Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | NY METROPOLITAN P&H INC NYC DOB building permits | 10 | Plumbing · INSTALL ONE (1) FIREPLACE GAS BURNER ON 1st FLOOR. No product keyword matched | 1 | Oct 6, 2026 |
| B | Yale Club New York City NYC DOB building permits | 10 |
| 1 |
| Oct 6, 2026 |
| B | HOMEPRO GENERAL CONTRACTI NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION FOR (2) FAMILY DWELLING UNIT. NO CHANGE IN USE OF EGRESS & OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | BELFOR LONG ISLAND LLC NYC DOB building permits | 10 | Mechanical Systems · ALL MECHANICAL CONDENSERS, AIR HANDLERS, DUCT, SUPPLY AND RETURN REGISTERS ARE TO REMAIN. ALL WORK TO TAKE PLACE INSIDE OF SUBJECT APARTMENT 4TH FLOOR APARTMENT 4CD AND ON BUILDING ROOF. DRYER TO BE REATTACHED TO EXISTING EXHAUST DUCT. No product keyword matched | 2 | Oct 6, 2026 |
| B | MAGNUM NYC DOB building permits | 10 | Boiler Equipment · NEW BOILER SYSTEM AT 3RD FLOOR, CONNECTED TO EXISTING GAS, WATER, ANDDISTRIBUTION SYSTEMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 6, 2026 |
| B | ACME AWNING CO. INC NYC DOB building permits | 10 | Plumbing · FILING (5) UNIT HEATERS IN WAREHOUSE. REPLACE GAS PIPING THROUGHOUT. No product keyword matched | 1 | Oct 6, 2026 |
| B | RUGGIERO MGMT NYC DOB building permits | 10 | Structural · STRUCTURAL WORK TO REPAIR BUILDING DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Oct 6, 2026 |
| B | BROCHI CONSTRUCTION LLC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK FILED AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 2 | Oct 6, 2026 |
| B | 88HOMES INC NYC DOB building permits | 10 | Mechanical Systems · Application seeks to legalize the rear extension and address existing violations, as shown in the attached drawings. It also proposes the construction of a three-fixture bathroom at the cellar level. There will be no changes to egress, use, or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | JL PLUMBING, LLC NYC DOB building permits | 10 | Plumbing · CURE OATH/ECB VIOLATION#34374278M, PLUMBING WORK RELATING TO INTERIOR RENOVATION INSIDE EXISTING 1ST FL AND BASEMENT TO RESTORE BACK TO ONE DWELLING UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 6, 2026 |
| B | MARINA MEJIA NYC DOB building permits | 10 | Structural · INTERIOR RENOVATION AND HORIZONTAL EXTENSION TO AN EXISTING ONE-FAMILY DWELLING,, PLUMBING WORK AS PER PLANS, NO CHANGE OF USE, EGRESS OR OCCUPANCY, NEW C. OF O. No product keyword matched | 1 | Oct 6, 2026 |
| B | NICOTRA GROUUP NYC DOB building permits | 10 | Plumbing · plumbing and sprinkler work as per plans for a tenant fit out No product keyword matched | 3 | Oct 6, 2026 |
| B | Stormfield Capital Funding I, LLC NYC DOB building permits | 10 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB FILED UNDER APPLICATION #320913428. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 6, 2026 |
| B | METROCITY RENOVATION INC NYC DOB building permits | 10 | General Construction · Proposed to obtain new Certificate of Occupancy for the minor interior renovation on first floor for existing medical office with new second floor vertical extension with 2 new dwelling units as per plans filed herewith. No product keyword matched | 1 | Oct 6, 2026 |
| B | AKAM NYC DOB building permits | 10 | Suspended Scaffold · INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. NO CHANGES IN THE EGRESS. No product keyword matched | 4 | Oct 6, 2026 |
| B | A.S. CONSTR. & DEVELOPMEN NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING 5TH FLOOR APARTMENT IN EXISTING MULTI-FAMILY BUILDING. NO CHANGE IN EGRESS, OCCUPANCY, OR USE. No product keyword matched | 1 | Oct 6, 2026 |
