Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | GEARLAD PALMER NYC DOB building permits | 10 | Curb Cut · APPLICATION BEING FILED TO BUILD A NEW CURB CUT. No product keyword matched | 2 | Oct 6, 2026 |
| B | COOPER SQ. MHA NYC DOB building permits | 10 | Solar · Installation of 7.04 kW solar energy system on roof. No change of occupancy, use or egress. |
| 3 |
| Oct 6, 2026 |
| B | CAPSTONE REAL ESTATE MANAGEMENT NYC DOB building permits | 10 | Structural · CELLAR, SUB-CELLAR AND SIDEWALK REHABILITATION OF THE PHILIPPINE CENTER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 6, 2026 |
| B | DAYTON HOLDINGS INTERNATIONAL N.V. NYC DOB building permits | 10 | Structural · Garage repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | JR'S HARDWOOD FLOORS LLC NYC DOB building permits | 10 | General Construction · PROPOSED RENOVATION OF EXISTING (1) FAMILY HOUSE. NO CHANGE IN BULK, OCCUPANCY, USE OR EGRESS. No product keyword matched | 1 | Oct 6, 2026 |
| B | S.K. MUKHERJEE NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION AS INDICATED ON THE PLANS, INCLUDING BUT NOT LIMITED TO: INSTALLATION OF PLUMBING FIXTURES, INSTALLATION OF NEW INTERIOR PARTITIONS, DOORS, SINSTALLATION OF NEW MILLWORK AND FINISHES. SEE SUBSEQUENT FILINGS FOR MECHANICAL. No product keyword matched | 1 | Oct 6, 2026 |
| B | DANCOBY INC NYC DOB building permits | 10 | General Construction · Bathroom renovation and minor partition work. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | B-N-A RESTORATION CORP NYC DOB building permits | 10 | General Construction · REMOVE EXISTING INCOMPLETE, UNPERMITTED WOOD-FRAMED REAR-YARD SHED AND ALL COMPONENTS TO CORRECT RELATED DOB/OATH VIOLATIONS. NO FOUNDATION, EXCAVATION OR UNDERPINNING. ELECTRICAL REMOVAL UNDER DOB NOW FILING S01421434-I1. LEAVE YARD SAFE AND CLEAR. No product keyword matched | 1 | Oct 6, 2026 |
| B | NAIL ON THE HEAD LLC NYC DOB building permits | 10 | Mechanical Systems · RENOVATION OF EXISTING APARTMENT 15BC ON 014TH FLOOR. WORK INCLUDES REPLACEMENT OF AC UNITS, MINOR NON-STRUCTURAL PARTITION WORK, NEW FINISHES, AND REPLACEMENT OF EXISTING WINDOWS IN PRESENT MASONRY OPENINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | EAST HOLLOW PROPERTY GROUP NYC DOB building permits | 10 | General Construction · FILING FOR INTERIOR CONSTRUTION WORK AS PER PLANS No product keyword matched | 1 | Oct 6, 2026 |
| B | NYC REMODELER INC NYC DOB building permits | 10 | General Construction · RENOVATE APT 23L: INSTALL NON-LOAD-BEARING PARTITIONS FOR NEW WALK-IN CLOSET; REPLACE KITCHEN CABINETS, APPLIANCES, BATHROOM FINISHES, KITCHEN/BATH FLOORING AND CLOSET DOORS. PLUMBING AND ELECTRICAL FILED SEPARATELY. NO CHANGE IN USE OR EGRESS. No product keyword matched | 1 | Oct 6, 2026 |
| B | PRO BUILDERS INC NYC DOB building permits | 10 | Construction Fence · TEMPORARY CONSTRUCTION WOOD FENCE IN OSP No product keyword matched | 1 | Oct 6, 2026 |
| B | 3539 TIEMANN LLC NYC DOB building permits | 10 | Construction Fence · Construction fence filed for the construction of a new building. No product keyword matched | 1 | Oct 6, 2026 |
| B | Bay deli market corp NYC DOB building permits | 10 | Plumbing · Legalize Commercial Cooking Equipment to address violation # 39182926R No product keyword matched | 1 | Oct 6, 2026 |
| B | Haft family trust NYC DOB building permits | 10 | Structural · Reinforcement of existing garage roof. No change to use, egress, or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | CHANTAL CLESCA NYC DOB building permits | 10 | General Construction · COMBINATION OF APTS 2A, 3A AND 3B. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 6, 2026 |
