Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | FIRST PIONEER PROPERTIES, INC. NYC DOB building permits | 10 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 4 | Oct 7, 2026 |
| B | TCM CORPORATION NYC DOB building permits |
| 10 |
General Construction · FILING APPLICATION FOR INTERIOR RENOVATION OF APARTMENT 9C ON THE 9TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 1 |
| Oct 7, 2026 |
| B | TRIESTE CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · RENOVATION AND COMBINATION OF APT 13C AND PART OF 13B AS SHOWN ON PLANS. NO CHANGE TO EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 7, 2026 |
| B | SDC CONTRACT INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT INCLUDING KITCHEN AND THREE BATHROOMS; MODIFY NON-LOAD-BEARING PARTITIONS; REPLACE SELECT DOORS; NEW WARDROBE/CLOSET FIT-OUTS; AND NEW WOOD FLOORING THROUGHOUT. No product keyword matched | 1 | Oct 7, 2026 |
| B | HOLLYWOOD CONS. GROUP INC NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 7, 2026 |
| B | QUEST BUILDERS GROUP INC NYC DOB building permits | 10 | Mechanical Systems · HEREBY FILING TO REMOVE MECHANICAL UNITS AND ASSOCIATED DUCTWORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Oct 7, 2026 |
| B | TRIBORO CONSTR ASSOC INC NYC DOB building permits | 10 | General Construction · CONSTRUCTION WORK IN CELLAR AND REAR YARD FOR BACKWATER VALVES.AND SUMP PUMP SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 1 | Oct 7, 2026 |
| B | BROOKRIVER HOTELS & RESORTS LLC LLC NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 4 | Oct 7, 2026 |
| B | K & K RENOVATION INC NYC DOB building permits | 10 | General Construction · RENOVATION OF APT 10H FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 3 | Oct 7, 2026 |
| B | CITY PLUMBING INC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK ONLY BEING FILED IN CONJUNCTION WITH ALTERATION DOBNOW #B01355071-I1. NEWPLUMBING PIPING AND FIXTURES PER PLANS. INSTALL NEW NAVIEN HWH AND NAVIEN TANKLESS BOILER. No product keyword matched | 2 | Oct 7, 2026 |
| B | SYED CONTRACTORS. CORP. NYC DOB building permits | 10 | General Construction · PROPOSE NEW OPEN OUTDOOR CONCRETE STEPS TO CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 7, 2026 |
| B | HAUSSMANN DEVELOPMENT LLC NYC DOB building permits | 10 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 4 | Oct 7, 2026 |
| B | ADVISORS + CONSULTANTS NYC DOB building permits | 10 | Mechanical Systems · INSTALL NEW CHIMNEY LINERS AND DRAFT INDUCERS. REPAIR EXISTING FIREPLACES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Oct 7, 2026 |
| B | ATLANTIC AVE 86 LLC NYC DOB building permits | 10 | General Construction · Interior renovation of an existing six family residence with new partition wall, kitchen and bathroom. Correct ECB violation #34275967Y & 34275968X. No change to the use, egress or occupancy. No product keyword matched | 1 | Oct 7, 2026 |
| B | Lexington school for the Deaf NYC DOB building permits | 10 | Construction Fence · LEXINGTON SCHOOL FOR THE DEAF: INSTALLATION OF +/- 181 LINEAR FEET TEMPORARY POST-INSTALLED CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 7, 2026 |
| B | ELH CONSTRUCTION CO LLC NYC DOB building permits | 10 | Structural · STRUCTURAL SHORING TO SUPPORT BUILDING SIDEWALK AS PER PLANS AND CONCRETE OPENING FOR SHORING INSTALLATION. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 7, 2026 |
| B | MONARCH REALTY HOLDINGS, LLC NYC DOB building permits | 10 | General Construction · Exterior facade repairs as per plans filed. No change in use, egress or occupancy under this application. No product keyword matched | 3 | Oct 7, 2026 |
