CONDENSING UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | TISHEH CONSTRUCTION CORP NYC DOB building permits | 7 | General Construction · Interior renovation of Apartment 10M, no change in use, egress or occupancy No product keyword matched | 0 | Jan 27, 2026 |
| C | PRO BUILDING MANAGEMENT LLC NYC DOB building permits | 7 | General Construction · Horizontal and vertical enlargement of an existing one family house No product keyword matched | 0 | Jan 27, 2026 |
| C | CS BRIDGE CORP DBA COLGAT NYC DOB building permits | 7 | Suspended Scaffold · INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | RISING POINT INC NYC DOB building permits | 7 | Plumbing · PLUMBING APPLICATION TO INSTALL PLUMBING FIXTURES IN A 3 STORY MIXED USE BUIDING. -INSTALLATION OF 1 BFPA AS PER DEP APPROVAL(#25103530) ON 001. -INSTALLATION OF 1 ELECTRIC WATER HEATER IN CELLAR BOILER ROOM TO RESOLVE AN ECB VIOLATION(39144269Z) No product keyword matched | 0 | Jan 27, 2026 |
| C | EMPLOYER CONSTRUCTION COR NYC DOB building permits | 7 | Construction Fence · FILED FOR APPROVAL OF TEMPORARY WOOD CONSTRUCTION FENCE. No product keyword matched | 0 | Jan 27, 2026 |
| C | PANORAMA CONTRACTING INC NYC DOB building permits | 7 | Earth Work · REPLACE STEPS AND BRICK VENEER AT FRONT . REPLACE WINDOWS AND DOORS AT BAS AND 001 LEVEL AT FRONT ONLY. No product keyword matched | 0 | Jan 27, 2026 |
| C | ALKHATIB CONSTRUCTION COM NYC DOB building permits | 7 | General Construction · FILED HEREWITH TO INSTALL NEW GLASS DOOR AND WINDOW, NO CHANGE TO USE EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | LIMELIGHT CONTRACTING GRP NYC DOB building permits | 7 | General Construction · PROPOSED TO INSTALL BRICKS, PLYWOOD SHEETING, AND WOODEN SHINGLES TO ADDRESS VIOLATION: 39158170X NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jan 27, 2026 |
| C | PINA MANAGEMENT NYC DOB building permits | 7 | General Construction · Removal of interior non-bearing partitions as shown on plans. No change in use, occupancy or egress. No product keyword matched | 0 | Jan 27, 2026 |
| C | J. SIMON ASSOCIATES INC NYC DOB building permits | 7 | General Construction · RENOVATION OF APARTMENT 11N ON 11TH FLOOR. NO CHANGE TO OCCUPANCY, USE OR EGRESS. No product keyword matched | 0 | Jan 27, 2026 |
| C | ADP CONTRACTORS INC NYC DOB building permits | 7 | General Construction · RENOVATE EXISTING APARTMENT; PARTITIONS, FLOORING, CABINETRY, COUNTER, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | BLDRS GROUP INC NYC DOB building permits | 7 | General Construction · ENLARGE EXISTING TWO FAMILY HOUSE ON SECOND FLOOR. INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING. No product keyword matched | 0 | Jan 27, 2026 |
| C | STIVAN PLUMBING & HTG INC NYC DOB building permits | 7 | Sprinklers · INSTALL NEW SPRINKLER SYSTEM FOR 3-STORY RESIDENTIAL BUILDING SUBSEQUENT WITH A1 DOB NOW#Q01211950.NO CHANGE IN USE,EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | E. MULE & SON PLBG & HTG NYC DOB building permits | 7 | Plumbing · RELOCATION OF KITCHEN SINKS AND GAS RANGES ON 1ST, 2ND AND 3RD FLOOR, TOTAL OF 5 APARTMENTS No product keyword matched | 0 | Jan 27, 2026 |
| C | UD DENTAL NYC DOB building permits | 7 | General Construction · DEMOLITION OF INTERIOR NON BEARING PARTITIONS AND WINDOWS OF EXISTING OFFICES AS SHOWN ON PLANS. NO CHANGE IN USE, EGRESS, OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | Wagle NYC DOB building permits | 7 | Solar · INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | TECNY GROUP INC NYC DOB building permits | 7 | General Construction · AT APARTMENT 5G, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 27, 2026 |