| B | DICKENS GROUP NYC DOB building permits | 10 | General Construction · EXTERIOR BUILDING FACADE REPAIRS OF EXISTING FOUR(4) STORY BUILDING AS PER ELEVATIONS SUBMITTED HERE WITH NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | K & W BUILDING & DEV CORP NYC DOB building permits | 10 | Construction Fence · Installation of temporary wood construction fence surrounding the perimeter of tax lots 27 & 28 for the (2) proposed NB applications. No product keyword matched | 1 | Oct 6, 2026 |
| B | Boschen Design, Architecture NYC DOB building permits | 10 | General Construction · Remove (3) doors of convenience between 120 & 122 State Street; Restore the original masonry separation. No change in use, egress, occupancy or Floor Area. No product keyword matched | 1 | Oct 6, 2026 |
| B | EMPIRE AUTOMOTIVE GROUP NYC DOB building permits | 10 | Mechanical Systems · THE DIRECT REPLACEMENT OF ONE 15 TON ROOF TOP HVAC UNIT. NO CHANGE TO USE, OCCUPANCY, STRUCTURE OR EGRESS. No product keyword matched | 1 | Oct 6, 2026 |
| B | Major World NYC DOB building permits | 10 | Mechanical Systems · Filing for mechanical work for the direct replacement and in-kind installation of (1) one Roof Top Unit with a similar unit. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | 675 WALTON AVENUE OWNER'S CORP. NYC DOB building permits | 10 | Structural · UNIT 3A FLOOR JOISTS REPAIRS No product keyword matched | 1 | Oct 6, 2026 |
| B | RMR RENOVATIONS INC NYC DOB building permits | 10 | Construction Fence · Wood Construction Fence No product keyword matched | 1 | Oct 6, 2026 |
| B | FIVE GEORGIAN BROTHERS GROUP, INC NYC DOB building permits | 10 | Mechanical Systems · REPLACE EXISTING HOOD IN CONJUNCTION WITH INTERIOR RENOVATION @ EXISTING RESTAURANT TO PROVIDE NEW FINISHES, MODIFY EXISTING TOILETS AND KITCHEN. NO CHANGE IN USE, OCCUPANCY AND EGRESS. No product keyword matched | 1 | Oct 6, 2026 |
| B | GAIL LEVY NYC DOB building permits | 10 | General Construction · Interior renovation of apt 11E, removal of non-load bearing partitions and erection of new partitions, finishes and paint work. All as per plans and applications. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | HIGHER STANDARD INTERIORS NYC DOB building permits | 10 | General Construction · General construction proposed in existing unit #22AB on the 21st fl. Existing fan coil units are to be replaced in the same location. Sub plumbing app to be filed. All per submitted plans. No changes to use, egress, or occupancy under this application. No product keyword matched | 1 | Oct 6, 2026 |
| B | LINE VENTURE GROUP LLC NYC DOB building permits | 10 | General Construction · BUILD TO INCORPORATE ALL WORK PREVIOUSLY FILED UNDER LEGACY OPEN BIS JOB#420357143 & BIS JOB#420239067. THIS APPLICATION REFLECT AS BUILT CONDITIONS FOR GROUND AND CELLAR FLOOR TO CORRECT SUMMON#34855382J &34263623M. NO CHANGE IN USE, OCCUPANCY AND EGRES No product keyword matched | 1 | Oct 6, 2026 |
| B | PIONEER TRANSPORTATION CORP. NYC DOB building permits | 10 | General Construction · INSTALLING (12) NEW DUAL PORT & (1) Single port LEVEL 2 EV CHARGING STATIONS (Autel AC Pro 80A 19.2kW. INSTALL (1) NEW SEB INSTALL (1) NEW 1600A 120/208V 3PH-4W MAIN DISCONNECT. INSTALL (2) NEW 800A 120/208V. INSTALL (25) 100A 2-POLE BREAKERS No product keyword matched | 1 | Oct 6, 2026 |
| B | DELUXE ELECL & MAINT CORP NYC DOB electrical permits | 10 | General wiring for (2) lobby AC unit replacements on ground floor. General wiring for (2) Roof Chiller Replacements No product keyword matched | 1 | Oct 6, 2026 |
| B | CREGGAN ELECTRIAL CORP NYC DOB electrical permits | 10 | General Wiring in Apartment 7E work in master bed, master bath, office & den only. No product keyword matched | 4 | Oct 6, 2026 |