| B | 80 CPW APARTMENTS CORP NYC DOB building permits | 10 | General Construction · Work includes roof replacement at main roof as shown on drawings and as specified. No change in use, occupancy, or egress. No product keyword matched | 1 | Oct 7, 2026 |
| B | TOWER OWNERS INC. NYC DOB building permits | 10 | Suspended Scaffold · Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy. No product keyword matched | 2 | Oct 7, 2026 |
| B | C & A CLARE RENOVATIONS NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT. REMOVE AND INSTALL NON-STRUCTURAL PARTITIONS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 7, 2026 |
| B | P.T. CONSTRUCTION GROUP NYC DOB building permits | 10 | Structural · Alt 2.Structural work for wood framing at roof.. Maintain structural stability during partial demolition of 2nd and 3rd Floor. New removeable Trex Deck wood support. No product keyword matched | 4 | Oct 7, 2026 |
| B | AGUS HOLDINGS NYC DOB building permits | 10 | Sign · NEW TEMPORARY SIGNAGE (OCTOBER 6, 2026 -MARCH 1, 2027) FOR BUILDING. 42 SF ILLUMINATED AND NON-ILLUMINATED SIGNS. No product keyword matched | 2 | Oct 7, 2026 |
| B | AP. TEK RESTORATION INC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. No product keyword matched | 1 | Oct 7, 2026 |
| B | ABP Management Corp NYC DOB building permits | 10 | General Construction · RENOVATION OF FIRE DAMAGED BUILDING, INCLUDING REMOVAL OF PARTITION; INSTALLATION OF TEMPORARY SHORING WALL. THIS APP. IS RELATED AND MATCHES THE SAME WORK SCOPE WITH THE PREVIOUS APPLICATION# 421743723 AND TO BE REFILED PER BC. ADMIN. CODE 28-105. No product keyword matched | 1 | Oct 7, 2026 |
| B | AIDA LLC NYC DOB building permits | 10 | Foundation · Underpinning design No product keyword matched | 2 | Oct 7, 2026 |
| B | TRANSCEND HOLDINGS INC NYC DOB building permits | 10 | Mechanical Systems · Installation of MS for BAS, 001 and 002 floors as per plans. No product keyword matched | 1 | Oct 7, 2026 |
| B | PERFECTO CONSTRUCTION COR NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION TO INCLIDE RENOVATIONS TO EXISTING 1 FAMILY TOWNHOUSE AS PER DRAWINGS FILED HEREWITH No product keyword matched | 2 | Oct 7, 2026 |
| B | 3114 EQUITIES LLC NYC DOB building permits | 10 | General Construction · RESTORE TO PRIOR LEGAL CONDITION - REMOVE ECB VIOLATION (NO.: 35729145P) - REMOVE ILLEGAL ERECTED FULL HEIGHT METAL FRAMING TO CREATE ADDITIONAL BEDROOM AT APT. #: 3N AS PER PLAN. No product keyword matched | 1 | Oct 7, 2026 |
| B | HONEY HAMMER CORP NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF SUPPORTED SCAFFOLD AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION No product keyword matched | 1 | Oct 7, 2026 |
| B | MAKE IT NICE HOSPITALITY LLC NYC DOB building permits | 10 | Mechanical Systems · Filing for installation of mechanical units for restaurant space on the first floor, in association with general construction application # M01213438-I1. No product keyword matched | 1 | Oct 7, 2026 |
| B | HENRY TECH INC NYC DOB building permits | 10 | General Construction · RENOVATION OF EXIST. RESIDENTIAL HOUSE, REPAIR/REPLACE/NEW PARTITION, WALL, DOOR, WINDOW, CEILING, FLOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 7, 2026 |
| B | HEBREW HOME AT RIVERDALE NYC DOB building permits | 10 | Mechanical Systems · Replacement of hot water radiator. Installation of new fan coil unit in the Stolz Lounge and connection to existing chilled and hot water piping from the Jacob Reingold Pavilion. No product keyword matched | 2 | Oct 7, 2026 |
| B | CBS CORPORATION NYC DOB building permits | 10 | Sprinklers · Sprinkler plans filed herewith to show the cap/removal of 14 sprinkler heads and installation of 9 new sprinkler heads. No change to use, egress, or occupancy. No product keyword matched | 3 | Oct 7, 2026 |
