Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CH CO INC NYC DOB building permits | 10 | General Construction · EXTERIOR FACADE RENOVATIONS INCLUDING BUT NOT LIMITED TO BRICK REPLACEMENT, LINTEL REPLACEMENT, MORTAR JOINT POINTING, SEALANT REPLACEMENT AMONG OTHER WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 8, 2026 |
| B |
| GOOD HAMMER RESTORATION* NYC DOB building permits |
| 10 |
General Construction · GENERAL CONSTRUCTION WORK TO EXTEND THE ONE (1) APARTMENT RESIDENTIAL USE ON THE 2ND FLOOR, & REMOVE THE DENTAL OFFICE USE. INTERIOR RENOVATION OF EXISTING ONE (1) APARTMENT ON 3RD FLOOR. No product keyword matched |
| 2 |
| Oct 8, 2026 |
| B | CHON PROPERTIES NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING COMMERCIAL AND RESIDENTIAL BUILDING. WORK INCLUES INSTALLATION OF NEW STUCCO AND NEW ROOFING OVERLAY ON THE EX. FINISH. REMOVE EXISTING NON-BEARING PARTITION AND ERACTION OF NEW PARTITIONS. NO CHANGE IN USE OR OCCUPANCY No product keyword matched | 2 | Oct 8, 2026 |
| B | Stream Realty Partners NYC DOB building permits | 10 | Mechanical Systems · Mechanical modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 2 | Oct 8, 2026 |
| B | 56 Arnold Street LLC NYC DOB building permits | 10 | Plumbing · Application is filed for the plumbing work in conjunction with Alt-CO S01412665-I1. No product keyword matched | 2 | Oct 8, 2026 |
| B | GML LIVING TRUST NYC DOB building permits | 10 | Plumbing · PROPOSED PLUMBING WORK ON 1ST FLOOR STORE OF AN EXIST 2 STORY MIXED USE BUILDING. WORKINCLUDES REPLACEMENT OF GREASE TRAP, INSTALL NEW GAS EQUIPMENT AND PLUMBING FIXTURE ATKITCHEN AREA. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 3 | Oct 8, 2026 |
| B | HARMAN CONTRACTING INC NYC DOB building permits | 10 | Foundation · Remove existing front porch , steps, railing. Construct new open concrete front porch , steps , foundation and metal railings. No product keyword matched | 4 | Oct 8, 2026 |
| B | GARWOOD REALTY LLC NYC DOB building permits | 10 | Construction Fence · Temporary construction fence filed in conjunction with DOB NOW job# B01445608-I1 No product keyword matched | 3 | Oct 8, 2026 |
| B | ST. CLEMENT & ST. MICHAEL NYC DOB building permits | 10 | Supported Scaffold · Installation of pipe scaffolding as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. There is no change in use, egress, or occupancy under this application. No product keyword matched | 1 | Oct 8, 2026 |
| B | 334 LEONARD ST LLC NYC DOB building permits | 10 | Plumbing · RE-FILE GAS BOILER & (2) HW HEATERS FILED AND INSTALLED BY EMMANUEL PERAKIS PLUMBER(NOW DECEASED) UNDER LAA APPLICATION #321227953. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 8, 2026 |
| B | 2012 H&A CONSTRUCTION COR NYC DOB building permits | 10 | General Construction · Interior renovation to existing warming pantry as shown on plans. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 8, 2026 |
| B | BILT/DFI INC NYC DOB building permits | 10 | General Construction · MINOR INTERIOR RENOVATION OF A PORTION OF EXISTING APT 10B. RENOVATE KITCHEN, MODIFY EXISTING POWDER ROOM. DEMO AND CONSTRUCT INTERIOR PARTITIONS FINISHES AND CABINETS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 8, 2026 |
| B | OUR LADY OF GUADALUPE NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE SIDEWALK SHED FRONT OF THE BUILDING AT CHRISTOPHER STREET ELEVATION. No product keyword matched | 1 | Oct 8, 2026 |
| B | ART DEVELOPERS GROUP, LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q01412545-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. No product keyword matched | 1 | Oct 8, 2026 |
| B | NEW WORLD EURO CONSTRUCTI NYC DOB building permits | 10 | General Construction · IN UNIT 10C ON FLOOR 10, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Oct 8, 2026 |
| B | 5002 AVE M BK LLC NYC DOB building permits | 10 | General Construction · REPAIR CRACK AND SPALLING BRICK No product keyword matched | 1 | Oct 8, 2026 |
