Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | AUTOZONE NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF 10 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 3 | Nov 9, 2026 |
| B | CONSOLIDATED SCAFFOLDING INC. NYC DOB building permits | 11 |
Sidewalk Shed · INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2022 NYC BUILDING CODE,CHAPTER 33. No product keyword matched |
| 120 |
| Nov 9, 2026 |
| B | INTERSYSTEM INSTALLATION S & S CORP NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 14 | Nov 9, 2026 |
| B | LB AND J CONSTRUCTION INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 47 | Nov 9, 2026 |
| B | V'S CREATIVE DESIGN NYC DOB building permits | 11 | Mechanical Systems · FILING TO REPLACE 2 AIR HANDLER ON THE FIRST FLOOR AND 2 CONDENSER OF THE ROOF. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 3 | Nov 9, 2026 |
| B | TRIBUTE RESTORATION INC NYC DOB building permits | 11 | Structural · Repairs to rear facade. No product keyword matched | 23 | Nov 9, 2026 |
| B | URENA CONSTRUCTION & DESIGN NYC DOB building permits | 11 | Structural · Repair damaged wood joists and awning as well as party wall as per DOB Violation 031426CER09DE No product keyword matched | 24 | Nov 9, 2026 |
| B | AMERICANA CONSTRUCTION GR NYC DOB building permits | 11 | Foundation · STRUCTURAL AND FOUNDATION WORK FILED IN CONJUNCTION WITH ARCH. DESIGNS. PROPOSED BENCHING SYSTEM AT CELLAR, OPENING IN REAR FACADE, FLOOR FRAMING REINFORCEMENT. NEW REAR STEEL DECK, DUNNAGE ON ROOF. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 3 | Nov 9, 2026 |
| B | KISHAN PLUMBING INC NYC DOB building permits | 11 | Plumbing · REPLACE HOT WATER TANKS AND REPLACE BOILERS, NEW 3 FIXTURES BATHROOM. No product keyword matched | 32 | Nov 9, 2026 |
| B | GEO USA CONSTRUCTION INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIONPROPOSED INSTALLATION OF HEAVY DUTY S No product keyword matched | 8 | Nov 9, 2026 |
| B | CUSHMAN AND WAKEFIELD NYC DOB building permits | 11 | Mechanical Systems · New water source heat pump for 22nd floor office and associated air distribution systems. No product keyword matched | 16 | Nov 9, 2026 |
| B | NEW YORK PRESBYTERIAN HOSPITAL NYC DOB building permits | 11 | General Construction · LMH PeriOp: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 66 | Nov 9, 2026 |
| B | Park Contracting Group LLC. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 155 | Nov 9, 2026 |
| B | GALAXY DEVELOPERS LLC NYC DOB building permits | 11 | Support of Excavation · SOE WORKTYPE HEREWITH FILED FOR NEW BUILDING No product keyword matched | 9 | Nov 9, 2026 |
| B | NILCOMAT INC NYC DOB building permits | 11 | General Construction · ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION: REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, DRYER VENT, HOT WATER HEATER VENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 2 | Nov 9, 2026 |
| B | DALTON MANAGEMENT CO. NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade repair & inspection. No product keyword matched | 7 | Nov 9, 2026 |
| B | JASCO, INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 38 | Nov 9, 2026 |
| B | COMMUNITY ACCESS, INC. NYC DOB building permits | 11 | General Construction · MASONRY RESTORATION, ROOF REPLACEMENT, WATERPROOFING INSTALLATION, LINTEL REPLACEMENT, WINDOWREPLACEMENT, MASONRY REPAIR, INSTALLATION OF VCT TILE, AND PV PANEL INSTALLATION. No product keyword matched | 8 | Nov 9, 2026 |