| B | GORA GROUP LLC NYC DOB building permits | 10 | General Construction · Temporary Shoring as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 7, 2026 |
| B | N.Y. SIGN ART INC NYC DOB building permits | 10 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (ZARA) No product keyword matched | 4 | Oct 7, 2026 |
| B | 411 West 55 LLC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Oct 7, 2026 |
| B | PIONEER GENERAL CONSTRUCT NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM FACADE EXTERIOR WORK. FACADE INSPECTION TO BE PERFORMED. SIDEWALK SHED TO BE INSTALLED UNDER SEPARATE APPLICATION. No product keyword matched | 2 | Oct 7, 2026 |
| B | JASMINE PROPERTY GROUP LLC NYC DOB building permits | 10 | Plumbing · INSTALLATION PLUMBING AND SPRINKLER SYSTEM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Oct 7, 2026 |
| B | SPECTRUM NEW YORK METRO LLC NYC DOB building permits | 10 | Construction Fence · temporary construction fence during demolition No product keyword matched | 1 | Oct 7, 2026 |
| B | 481 wythe LLC NYC DOB building permits | 10 | Sprinklers · PROPOSED TO CUT, CAP AND DEMOLISH SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB # B01361537. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 7, 2026 |
| B | J & N Design Group Corp NYC DOB building permits | 10 | Plumbing · TO REPLACE PLUMBING FIXTURES AND GAS COOKING EQUIPMENTS FOR EXISTING RESTAURANT AT 001 FLOOR, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 7, 2026 |
| B | PRO PACE CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · REMOVE THE EXISTING STUCCO AND INSTALL NEW STUCCO TO ADDRESS OATH/ECBVIOLATION NO.: 39188620L. No product keyword matched | 3 | Oct 7, 2026 |
| B | NEW YORK ROAD RUNNERS INC NYC DOB building permits | 10 | General Construction · Install of temp tents, no alt to exist structures for Annual Staten Island Half Marathon. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion No product keyword matched | 2 | Oct 7, 2026 |
| B | Retired Deloitte & Touche partner NYC DOB building permits | 10 | General Construction · General construction to include non-structural demolition associated with the interior renovation of the apartment as per plans filed herewith. No change to occupancy, use or egress under this application. No product keyword matched | 3 | Oct 7, 2026 |
| B | Article Ninth Trust NYC DOB building permits | 10 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF BATHROOMS AND INSTALLATION OF SUMP PUMPS. No product keyword matched | 2 | Oct 7, 2026 |
| B | THE GEORGE UNITS LLC NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - FIDELIS CARE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Oct 7, 2026 |
| B | ATT EUGENE DOLPHIN NYC DOB building permits | 10 | Plumbing · LEGALIZATION FOR WORK PERFORMED WITHOUT A PERMIT. REPLACEMENT OF PLUMBING FIXTURES. REPLACEMENT OF KITCHEN AT SECOND FLOOR AND INSTALLATION OF WASHER AND DRYER. CHANGE OF OCCUPANCY FROM TWO FAMILY TO SINGLE FAMILY DWELLING. No product keyword matched | 2 | Oct 7, 2026 |
| B | JD Plumbing & Heating Maintenance NYC DOB building permits | 10 | Plumbing · Plumbing work for the interior renovation of existing mixed used bldg on Ground floor. All work as per plan submitted. No Change in use, egress or occupancy. No product keyword matched | 3 | Oct 7, 2026 |
| B | AF PARALLEL PROJECTS NYC DOB building permits | 10 | Plumbing · MODIFICATIONS OF EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 2 | Oct 7, 2026 |
| B | BRITANNIA CONDOMINIUM NYC DOB building permits | 10 | Plumbing · TO REMOVE THE EXISTING WATER CLOSET, LAVATORY, SHOWER, AND ASSOCIATED PIPING, IN ORDER TO ADDRESS THE RELATED VIOLATIONS. INSTALLATION OF NEW WATER CLOSET, LAVATORY & ASSOCIATED PIPING AS PER PLANS. NO CHANGE TO USE, EGRESS, OCCUPANCY. No product keyword matched | 2 | Oct 7, 2026 |