Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MULTI-TECH ELECTRIC, INC NYC DOB electrical permits | 10 | PARTIAL WIRING OF A THREE-FAMILY HOUSE WITH EXISTNG PANELS. MINI-SPLIT FOR 2ND FL No product keyword matched | 2 | Oct 12, 2026 |
| B | BIG CITY ELECL SOLUTIONS NYC DOB electrical permits | 10 |
Replace wire from end box to 400 amp disconnect due to wire corrosion. No product keyword matched |
| 4 |
| Oct 12, 2026 |
| B | BULK ELECTRIC LLC NYC DOB electrical permits | 10 | Apt 9A. Install two (2) receptacles and two (2) LED light fixtures on an existing branch circuit. No product keyword matched | 4 | Oct 12, 2026 |
| B | CDM ELECTRICAL LLC NYC DOB electrical permits | 10 | Additional Electrical Meter outdoors with SubPanel for Common Areas indoors. Move service outdoors as requested by ConEdison. No product keyword matched | 1 | Oct 12, 2026 |
| B | JOROB CONTR'G & ELEC'L CO NYC DOB electrical permits | 10 | Closing out an abandoned job from 1986 Application # B000705 No product keyword matched | 3 | Oct 12, 2026 |
| B | BIL-MEL ELECTRIC CORP NYC DOB electrical permits | 10 | Tenant updates and 2500 Amp Service ConEd Case # MC-954012 No product keyword matched | 4 | Oct 12, 2026 |
| B | MNE ELECTRIC INC NYC DOB electrical permits | 10 | NEW OVERHEAD SERVICE FOR EXISTING 2 FAMILY HOUSE. 3 NEW METERS, 1ST FLOOR APT, 2ND FLOOR APT AND PLP METER. 3 NEW ENCLOSURES AS SERVICE/EMERGENCY DISCONNECTS. 3 NEW PANELS AND 3 NEW FEEDERS. RECONNECT ALL EXISTING LOAD TO NEW PANELS. NO OTHER WORK FOR THIS APPLICATION. No product keyword matched | 7 | Oct 12, 2026 |
| B | DOMINICK QUARANTA NYC DOB electrical permits | 10 | working on changing current transformers only No product keyword matched | 1 | Oct 11, 2026 |
| B | ROZ-A-LITE ELECTRICAL CONTR INC NYC DOB electrical permits | 10 | WIRING OF ASSOCIATED POOL EQUIPMENT & BONDING No product keyword matched | 4 | Oct 10, 2026 |
| B | Atria Senior Living NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 1 | Oct 9, 2026 |
| B | RPH Hotels 48th Street Owners, LLC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Oct 9, 2026 |
| B | GILMAN MANAGEMENT CORPORATION NYC DOB building permits | 10 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH ALTCO#M08034336-I1 No product keyword matched | 1 | Oct 9, 2026 |
| B | ULTIMATE SIGNS&DESIGNS CO NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - TD. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 24 | Oct 9, 2026 |
| B | PNA CONTRACTING CORP NYC DOB building permits | 10 | Suspended Scaffold · Renewal of SR23-2631 No product keyword matched | 4 | Oct 9, 2026 |
| B | KATARIA LLC NYC DOB building permits | 10 | General Construction · FILING HEREWITH PLANS AND APPLICATION TO REMOVE FRAME SHED IN REAR YARD, BUILT WITHOUT PERMIT. RESTORE YARD SPACE. NO CHANGE IN USE/EGRESS OR OCCUPANCY. No product keyword matched | 9 | Oct 9, 2026 |
| B | GORDON PROPERTY NYC DOB building permits | 10 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CAFE BAULI. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 7 | Oct 9, 2026 |
| B | TTM GROUP CORP NYC DOB building permits | 10 | Standpipe · PLUMBING WORK AS PER PLANS FILED No product keyword matched | 3 | Oct 9, 2026 |
| B | DESIGN PROCURE BUILD LLC NYC DOB building permits | 10 | General Construction · FILING PLANS TO ADDRESS OPEN WORK WITHOUT PERMIT VIOLATION # 39038520K AND REMOVAL OF NON-LOAD BEARING PARTITION WALLS, REPLACEMENT OF WINDOWS WITH ENLARGED OPENING AT CELLAR REAR WALL. FILING TO ADDRESS STOP WORK ORDER. No product keyword matched | 1 | Oct 9, 2026 |