| B | OUR ISLAND PROPERTY MNGNT NYC DOB building permits | 11 | Plumbing · Exterior Storm Piping No product keyword matched | 20 | Nov 9, 2026 |
| B | BROWN HARRIS STEVENS LLC NYC DOB building permits | 11 | Mechanical Systems · INTERIOR RENOVATION OF SUPER'S APARTMENT, MINOR DEMOLITION OF NON-LOAD BEARING PARTITIONS, PAINTING & FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL AS PER PLANS AND APPLICATIONS. No product keyword matched | 39 | Nov 9, 2026 |
| B | CORE FOUR CONSTRUCTION IN NYC DOB building permits | 11 | General Construction · Demolition/General Construction as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 11 | Nov 9, 2026 |
| B | AMOK INC NYC DOB building permits | 11 | Plumbing · New plumbing work for existing warehouse tenant. No product keyword matched | 10 | Nov 9, 2026 |
| B | HY DESIGN & DEVELOPMENT L NYC DOB building permits | 11 | Support of Excavation · Proposed support of excavation work in conjuction with DOB NOW Job#Q01410922-I1. No product keyword matched | 12 | Nov 9, 2026 |
| B | BUCHBINDER & WARREN LLC NYC DOB building permits | 11 | Structural · INSTALLATINO OF NEW WOOD JOIST FRAMING FOR NEW CONVIENCE STAIR & NEW STEEL SUPPORT COLUMNS AS PER THE DRAWINGS FILED HEREIN. No product keyword matched | 42 | Nov 9, 2026 |
| B | STONEHENGE MANAGEMENT LLC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR INTERIOR RENOVATIONS AS PER PLANS IN UNIT 10G AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. No product keyword matched | 21 | Nov 9, 2026 |
| B | NEW YORK CITY DEPT. OF ENVIRONMENTA NYC DOB building permits | 11 | Structural · Hunts Point WWTP - Aeration Building North. Scope of work is to reinforce exterior walls No product keyword matched | 13 | Nov 9, 2026 |
| B | RADSON DEVELOPMENT NYC DOB building permits | 11 | General Construction · New Fourteen (14) Story Mixed Use Affordable Housing Dwelling. No product keyword matched | 2 | Nov 9, 2026 |
| B | A M B MECHANICAL INC NYC DOB building permits | 11 | Plumbing · SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES, IN CONJUNCTION TO ALT JOB - B01148069-I1 No product keyword matched | 9 | Nov 9, 2026 |
| B | S&E BRIDGE & SCAFFOLD LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP No product keyword matched | 105 | Nov 9, 2026 |
| B | D.C.F. CONTRACTING INC NYC DOB building permits | 11 | General Construction · ALTERATION TYE 1 PLANS AND APPLICATION FOR The PROPOSED 1ST, 2ND, AND 3RD FL. INTERIOR ALTERATIONS TO THE PROPOSED TWO FAMILY RESIDENCE. NEW REQUIRED BUILT IN ONE CAR GARAGE PROVIDED FOR THE ADDITIONAL DWELLING UNIT, NO INCREASED FLOOR AREA OR COVERAGE. P No product keyword matched | 11 | Nov 9, 2026 |
| B | STELLAR MANAGEMENT NYC DOB building permits | 11 | Sprinklers · RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. No product keyword matched | 38 | Nov 9, 2026 |
| B | MAMC CONSULTING REPS LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 10 | Nov 9, 2026 |
| B | HORBRIDGE PLUMBING & HEAT NYC DOB building permits | 11 | Plumbing · FILING FOR PLUMBING WORK AS PER PLANS No product keyword matched | 7 | Nov 9, 2026 |
| B | UNITED CAPITAL CORP. NYC DOB building permits | 11 | General Construction · NEW C. OF O. FOR OCCUPANCY CHANGE FROM DRUG STORE (USE GROUP 6A) TO RETAIL STORES (USE GROUP 6A) AND ADDITIONAL PARKING SPACES. No product keyword matched | 1 | Nov 9, 2026 |