| B | MASTERS DESIGN LAB CORP NYC DOB building permits | 10 | General Construction · ELIMINATION OF OFFICE SPACE AT PARTIAL 3RD FLOOR. AMENDED CERTIFICATE OF OCCUPANCY (CO Number: 120458021F). MINOR INTERIOR PARTITION CHANGES AS PER PLAN. No product keyword matched | 1 | Oct 8, 2026 |
| B | Edken Corp NYC DOB building permits | 10 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 8, 2026 |
| B | FIRST MANAGEMENT 1 LLC NYC DOB building permits | 10 | Construction Fence · HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. No product keyword matched | 1 | Oct 8, 2026 |
| B | Pestana New York East Side 39 LLC NYC DOB building permits | 10 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Oct 8, 2026 |
| B | SHERRY PAINTING AND CONST NYC DOB building permits | 10 | General Construction · APPLICATION FILE TO INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND ELECTRIC EQUIPMENT AT PARTIAL 1st FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 8, 2026 |
| B | MARCO POLO NYC DOB building permits | 10 | Plumbing · APPLICATION FILED IN CONJUNCTION WITH JOB# 440626422 TO INSTALL NEW PLUMBING FIXTURES AND RELOCATE EXISTING PLUMBING FIXTURES. No product keyword matched | 1 | Oct 8, 2026 |
| B | AZARK INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION ON THE CELLAR, MEZZANINE, AND FIRST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 8, 2026 |
| B | STATEN ISLAND FERRY NYC DOB building permits | 10 | Boiler Equipment · Filing to register replacement boiler and burner, removal of oil piping on first floor as per plans filed herewith. No product keyword matched | 2 | Oct 8, 2026 |
| B | DMC PROFESSIONAL CONTRACT NYC DOB building permits | 10 | General Construction · Removal of bathroom finishes and installation of new bathroom finishes. Minor partition udpates unit 10B No change in use, egress or occupancy. No product keyword matched | 1 | Oct 8, 2026 |
| B | VIDA SIGNS NYC DOB building permits | 10 | Plumbing · 1ST FLOOR COMMERCIAL SPACE INTERIOR RENOVATION. INSTALL NON-BEARING PARTITIONS AND PLUMBING FIXTURES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 8, 2026 |
| B | BRUCI CONSTRUCTION SERVIC NYC DOB building permits | 10 | General Construction · Interior work at Apartment #E2K on the 2nd floor. Work to include non-structural demo, minor partition work and associated finishes as per plans. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 8, 2026 |
| B | E. SINANI SERVICES CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING SINGLE FAMILY RESIDENCE AS PER PLANS. NO CHANGE IN USE , OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 8, 2026 |
| B | METRO R SERVICES INC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Oct 8, 2026 |
| B | MHM DESIGN AND STRUCTURE NYC DOB building permits | 10 | Plumbing · PLUMBING WORK FILED HEREWITH IN CONJUNCTION WITH GC JOB#Q01174808-I1 No product keyword matched | 1 | Oct 8, 2026 |
| B | 31 WEST 126 STREET LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 8, 2026 |
| B | AFFORDABLE HANDYMAN CORP NYC DOB building permits | 10 | General Construction · ALT C/O FILED TO RESOLVE OPEN ECB VIOLATIONS 39135055Z & 9135054R. & CONVERT A PORTION OF THE FIRST FLOOR TO AN ANCILLARY DWELLING UNIT IN ACCORDANCE WITH ZR 12-10 and APPENDIX U. Main front entrance of ADU OPENS DIRECTLY to RIGHT-SIDE YARD. No product keyword matched | 1 | Oct 8, 2026 |
| B | AG PARATUS NYC DOB building permits | 10 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 8, 2026 |
| B | 1993 E3, LLC NYC DOB building permits | 10 | Mechanical Systems · PROPOSED MECHANICAL WORK IN CONJUNCTION WITH ALTERATION TYPE 2 DOB NOW JOB # B01056777-I1 No product keyword matched | 1 | Oct 8, 2026 |
| B | Clinker Architects NYC DOB building permits | 10 | General Construction · NTERIOR RENOVATION AND EXTERIOR ALTERATIONS INCLUDING STRUCTURAL WORK. NO CHANGE IN USE OR OCCUPANCY. No product keyword matched | 1 | Oct 8, 2026 |