| B | WE WORK GROUP INC NYC DOB building permits | 10 | General Construction · GENERAL INTERIOR RENOVATIONS OF AN APARTMENT 9K. MINOR PARTITION REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | THE MUSEUM OF MOVING IMAGE NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL UPGRADES AND CHILLER REPLACEMENT ON ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | EVOLUTION GROUP ENTERPRI* NYC DOB building permits | 10 | General Construction · MINOR RENOVATION TO APT 4 K AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | HYATT CENTRIC HOTEL NYC DOB building permits | 10 | Mechanical Systems · Replacement of existing water cooled centrifugal chillers on the 2nd floor with new with related piping and ductwork as per plans filed herewith. No product keyword matched | 1 | Oct 6, 2026 |
| B | PAUL NYC DOB building permits | 10 | Plumbing · Propose to install drainage for proposed overhead canopy structure. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | UNITED GENERAL CONTRA COR NYC DOB building permits | 10 | Earth Work · ALT-1 CO FILED TO CONVERSION OF ONE TO TWO FAMILY DWELLING WITH EXTENSION No product keyword matched | 5 | Oct 6, 2026 |
| B | RPM APARTMENTS LLC NYC DOB building permits | 10 | Earth Work · Foundation and Earthwork in conjunction to NB filing 210182354 No product keyword matched | 2 | Oct 6, 2026 |
| B | SKYLINE WINDOWS LLC NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND REPAIRS - NO CHANGES IN THE EGRESS. No product keyword matched | 2 | Oct 6, 2026 |
| B | TAJCO CONSTRUCTION CORP NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW PLUMBING FIXTURES ON CELLAR, 1ST & 2ND FLOOR APPLICATION FILED IN SUBSEQUENT TO B01242448-I1. No product keyword matched | 2 | Oct 6, 2026 |
| B | MOMS CLEANERS NYC DOB building permits | 10 | Mechanical Systems · REPLACE EXISTING AIR HANDLER & CONDENSING UNIT WITH NEW AIR HANDLER AND CONDENSING UNIT AS PER PLAN. ALL EXISTING VENTILATION DUCKS TO BE REMAINED. No product keyword matched | 1 | Oct 6, 2026 |
| B | SANFORD LLC NYC DOB building permits | 10 | Suspended Scaffold · installation of outrigger for facade repair. No product keyword matched | 1 | Oct 6, 2026 |
| B | LBWI NY REALTY LLC NYC DOB building permits | 10 | Plumbing · Plumbing filed in conjunction with ALT-1 B01364884-I1 No product keyword matched | 1 | Oct 6, 2026 |
| B | HI-TECH BUILDERS INC NYC DOB building permits | 10 | General Construction · EXTERIOR RENOVATION INCLUDING ROOF WATERPROOFING SYSTEM AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED IF REQUIRED TO BE FILED SEPARATELY. No product keyword matched | 1 | Oct 6, 2026 |
| B | 660 BELMONT PARTNERS, LLC NYC DOB building permits | 10 | Plumbing · REMOVAL & REINSTALLATION OF PLUMBING SYSTEMS THROUGHOUT NINE(9) DWELLING UNITS,3-STORY W/ BASEMENT &BULKHEAD AS PER PLAN SHOW. No product keyword matched | 1 | Oct 6, 2026 |
| B | NEW YORK BOOM TRUCKS INC NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | STONE & OAK INTERIORS INC NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING KITCHEN AND BATHROOMS AT APARTMENT 5A ON 5TH FLOOR. NEW G.W.B. DROP CEILINGS AND PARTITIONS. REPLACEMENT AND NEW PLUMBING FIXTURES. NEW LIGHTING FIXTURES THROUGHOUT. No product keyword matched | 1 | Oct 6, 2026 |
| B | St Mark-St. Margaret Mary Parish NYC DOB building permits | 10 | Plumbing · Replace existing 2 gas line with 2-1/2 line from meter to boiler No product keyword matched | 1 | Oct 6, 2026 |
| B | DIPIERRO ACTION CONSTR CO NYC DOB building permits | 10 | Structural · PROPOSED STRUCTURAL WORK-TYPE FOR NEW EXTERIOR REAR BALCONY.. FILED IN CONJUNCTION WITH AND SUBSQUENT TO GERNAL CONSTRUCTION APPLICATION. No product keyword matched | 1 | Oct 6, 2026 |