| B | ELLIOT PLACE ASSOCIATES LLC NYC DOB building permits | 11 | General Construction · ESTABLISHMENT OF COMMERCIAL LAUNDROMAT. INTERIOR RENOVATION: REMOVE NON-LOAD BEARING INTERIOR PARTITIONS, ERECT NEW INTERIOR PARTITIONS, DRYER VENT, HOT WATER HEATER VENT INSTALLATION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 9, 2026 |
| B | NEPTUNE SIGNS & AWNINGS NYC DOB building permits | 11 | Sign · INSTALL NEW ILLUMINATED SIGN READ OASIS CAFE AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 34 | Nov 9, 2026 |
| B | THE MOINIAN GROUP NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 17 | Nov 9, 2026 |
| B | NEW LINE BUILDERS NYC DOB building permits | 11 | Construction Fence · Temporary Construction Fence to secure property (266.00lf). Construction Fence filed in conjunction with FD #X00892558-I1 & GC #X00934698. No product keyword matched | 11 | Nov 9, 2026 |
| B | PRESTIGE MANAGEMENT INC. NYC DOB building permits | 11 | Structural · Filing for Solar panel structural framing as per plans filed herewith. No change in use, occupancy or egress. No product keyword matched | 14 | Nov 9, 2026 |
| B | DAJIA US NYC DOB building permits | 11 | General Construction · Herewith filing for interior removals & renovations on floors 39 thru 42 (Marketing floors 47, 48, 49, 50). No change in use, occupancy, and egress. No product keyword matched | 3 | Nov 9, 2026 |
| B | DYCKMAN'S NYC DOB building permits | 11 | General Construction · FILING TO INCLUDE INTERIOR ALTERATION OF FLOOR 3RD FLOOR, AS INDICATED ON PLANS,TO REMOVE SHEETROCK INSTALLED IN DOORS FROM ROOM TO ROOM (BLOCKING ACCESS TO OTHER ROOMS) , TO ADDRESS VIOLATION NUMBER 35681456M. NO CHANGE IN USE, OCCUPANCY OF EGRESS No product keyword matched | 1 | Nov 9, 2026 |
| B | DONATO PLUMBING, INC NYC DOB building permits | 11 | Plumbing · PL FIXTURES IN APT 16C FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 42 | Nov 9, 2026 |
| B | A&A PLUMBING CORP NYC DOB building permits | 11 | Plumbing · PLUMBING MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Nov 9, 2026 |
| B | SKY EQUITY GROUP LLC NYC DOB building permits | 11 | Supported Scaffold · Installation of a temporarily supported scaffold and heavy-duty sidewalk shed/overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 10 | Nov 9, 2026 |
| B | AVARGA CONSTRUCTION CORP NYC DOB building permits | 11 | Suspended Scaffold · Erect, use and dismantle suspended scaffolds on outrigger beams at all elevations for facade restoration work under job #M01437707 No product keyword matched | 30 | Nov 9, 2026 |
| B | WATERMARK PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Legalize 3 pcs bathroom and washer dryer in cellar No product keyword matched | 8 | Nov 9, 2026 |
| B | CENTRAL REALTY LIC LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 5 | Nov 9, 2026 |
| B | MALBA PROPERTY LLC NYC DOB building permits | 11 | Plumbing · partial plumbing work, new building sewer as per DEP approved site connection. DOB inspection sewer steel sleeve through foundation wall. No product keyword matched | 4 | Nov 9, 2026 |
| B | ZAQ CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · INSTALLATION OF NEW FLOATING WOOD DECK, METAL PERGOLA, AND HARDSCAPING REPLACEMENT IN FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 37 | Nov 9, 2026 |
| B | 1790 BROADWAY ASSOCIATES LLC NYC DOB building permits | 11 | Sprinklers · Sprinkler - Provide new sprinkler coverage for small offices with new ceiling. Provide sprinkler coverage for fire rated glass No product keyword matched | 5 | Nov 9, 2026 |