| B | SITE STRUCTURAL SERVICES NYC DOB building permits | 10 | Antenna · AT&T - Remove 2, replace 6 and relocate 5 antennas on roof. Remove 18 and install 12 RRH units on roof. Retrofit 3 cabinets in existing equipment shelter on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress. No product keyword matched | 1 | Oct 8, 2026 |
| B | JENNY FLORES EXPEDITING INC NYC DOB building permits | 10 | Plumbing · PLAN AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF SANITARY DRAIN AND ESTABLISHMENT OF EASEMENT FOR THE BENEFIT OF 218 GRAHAM AVENUE, BLOCK 2223, LOT 33. No product keyword matched | 1 | Oct 8, 2026 |
| B | FALGUNI DENTAL PLLC NYC DOB building permits | 10 | Plumbing · NEW PLUMBING FIXTURES AND PIPING ROUTES PER NEW DENTAL OFFICE LAYOUT. NEW PLUMBING FIXTURES CALCULATION. NEW RESTROOMS PROVIDED. NO CHANGE TO OCCUPANCY, EGRESS OR USE. No product keyword matched | 1 | Oct 8, 2026 |
| B | CONCORD CONS. OF NEW YORK NYC DOB building permits | 10 | General Construction · REMOVE DETERIORATED AND OUTWARD BULGINGEXISTING BRICKWORK AT EXPOSURE 1 ADJACENT TODECORATIVE CROSS (APPROX. 8'X8')CLEAN SUBSTRATE,INSTALL HELICAL WALL TIES, AND REINSTALL NEW BRICKFINISH T AT #EXP 1 TO COMPLY WITH DOB VIOLATION#PI31601AG NO CHANGE IN USE No product keyword matched | 1 | Oct 8, 2026 |
| B | PRIME RENOVATIONS INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION AND COMBINATION OF APARTMENTS 11A & 11H ON THE 11TH FLOOR PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 8, 2026 |
| B | JN ELECTRICAL CORP NYC DOB electrical permits | 10 | Basement: 11 switches, 15 receptacles, 4 smoke detectors, 15 light fixtures, (1) 200 AMPS 240 Volts main breaker service panel (3 2/0 wire) 1st Floor: 20 switches, 28 receptacles, 4 smoke detectors, 36 light fixtures, 2nd floor: 25 switches, 32 receptacles, 5 smoke detectors, 45 light fixtures, (1) 100 AMPS sub panel (240 Volts single phase) Attic: 1 Switch, 2 light fixtures and 2 receptacles. No product keyword matched | 2 | Oct 8, 2026 |
| B | TOPP WIRE ELECTRIC, INC NYC DOB electrical permits | 10 | ONE NEW OUT DOOR 200AMP 3PHASE SERVICE No product keyword matched | 1 | Oct 8, 2026 |
| B | EMPIRE I ELECTRICAL CORP NYC DOB electrical permits | 10 | 17th Floor No product keyword matched | 1 | Oct 8, 2026 |
| B | FOCUS ELECTRICAL INC NYC DOB electrical permits | 10 | Apt 11CN install lights, receptacles and switches No product keyword matched | 1 | Oct 8, 2026 |
| B | S & V ELECTRICAL CORP NYC DOB electrical permits | 10 | Install lights, receptacles, switches and wire door openers No product keyword matched | 1 | Oct 8, 2026 |
| B | WEBTECH ELEC'L CONTR'S IN NYC DOB electrical permits | 10 | Upgrading of feeder and replacing of inadequate circuit breaker panel to accommodate the installation of washer and drier, also installing 6 reses lights. No product keyword matched | 1 | Oct 8, 2026 |
| B | PRINCIPAL ELECTRIC CORP NYC DOB electrical permits | 10 | RUN NEW DEDICATED LINE FOR ELECTRIC SNOW MELTING MAT ON THE STAIRS AND INSTALL THE SNOW MAT No product keyword matched | 1 | Oct 8, 2026 |
| B | SINCHRONY ELECTRIC INC NYC DOB electrical permits | 10 | Check 3 mini-splits A/C units installed without electrical permit to be sure that the electrical installation is compliance with NYC electrical code and correct any electrical situation that not are into the code No product keyword matched | 2 | Oct 8, 2026 |
| B | KAY ELECTRIC CORPORATION NYC DOB electrical permits | 10 | PROVIDE TEMPORARY POWER FOR TWO CONSTRUCTION TRAILERS, ONE SECURITY BOOTH AND ONE TEMPORARY ROOFTOP WORK PANEL FOR SCA CONSTRUCTION ACTIVITIES. No product keyword matched | 3 | Oct 8, 2026 |
| B | FICAZZOLA CONSULTING LLC NYC DOB building permits | 10 | Solar · Installation of PV System on existing rooftop. No changes to Egress or use of occupancy. No product keyword matched | 2 | Oct 7, 2026 |