| B | DHANRAJ ENTERPRISES INC NYC DOB building permits | 10 | General Construction · Application herewith filed to convert existing two story one family to two family. Installation and removal of partitions, work as per plans and to obtain a new C of O. Plumbing work filed as subsequent. No product keyword matched | 1 | Oct 9, 2026 |
| B | NEW AIM REALTY NYC DOB building permits | 10 | Structural · Install steel dunnage on roof for mechanical equipment. No change to use bulk or egress No product keyword matched | 3 | Oct 9, 2026 |
| B | YEUNG REAL ESTATE DEVELOPMENT NYC DOB building permits | 10 | General Construction · Interior renovation of existing office space suite 603 and 604 No change in use, egress or occupancy. No product keyword matched | 3 | Oct 9, 2026 |
| B | ABOUT THE FINISH LLC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING INCONJUNCTION WITH ALTERATION DOB NOW JOB #B01276154-I1. No product keyword matched | 1 | Oct 9, 2026 |
| B | GLOBAL GROUP NY INC NYC DOB building permits | 10 | Construction Fence · EIGHT-FEET HIGH CONSTRUCTION FENCE ALIGNED WITH PROPERTY LINE No product keyword matched | 1 | Oct 9, 2026 |
| B | JMK PAINTING LLC NYC DOB building permits | 10 | General Construction · Partial removal of interior non-load bearing demising wall to combine apartment 3a&3b, erect of nonbearing partitions and replacement of plumbing fixtures. minor interior renovation to existing apartment units, repaint and refinish interior per tppn 3/97 No product keyword matched | 1 | Oct 9, 2026 |
| B | CARLTON HOUSE NYC DOB building permits | 10 | General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 3 | Oct 9, 2026 |
| B | Met Tower Owner LLC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW 6 FIRE SERVICE No product keyword matched | 3 | Oct 9, 2026 |
| B | IVR CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · HORIZONTAL EXTENSION OF EXISTING 2 STORY AT REAR AND CONVERSION FROM 1 FM DU TO 2 FM DU HOUSE WITH MINOR RENOVATION. NO CHANGE USE AND EGRESS. No product keyword matched | 1 | Oct 9, 2026 |
| B | PRECISION BUILD USA INC NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK TYPE FILED IN CONJUNCTION WITH ALT JOB:B01034419-I1 No product keyword matched | 1 | Oct 9, 2026 |
| B | INTERIOR BUILDING SERVICE NYC DOB building permits | 10 | Mechanical Systems · MODIFICATION TO EXISTING MECHANICAL SYSTEM. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 3 | Oct 9, 2026 |
| B | GRAND CONST&DEVEL GR CORP NYC DOB building permits | 10 | Plumbing · PLUMBING, SPRINKLER AND STANDPIPE WORK IN CONJUNCTION WITH NB FILING. No product keyword matched | 9 | Oct 9, 2026 |
| B | LTB MECHANICAL CORP NYC DOB building permits | 10 | Mechanical Systems · New mechanical units on roof, associated with interior renovation of second floor unit. No change to egress, use, or occupancy. No product keyword matched | 3 | Oct 9, 2026 |
| B | MIDBRONX SENIOR CITIZENS COUNCIL IN NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 9, 2026 |
| B | NEW HL SUPERMARKET NYC DOB building permits | 10 | Curb Cut · Construction of new 30' curb cut. No product keyword matched | 4 | Oct 9, 2026 |
| B | JIH BUILDERS GROUP LLC NYC DOB building permits | 10 | Construction Fence · THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR CONSTRUCTION WORK AT 518 ATLANTIC AVENUE, BROOKLYN NY 11217 No product keyword matched | 1 | Oct 9, 2026 |