| B | FJB CONTRACTING INC NYC DOB building permits | 10 | General Construction · FILING HEREWITH KITCHEN AND BATHROOM RENOVATION WITH THE REMOVAL AND INSTALLATION OF FIXTURES IN KIND AS SHOWN ON THE DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 6, 2026 |
| B | JBM Construction LLC NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION & MECHANICAL WORK FOR INTERIOR RENOVATION OF FIRST FLOOR. No product keyword matched | 1 | Oct 6, 2026 |
| B | MICHELMAN REAL ESTATE NYC DOB building permits | 10 | General Construction · Fire restoration of existing 1-story brick commercial building which including seven(7) existing U.G 6 stores. Works including minor patching & painting, but some stores require total renovation. No change in use, egress, & occupancy. No product keyword matched | 1 | Oct 6, 2026 |
| B | HARBOR GARDENS ASSOCIATES, LLC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF (1) NEW ADA COMPLIANT TOILET ROOM AND NEW HAND SINK AT 1ST FLOOR ONLY. No product keyword matched | 4 | Oct 6, 2026 |
| B | HIICOMPANY CORP NYC DOB building permits | 10 | General Construction · Interior renovation of apartment 15 A associated with teh GC scope. No change in use, egress, or occupancy under this application. No product keyword matched | 3 | Oct 6, 2026 |
| B | DOMNITCH MANAGEMENT CO LLC NYC DOB building permits | 10 | General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 6, 2026 |
| B | Madison Propco, LLC NYC DOB building permits | 10 | Mechanical Systems · Modifications to existing HVAC s ystem No product keyword matched | 3 | Oct 6, 2026 |
| B | LEVIATHAN NYC DOB building permits | 10 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 6, 2026 |
| B | 1614 Forst Rest Inc NYC DOB building permits | 10 | Sprinklers · DEMOLITION OF THE EXISTING SPRINKLER SYSTEM INCLUDING HEADS AND BRANCH PIPING BACK TO THE EXISTING MAIN. THE INSTALLATION OF TEMPORARY SPRINKLER PROTECTION INCLUDING ALL HEADS AND PIPING. THE INSTALLATIONOF NEW PERMANENT SPRINKLER SYSTEM. No product keyword matched | 3 | Oct 6, 2026 |
| B | NORTHERN CONTRACTOR LLC NYC DOB building permits | 10 | Construction Fence · THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR CONSTRUCTION WORK AT 87-90 258 STREET, QUEENS, NY 11001 DOB JOB#Q01462297-I1 No product keyword matched | 3 | Oct 6, 2026 |
| B | FROM THE ASHES 125 LLC NYC DOB building permits | 10 | Construction Fence · Installation of construction fence for a single-family home. No change of use, occupancy or egress. No product keyword matched | 2 | Oct 6, 2026 |
| B | CBRE INC. A/A/F NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Oct 6, 2026 |
| B | Livonia Discount NYC DOB building permits | 10 | Structural · FILING STRUCTURAL WORK TYPE TO SHOW THE REMOVAL OF THE I BEAM, AND THE METAL STAIRS USED FOR MEZZANINE LEVEL INSIDE 1ST FL COMMERCIAL SPACE. WORK AS PER PLANS IN CONJUNCTION WITH GC DEMOLITION APPLICATION# B01192926-I1. No product keyword matched | 2 | Oct 6, 2026 |
| B | JEWEL STREET REALTY, LLC NYC DOB building permits | 10 | Mechanical Systems · REPLACEMENT OF EXISTING HVAC UNITS ON EXISTING STEEL DUNNAGE. No product keyword matched | 4 | Oct 6, 2026 |
| B | Jamestown LP NYC DOB building permits | 10 | Structural · STRUCTURE FOR PROPOSED DIRECTLY ILLUMINATED (LED) DOUBLE-FACED CHANGEABLE COPY ACCESSORY BUSINESS PROJECTING SIGN. SIGN FILED UNDER SEPARATE APPLICATION #M01430864. No product keyword matched | 2 | Oct 6, 2026 |
| B | LOW VOLTAGE TELECOM SYSTEMS LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATIONS AS INDICATED ON THE DRAWINGS. No product keyword matched | 1 | Oct 6, 2026 |