| C | SOL DEVELOPERS LLC NYC DOB building permits | 7 | Curb Cut · PROPOSED NEW CURB CUT FOR ENTRANCE TO EXISTING PARKING LOT ON 61ST STREET. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jan 27, 2026 |
| C | GRID CITY ELECTRIC, CORP NYC DOB electrical permits | 7 | NEW 51KW SOLAR SYSTEM No product keyword matched | 0 | Jan 27, 2026 |
| C | ROGERS BUILDERS & DEVEL NYC DOB building permits | 7 | Construction Fence · FENCE APPLICATION FILED IN CONJUNCTION WITH ALT CO JOB #B00912183. No product keyword matched | 0 | Jan 26, 2026 |
| C | CARNEGIE HALL CORP NYC DOB building permits | 7 | Suspended Scaffold · Install 11 suspended scaffolds with outriggers. Scaffolds to be used for inspection with 3 people and with 2 people when work is being performed on the facade. Install one additional suspend scaffold in the same bay, but extend outriggers to clear cornice No product keyword matched | 0 | Jan 26, 2026 |
| C | 711 E LLC NYC DOB building permits | 7 | Structural · STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION JOB # X00997178-I1 No product keyword matched | 0 | Jan 26, 2026 |
| C | PROMENADENURSING HOME NYC DOB building permits | 7 | Foundation · HEREWITH FILING FOUNDATION WORK IN CONJUNCTION WITH OXYGEN SYSTEM UPGRADES PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jan 26, 2026 |
| C | MANAGEMENT OFFICE NYC DOB building permits | 7 | General Construction · Interior renovation of select existing apartments as per plans filed. no change in use egress or occupancy No product keyword matched | 0 | Jan 26, 2026 |
| C | SS NYC 121st Street, L.L.C NYC DOB building permits | 7 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS No product keyword matched | 0 | Jan 26, 2026 |
| C | PIEDMONT OFFICE MANAGEMENT NYC DOB building permits | 7 | General Construction · INTERIOR OFFICE RENOVATION 38 STORY BUILDING B (OFFICE). REMOVING A CONVIENCE STAIR CONNECTING THE 2 FLOORS 31 & 32 FLRS. COVERING THE OPENING WITH A CONCRETE SLAB. No change in use, egress, or occupancy. No product keyword matched | 0 | Jan 26, 2026 |
| C | HOOPER & KEAP DEVELOPMENT GROUP LLC NYC DOB building permits | 7 | Plumbing · MODIFICATION TO PLIMBING FIXTURES FOR INTERIOR RENOVATION OF APARTMENTS 2F & 2R. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jan 26, 2026 |
| C | 520 MADISON AVENUE NYC DOB building permits | 7 | Plumbing · Demo existing Pantry and Relocate Sprinkler Heads No product keyword matched | 0 | Jan 26, 2026 |
| C | Liberty Coca Cola NYC DOB building permits | 7 | Plumbing · DEMO OF EXISTING GAS PIPING & METER ROOM EQUIPMENT AND INSTALLATION OF NEW GAS PIPING FOR MECHANICAL UNITS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Jan 26, 2026 |
| C | 580 LENOX ASSOCIATES LLC NYC DOB building permits | 7 | Plumbing · ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION: REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, DRYERS VENT, HOT WATER HEATER VENT, A/C INSTALLATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jan 26, 2026 |
| C | JORGE MOLINA NYC DOB building permits | 7 | Sidewalk Shed · Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Jan 26, 2026 |
| C | ZNJ CONSTRUCTION INC. NYC DOB building permits | 7 | Construction Fence · 8.0' high wood construction fence located in an open space within the property No product keyword matched | 0 | Jan 26, 2026 |