| B | TRI-NORTH CONTRACTING COR NYC DOB building permits | 10 | Structural · PROPOSED HORIZONTAL ENLARGEMENT OF EXISTING 1 CAR GARAGE AND OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Oct 9, 2026 |
| B | BMB BUILDER INC NYC DOB building permits | 10 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK INCLUDING NEW VRF SYSTEM(S), BOILER, AND KITCHEN, TOILET &LAUNDRY EXHAUST SYSTEMS. No product keyword matched | 3 | Oct 9, 2026 |
| B | JONICO CONSTRUCTION NYC DOB building permits | 10 | General Construction · PROPOSED THREE (3) STORY AND CELLAR, SIX (6) FAMILY DWELLING AS PER PLANS FILED HEREWITH. No product keyword matched | 4 | Oct 9, 2026 |
| B | COMFORT TECH MECHANICAL C NYC DOB building permits | 10 | Mechanical Systems · Additions/Modifications to the mechanical systems in conjunction with combining units 2E and 2F No product keyword matched | 1 | Oct 9, 2026 |
| B | TOP DOG PLBG & HTG CORP NYC DOB building permits | 10 | Plumbing · Modifications to existing plumbing system & related piping for warming pantry. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 9, 2026 |
| B | BUILDING EQUITY MGMT NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Oct 9, 2026 |
| B | PROPERTY OWNER NYC DOB building permits | 10 | General Construction · ALTERATION OF 4-FAMILY INTO 2-FAMILY TO INCLUDE INTERIOR AND EXTERIOR RENOVATION CONSISTING OF REMOVAL & INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITIONS PER LAYOUT CHANGES, REPLACING SELECT DOORS AND WINDOWS, NEW REAR DECK. See comments No product keyword matched | 1 | Oct 9, 2026 |
| B | 127 WEST 79TH STREET NYC DOB building permits | 10 | General Construction · REMOVAL OF NON LOAD BEARING WALL, DOORS AND FLOOR FINISHES AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 5 | Oct 9, 2026 |
| B | WEBB DEVELOPMENT SVC CORP NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING THREE FAMILY HOUSE INCLUDING THE REPLACEMENT OF GYPSUM WALL BOARDS AND PLUMBING FIXTURES. PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 9, 2026 |
| B | ALWAYS ON HVAC INC NYC DOB building permits | 10 | Mechanical Systems · REGISTER HVAC UNITS. No product keyword matched | 1 | Oct 9, 2026 |
| B | CHRIS PR CONSTRUCTION COR NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION INTERIOR RENOVATION OF APARTMENT 10P ON THE 10TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 9, 2026 |
| B | PRASAD MEDICAL PHYSICIAN PC NYC DOB building permits | 10 | Plumbing · New plumbing work as per plan, no change in use egress or occupancy No product keyword matched | 1 | Oct 9, 2026 |
| B | TANEM CONSTRUCTION NYC DOB building permits | 10 | General Construction · INTERIOR DEMOLITION OF EXISTING NON LOAD BEARING PARTITION, RENOVATION OF EXISTING KITCHENAND BATHROO. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 9, 2026 |
| B | ALFONSO'S HOME IMPROVEMEN NYC DOB building permits | 10 | General Construction · HEREWITH FILING FOR REMOVAL OF EXTERIOR VENEER TO BE REPLACED WITH NEW VENEER OF EXISTING (2) TWO STORY WITH CELLAR, (1) ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 5 | Oct 9, 2026 |
| B | URBAN HEALTH PLAN,INC, NYC DOB building permits | 10 | Mechanical Systems · Replacement of (1) gas/electric packaged rooftop unit, including new roof curb adapter, condensate drain piping, and reconnection to existing ductwork and gas piping. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 9, 2026 |
| B | NEXT HORIZON MANAGEMENT NYC DOB building permits | 10 | Construction Fence · Install temporary construction fence as per plans filed, in conjunction with NB #321383105 No product keyword matched | 1 | Oct 9, 2026 |