| B | NAPSTAR ELECTRIC INC NYC DOB electrical permits | 10 | General Wiring No product keyword matched | 5 | Oct 6, 2026 |
| B | JANON ELECTRIC CORP NYC DOB electrical permits | 10 | Interior Renovation to McDonalds No product keyword matched | 3 | Oct 6, 2026 |
| B | CLEAR CHANNEL ELECTL SVCS NYC DOB electrical permits | 10 | As per Chief Schuler this permit is to replace M362115 sign permit at MSG all existing signs are powered by permit M355146 No product keyword matched | 7 | Oct 6, 2026 |
| B | HIGH STANDARD ELECTRIC NYC DOB electrical permits | 10 | General Wiring, Lighting & HVAC No product keyword matched | 2 | Oct 6, 2026 |
| B | DCE CORPORATION NYC DOB electrical permits | 10 | APT # 2 Wire and install 1 lutron panel , 1 shade panel , 40 lights, 40 new outlets , replace 25 existing outlets , replace 20 existing switches ,no ac work and existing panel to remain No product keyword matched | 1 | Oct 6, 2026 |
| B | POWERUP NY ELEC.CONTR.LLC NYC DOB electrical permits | 10 | permit to legalize ECB #039198251Y, water main grounding No product keyword matched | 4 | Oct 6, 2026 |
| B | NEW YORK CITY ELECTRIC IN NYC DOB electrical permits | 10 | Installation of 7 Wall Sconce and 2 Closet Lights in apartment 12BE No product keyword matched | 2 | Oct 6, 2026 |
| B | SOSA ELECTRIC LLC NYC DOB electrical permits | 10 | Installation of New sconces from existing power. No product keyword matched | 4 | Oct 6, 2026 |
| B | TAKING CARE OF BUS ELECT NYC DOB electrical permits | 10 | RELOCATE EXISTING ELECTRIC AND NEW LIGHT FIXTURES. No product keyword matched | 3 | Oct 6, 2026 |
| B | JR ELECTRIC CONTRACTS COR NYC DOB electrical permits | 10 | LEGALIZE, Lights, switches and receptacles No product keyword matched | 2 | Oct 6, 2026 |
| B | Solil Management, LLC NYC DOB building permits | 10 | Structural · GARAGE AND FACADE REPAIRS AS PER THE PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | Sollevare Group NYC DOB building permits | 10 | General Construction · INTERIOR MINOR DEMOLITION WORK TO EXISTING 3-STORY BUILDING WITH CELLAR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 8 | Oct 5, 2026 |
| B | BENENSON REAL ESTATE CORP NYC DOB building permits | 10 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 6 | Oct 5, 2026 |
| B | BLUE J CONTRACTING CORP NYC DOB building permits | 10 | Earth Work · Foundation, excavation and SOE work inconjunction with new building filed under seperate application. No product keyword matched | 1 | Oct 5, 2026 |
| B | FULL CAPACITY FIRE CORP NYC DOB building permits | 10 | Sprinklers · TEMPORARY RELOCATION AND REMOVEAL OF EXISTING SPRINKLER SYSTEM DESIGN TO ACCOMMODATE STRUCTURAL WORK. APPLICATION FILED IN CONJUNCTION WITH No product keyword matched | 7 | Oct 5, 2026 |
| B | AABM CONSTRUCTION CORP NYC DOB building permits | 10 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 5, 2026 |
| B | HARLEM COMMONWEALTH COUNCIL NYC DOB building permits | 10 | General Construction · Filing herewith rehabilitation of 3500sqf Cellar space to include partitions and toilets. There is no Change to the height or bulk of the building. No product keyword matched | 1 | Oct 5, 2026 |
| B | ANCHOR HOUSE INC. NYC DOB building permits | 10 | Construction Fence · IT IS PROPOSED TO ERECT A TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NEW BUILDING #B00598688-I1. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | J.W. MAYS INC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 5, 2026 |
| B | Westbrook Properties NYC DOB building permits | 10 | Plumbing · Modifications to existing plumbing system & related piping for unit 117. No change in use, egress or occupancy. No product keyword matched | 10 | Oct 5, 2026 |