| C | BEAR STEEL INC. NYC DOB building permits | 7 | General Construction · FILING IS MADE FOR THE INSTALLATION OF THE CHAIN-LINK FENCE AT THE EXISTING AUTO REPAIR SHOP AS IDENTIFIED ON THE DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 26, 2026 |
| C | BUDDHIST SOCIETY OF WONDERFUL ENLIG NYC DOB building permits | 7 | Structural · Repair fire damaged structural beams, expand cellar floor and retaining wall. No change in use, egress and occupancy. No product keyword matched | 0 | Jan 26, 2026 |
| C | UNITED CONSTRUCTION AND NYC DOB building permits | 7 | General Construction · Facade repairs. No change in egress, use or occupancy. No product keyword matched | 0 | Jan 26, 2026 |
| C | SOMA CONDOMINIUM NYC DOB building permits | 7 | General Construction · Remove & replace existing cracked stone facade at 1st floor w/ new sintered stone panels installed on rainscreen system. Proposed work to replace existing cement board substrate, insulation, waterproofing & vapor-barrier to comply w/ NYCECC requirements No product keyword matched | 0 | Jan 26, 2026 |
| C | PROLINE CONTRACTING GROUP NYC DOB building permits | 7 | General Construction · Legalize conversion of existing garage to habitable space, legalize removal of garage door with new door, brick facade to match existing. New plumbing fixtures to be filed under subsequent filing. Remove ECB violations 39137743L,39137742J,39137740X. No product keyword matched | 0 | Jan 26, 2026 |
| C | MARINE PARK SEASIDE LINKS LLC NYC DOB building permits | 7 | General Construction · ALT APPLICATION FOR THE RESTORATION OF A FIRE DAMAGE APARTMENTS AT 2ND & 3RD FLRS OF BLDG. ALL WORK TO BE DONE WITHIN EXISTING FOOTPRINT. ALL FIRE DAMAGED AREAS TO BE REPAIRED, REPLACE & RESTORED TO EXISTING CONDITION. NO CHANGE TO USE, OCCUPANCY No product keyword matched | 0 | Jan 26, 2026 |
| C | HALSTED S WELLES ASSOC.IN NYC DOB building permits | 7 | General Construction · Install new Planters on existing terraces as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 0 | Jan 26, 2026 |
| C | GINO O. LONGO, ARCHITECT NYC DOB building permits | 7 | General Construction · APPLICATION HEREWITH FILE FOR EXTERIOR ADA RAMPS AND WINDOW AT FRONT FACADE AND MINOR PARTITION WORK AT FIRST FLOOR. NO CHANGE TO OCCUPANCY, USE, EGRESS, OR BULK. No product keyword matched | 0 | Jan 26, 2026 |
| C | AN, AS TRUSTEE, CHONG TAEK NYC DOB building permits | 7 | Plumbing · INSTALL NEW GAS HEATER FOR EXISTING OFFICE AT 1ST FLOOR AS PER LAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 26, 2026 |
| C | LOTTERY NYC DOB building permits | 7 | General Construction · INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jan 26, 2026 |
| C | ABS CONSTRUCTION, INC NYC DOB building permits | 7 | General Construction · finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work. No product keyword matched | 0 | Jan 26, 2026 |
| C | LEEDING BUILDERS GROUP LLC NYC DOB building permits | 7 | Protection and Mechanical Methods · TEMPORARY WORKER/CONTRACTOR SHEDS/OFFICES AS PER DRAWINGS TO CORRECT SUMMONS # 39536608R. WORKER/CONTRACTOR SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jan 26, 2026 |
| C | WAKE ROBIN HOUSE LLC NYC DOB building permits | 7 | Plumbing · APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jan 26, 2026 |
| C | SHALBRO CONSTRUCTION GROU NYC DOB building permits | 7 | General Construction · PROPOSE NEW 16-STORY RESIDENTIAL BUILDING WITH 52 DWELLING UNITS. OBTAIN NEW C OF O. No product keyword matched | 0 | Jan 26, 2026 |